| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LRejected-Finance PLOT NO 30 KRISHNA COTTAGE SUNDARAM NAGAR MUTHAIPURAM TUTICORIN 628 005 | TUTICORIN | TUTICORIN | TAMIL NADU | 628005 | ₹5.0 L | L1 | Rejected-Finance BQR not satisfied |
| 2 | L2₹5.5 LRejected-Finance | ₹5.5 L | L2 | Rejected-Finance BQR not satisfied |
| Sl No | Description | Qty | Unit | Ramakrishna Enterprises L2 | Sudarsan Ramachandran L1 |
|---|---|---|---|---|---|
| 1.00EXCAVATION OF POLE PITS | |||||
| 1.01 | For pole upto 8.00m length by using JCB/Manual | 1 | Per Pit | 1,000 ₹1,180 | 1,000 ₹1,000 Lowest |
| 1.02 | For pole above 8.00m length by using JCB/Manual | 1 | Per Pit | 1,050 ₹1,239 | 1,050 ₹1,050 Lowest |
| 1.03 | In Hard Soil (common to all size of poles) | 1 | Per Pit | 1,200 ₹1,416 | 1,400 ₹1,400 Lowest |
| 1.04 | In rocky area (common to all size of poles) by blasting / Manual | 1 | Per Pit | 1,700 ₹2,006 Lowest | 2,100 ₹2,100 |
| 2.00ERECTION OF POLES AND ACCESSORIES | |||||
| 2.01 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual | 1 | Per Pole | 1,000 ₹1,180 | 1,050 ₹1,050 Lowest |
| 2.02 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual | 1 | Per Pole | 1,100 ₹1,298 | 1,150 ₹1,150 Lowest |
| 2.03 | Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles | 1 | Per Pole | 1,100 ₹1,298 | 1,150 ₹1,150 Lowest |
| 2.04 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. | 1 | Each set | 900 ₹1,062 | 900 ₹900 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
3 Dec 2025, 2:00 pmClosed
SE/NEDC/OOTY
O/o SE/NEDC/OOTY
Running works contract for execution of erection and dismantling works in HT LT electrical network in sections pertaining to Town Ooty Sub division of Ooty division of Nilgiris EDC
2025_EB_624466_1
Spec. No. 26/2025-26 Dt.18.11.2025
Open Tender
Electrical Works
Works
SE/NEDC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
14 Aug 2026
19 Nov 2025
4 Dec 2025
19 Nov 2025
3 Dec 2025
19 Nov 2025
For pole upto 8.00m length by using JCB/Manual
For pole above 8.00m length by using JCB/Manual
In Hard Soil (common to all size of poles)
In rocky area (common to all size of poles) by blasting / Manual
Fixing of Line Materials
Fixing of LT 3 phase cross arm
Fixing of HT / LT Ti fitting
Fixing of HT Porcelain or Polymer Pin insulator with Pin 11 kv
Fixing of HT Porcelain or Polymer Pin insulator with Pin 22 kv
Fixing of HT Porcelain or Polymer Pin insulator with Pin 33 kv
Fixing of LT PIN insulator
Fixing of HT strain disc 11 KV (1set-6 Nos)
Fixing of HT strain disc 22 KV (1 set-12 Nos)
Fixing of HT strain disc 33 KV (1 set -18 Nos)
Fixing of tapping channel cross arm
Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc..
Fixing of shackle
Fixing of Aluminium knob
Fixing of HT LAS (1 set -3 Nos.)
Fixing of LT LAS (1 set -3 Nos.)
Paving and stringing of conductors of sizes upto 7/2.50mm AAAC or other equivalent conductor
Paving and stringing of conductors of above 7/2.50mm AAAC or other equivalent conductor upto 7/3.15mm AAAC or other equivalent conductor
Paving and stringing of conductors of one run of PVC cable line of all sizes with GI wire and reel insulator.
Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor
Releasing and reerection (resagging) of one run of all sizes of conductor
ERECTION OF DISTRIBUTION TRANSFORMERS:
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangement, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer.
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.
(i) Upto 25 KVA Distribution transformer / Metering set.
(ii) Above 25 KVA to 100 KVA
(iii) Above 100 KVA to 250 KVA
(iv) 500 KVA and above
(V) Failed DT replacement below 100 KVA
(vi) Failed DT replacement 100 KVA and above
Erection of 11 KV single pole Structure including erection of DT complete without centre support
Erection of 11 KV Single Pole structure including erection of DT complete with centre support
ERECTION OF DP STRUCTURE:
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc.,
(i) With 11 KV AB switch using all types of poles of size 9.14 m and above length
(ii) With 22/33 KV AB switch using all types of poles of size 9.14 m and above length
CONCRETING WORKS:Concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + labour)
(i) Mass concreting of poles
(ii) Sleeve concreting
(iii) Stay concreting
EARTHING:
(i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing
(ii) Provision of spike including earthing arrangement
(iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length
(iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination
(v) Replacement of corroded earth pipe
LOADING AND UNLOADING CHARGES:
Upto 100 KVA
Above 100 KVA and upto 500 KVA
Metering set of all ratios
TRANSPORTATION CHARGES:
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM
For a lead upto 5 KM
Above 5 KM of lead of every KM
Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location Upto 1 KM
Above 1 KM per each KM
Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor
(i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
(ii) Transporting of Distribution Transformer / Line materials from stores to office Above 10 KM
Dismantling Charges
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
For breaking the mass concrete of all supports
(i)Dismantling of stay set complete including stay rod
(ii) Dismantling of stay set complete Without stay rod
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
a)Dismantling of Transformer structure materials complete set Double pole
b) Dismantling of Transformer structure materials complete set Single pole
Dismantling of Cross arm clamps TI fitting hardwares, insulators etc.,
PAINTING:
Painting of distribution transformer of all capacities (paint to be supplied by the Board) including cleaning of DT
Numbering of poles including base painting and with cost of paint
Painting of iron poles up to 36 ft length with double coats including cost of paint
Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint
Painting of Cement poles by Distember coating including cost of distember
Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1" to 6" brush to be owned by the contractor)(Paint to be supplied by Department)
Service Connection Details painting
MISCELLANEOUS WORKS:
Hut service connection works (All labour charges except making connection to the over head line)
Fixing of one set of street light fixture with clamp and fitting of all sizes including cable jumpering and including transportation
Dismantling of one set of street light fixture with clamp and fitting of all types
Erection of Mercury Vapour/Sodium Vapour/LCD/LED Lamps including wiring and fixing at street light location including transportation(irrespective of rating)
Replacing the worn out service connection cables
Provision of guarding with two numbers earth pits excluding stay set erection
(i) Flat guarding with earth pit
(ii) Split neutral
(iii) DT yard cleaning
WORKSHOP CHARGES:
Manufacturing / Altering of Clamps
Drilling of holes in the structure materials clamps etc.,
AB switch or open type side arm stud, cutting and drilling holes
Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe
GENERAL:
Numbering of Poles including cost of paint
Removing weed in substation yard / office premises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
runningcontracttownooty.pdf
Tender Documents • 1.26 MB
BOQ_746773.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].