Loading…
Loading…
Tender Value
₹83.8 L
EMD Value
₹1.7 L
Closing Date
18 Jun 2026, 5:00 pm3d left
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Primary School Building in School Campus and Boundary Wall at Village- Ballukheda, YEA WC-06
2026_YEIDA_1157329_52
YEA/GM(PROJECT)/2026/517 DT-04/06/2026
Open Tender
Civil Works
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,020
₹1.7 L
9 Jun 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil in all type of foundation trenches including dressing of the side and ramming of bottom. Lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. All kinds of soil. (MORTH/A.R./YEIDA/Based on UPPWD/SOR-2020)) Depth from 0.0 to 1.5 M below G.L. | 1 | Cum | 1 | ₹1 |
| 2Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Kms. from 'the site of work and including watering, dressing etc. labour and T&P etc. required for the proper complition of the work. saplings of girth upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish upto a of cleared.50 M. out side the periphery of area distance (UPPWD/SOR-2020/255) | |||||
| 3Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (UPPWD/SOR-2020/281) | |||||
| 4 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20%. (DAR/2.34.1/Based on UPPWD/SOR-2020)) | - | Ltr | 1 | - |
| 5 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration (DAR/2.35.3.1/Based on UPPWD/SOR-2020)) | - | sqm | 1 | - |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level. (DAR/5.33.1/Based on UPPWD/SOR-2020)) | 1 | Cum | 1 | ₹1 |
| 7 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). | - | Cum | 1 | - |
| 8.01 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 1 | sqm | - | - |
| 8.02 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Suspended floors, roofs, landings, balconies and access platform (DAR/5.9.3/Based on UPPWD/SOR-2020)) | - | sqm | - | - |
| 8.03 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Lintels, beams, plinth beams, girders, bressumers and cantilevers. (DAR/5.9.5/Based on UPPWD/SOR-2020)) | 1 | sqm | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
52.pdf
Tender Documents • 1.23 MB
BOQ_2171232.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid