Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
27 Mar 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer/DEDC/Dindigul
O/o.Superintending Engineer/TANGEDCO/Dindigul
Improvement works in toilet building in odc division in DEDC
2025_EB_531976_1
ETC.No.04(24-25)
Open Tender
Civil Works
Works
Dindigul
Please refer tender docuuments
3 documents required · 3 mandatory
₹0
₹5,000
20 Dec 2025
12 Mar 2025
28 Mar 2025
12 Mar 2025
27 Mar 2025
12 Mar 2025
Amount
Earthwork excavation in all soils for foundation with necessary shoring strutting, dewatering including the cost of all labour, shoring & strutting dewatering, transportation, loading, unloading,lead,lift, T&P etc complete.
Earth work excavation for foundation in hard stiff clay, Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and depositiong on bank with an initial lead & lift of 10 mts & 2 mts, etc., complete
Filling with M- sand complying with standared specification for filling watering and compaction layer for filling foundation and basement course including cost of all materials, lead, lift, labour for laying concrete etc.,
Plain Cement Concrete 1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc.,
Random rubble masonry in CM 1:5 for foundation including cost of all materials, labour, curing, leads and lifts, etc. Complete
Random rubble masonry in CM 1:5 for foundation including cost of all materials, labour, curing, leads and lifts, etc. Complete
R.C.C 1:1.5:3 using 12 to 20 mm HBGS jelly for plinth beam concrete including cost of all material, labour, centering and shuttering, laying, vibrating with vibrators, finishing, curing, etc but excluding cost of reinforcement gril, complete
R.C.C 1:1.5:3 using 12 to 20 mm HBGS jelly for man hole cover slab concrete including cost of all material, labour, centering and shuttering, laying, vibrating with vibrators, finishing, curing, etc but excluding cost of reinforcement gril, complete
Supplying and fabricating and placing in position of TMT Rods for Pillar including cutting, bending,placing in position and tieing asper std specification including cost of steel,binding wire etc. Complete
Brick work in Cement Mortar 1:5 using II-Class Table mounted Chamber burnt Bricks of size 9” x 4 3 / 8” x 2 3 / 4” including cost of all materials, leads, lifts, labour etc., complete.
Supplying and fixing of solid PVC door shutters using 19 guage 19 mm MS square tubes for syles and outer frames,15 mm MS squre tubes for top, lock and bottom rails and the steel tubes shall be covered woth 5 mm thick soild PVC sheets.(The overall size of shallbe 50 mm x 30 mm and of frames shall be 50 mm x45 mm, with suitable rebate for housing the shutter. The overall size of top rail, lock rail and bottom rail shall be 75 mmx30 mm) and fixing shutter using 5 mm thick solid PVC sheets for panelling shall be rigidly fixed in position including cost of all materials, necessary furniture and fittings, lead, lift, etc complete.Door size 0.75 x1.75m.
Pointing with CM 1:3in Existing CR masonry 20mm thick including cost of all materials, labour, lead,lift, T&P etc complete
Plastering with Cement mortar in CM 1:5 10mm thick for concrete surface for out side and inside all levels, including cost of all materials, lead, lift, labour, T& P, curing, etc, complete.
supply, Fabrication and erection of steel rafters, purlins as directed by the department engineer in charge including cost of all materials labour,lead, lift, T&Ps etc complete..
Providing Everest or Charminar or UPAL brand corrugated asbestos cement Sheet of size 6.00 mm Sheet as directed by the Department Engineer in charge including cost of all materials lead, lift, T&Ps etc., complete.
Colour washing inside with Oil Bound Distempering two coats with one coat of white cement as base coat in all foors including cost of all materials ,lead,lifts etc complete-
Painting the outside wall with two coats of best quality emulsion of approved colour over a exterior primer coat of all materials, etc., complete. and as directed by the Engineer incharge of the work.
Painting new steel work with two coats of synthetic enamel paint over a coat of red oxide primer including cost of all materials, lead, lifts, labour etc., complete.
stage.html
html • 0.03 MB
technical_633181.pdf
PDF • 0.07 MB
techsummary_633181.pdf
PDF • 1.16 MB
finance_633181.pdf
PDF • 0.07 MB
BOQ Comparative Chart
xlsx • 0.01 MB
cancelled_1.pdf
pdf • 0.11 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_633181.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .