| Sl No | Description | Qty | Unit | Aiga Engineers Pvt Ltd L2 | A K CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m First depth (0m to 2.0m) Collection Sump -1 [Iyyan Eri near Uzhavar santhai ] | 40 | M3 | 280 ₹11,200 | 94 ₹3,760 Lowest |
| 2.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m First depth (0m to 2.0m) Collection Sump -2 [Iyyan Eri Cuddalore main road ) | 50 | M3 | 280 ₹14,000 | 94 ₹4,700 Lowest |
| 3.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m First depth (0m to 2.0m) Collection Sump -3 [Chidambaram m. road ) | 32 | M3 | 280 ₹8,960 | 94 ₹3,008 Lowest |
| 4.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m First depth (0m to 2.0m) Collection Sump -4 [Nadesanar Nagar Vengalathu Eri ] | 20 | M3 | 280 ₹5,600 | 94 ₹1,880 Lowest |
| 5.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m second depth (2.00m -3.0m) Collection Sump -1 [Iyyan Eri near Uzhavar santhai ] | 19 | M3 | 250 ₹4,750 | 103.5 ₹1,966.5 Lowest |
| 6.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m second depth (2.00m -3.0m) Collection Sump -2 [Iyyan Eri Cuddalore main road ) | 23 | M3 | 250 ₹5,750 | 103.5 ₹2,380.5 Lowest |
| 7.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m second depth (2.00m -3.0m) Collection Sump -3 [Chidambaram m. road ) | 14 | M3 | 250 ₹3,500 | 103.5 ₹1,449 Lowest |
| 8.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m second depth (2.00m -3.0m) Collection Sump -4 [Nadesanar Nagar Vengalathu Eri ] | 9 | M3 | 300 ₹2,700 | 103.5 ₹931.5 Lowest |
| 9.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of Third depth (3.00m -4.00m) Collection Sump -1 [Iyyan Eri near Uzhavar santhai ] | 19 | M3 | 350 ₹6,650 | 114.5 ₹2,175.5 Lowest |
| 10.00 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of Third depth (3.00m -4.00m) Collection Sump -2 [Iyyan Eri Cuddalore main road ) | 23 | M3 | 350 ₹8,050 | 114.5 ₹2,633.5 Lowest |
Tender Value
₹4 Cr
EMD Value
₹4 L
Closing Date
22 Jun 2026, 3:00 pmClosed
COMMISSIONER VADALUR MUNICIPALITY
MUNICIPALITY OFFICE VADALUR
INTERCEPTION AND DIVERSION I AND D WORKS FOR VADALUR MUNICIPALITY
2026_MAWS_679729_1
848/2025/SBM1
Open Tender
Civil Works - Others
Works
VADALUR MUNICIPALITY
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4 L
VADALUR MUNICIPALITY OFFICE
16 Jul 2026
6 Jun 2026
22 Jun 2026
6 Jun 2026
22 Jun 2026
6 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m First depth (0m to 2.0m) Collection Sump -1 [Iyyan Eri near Uzhavar santhai ] | 40 | M3 | - | - |
| 2 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m First depth (0m to 2.0m) Collection Sump -2 [Iyyan Eri Cuddalore main road ) | 50 | M3 | - | - |
| 3 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m First depth (0m to 2.0m) Collection Sump -3 [Chidambaram m. road ) | 32 | M3 | - | - |
| 4 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m First depth (0m to 2.0m) Collection Sump -4 [Nadesanar Nagar Vengalathu Eri ] | 20 | M3 | - | - |
| 5 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m second depth (2.00m -3.0m) Collection Sump -1 [Iyyan Eri near Uzhavar santhai ] | 19 | M3 | - | - |
| 6 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m second depth (2.00m -3.0m) Collection Sump -2 [Iyyan Eri Cuddalore main road ) | 23 | M3 | - | - |
| 7 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m second depth (2.00m -3.0m) Collection Sump -3 [Chidambaram m. road ) | 14 | M3 | - | - |
| 8 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m second depth (2.00m -3.0m) Collection Sump -4 [Nadesanar Nagar Vengalathu Eri ] | 9 | M3 | - | - |
| 9 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of Third depth (3.00m -4.00m) Collection Sump -1 [Iyyan Eri near Uzhavar santhai ] | 19 | M3 | - | - |
| 10 | Earth work Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of Third depth (3.00m -4.00m) Collection Sump -2 [Iyyan Eri Cuddalore main road ) | 23 | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.42 MB
BidDocument.pdf
Tender Documents • 0.65 MB
PRICEBID.pdf
Tender Documents • 0.20 MB
BOQ_816659.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].