Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹36.2 L+₹4.6 L (14.5%)Rejected-AOC | L2 | Rejected-AOC Other than Lowest Bidder | |
| 3 | L3₹33.2 L+₹1.6 L (5.17%)Rejected-AOC | L3 | Rejected-AOC Other than Lowest Bidder | |
| 4 | Rejected-Technical HOUSE NO 2 SATGAON MAIN ROAD NEAR BAILEY WATER FACTORY P O UDAYAN VIHAR DIST KAMRUP METRO GUWAHATI ASSAM 781171 | GUWAHATI | KAMRUP METRO | ASSAM | 781171 | - | Rejected-Technical Not enlisted in appropriate category |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
12 Feb 2020, 6:00 pmClosed
GE NARANGI
GE Narangi C/O 99 APO Guwahati
OUTSOURCING OF SERVICES FOR OPERATION OF DG SETS AT FAD CROPS ZONAL WKSP FCSR SUB AREA AND ABOD DEPOT AREA UNDER GE NARANG
2020_MES_315812_1
8514/B/E8
Open Tender
Civil Works
Item Rate
337 days
GE NARANGI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE NARANGI
₹72,000
Yes
7 Mar 2020
17 Jan 2020
15 Feb 2020
17 Jan 2020
12 Feb 2020
1 Feb 2020
Amount
SCHEDULE 'A' PART-I
Outsourcing of services for running of standby DG sets including logging of running records, minor day to day repairs, upkeep of installation and reporting of occurences at the installation by 01 x FGM (semi Skilled labour) each shift consisting of following location metioned on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs 3rd Shift : 2200 Hrs to 0600 Hrs located at the following installation for a period of 337 Days FAD DG Sets capacity 160 KVA & Adm Area
Outsourcing of services for running of standby DG sets including logging of running records, minor day to day repairs, upkeep of installation and reporting of occurences at the installation by 01 x FGM (semi Skilled Lobour) each shift consisting of following location metioned on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs 3rd Shift : 2200 Hrs to 0600 Hrs located at the following installation for a period of 337 Days CZW (Old ABW) DG Sets capacity 2 x 380 KVA
Outsourcing of services for running of standby DG sets including logging of running records, minor day to day repairs, upkeep of installation 01 x FGM (semi Skilled labour) each shift and reporting of occurences at the installation by consisting of following location metioned on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs 3rd Shift : 2200 Hrs to 0600 Hrs located at the following installation for a period of 337 Days FCSR Signal Center DG Sets capacity 2 x 100 KVA
Outsourcing of services for running of standby DG sets including logging of running records, minor day to day repairs, upkeep of installation 01 x FGM (semi Skilled Labour) each shift and reporting of occurences at the installation by consisting of following location metioned on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs 3rd Shift : 2200 Hrs to 0600 Hrs located at the following installation for a period of 337 Days HQ Sub Area OTM DG Sets capacity 75 KVA
Note:- (i) Staff employed by the contractor shall carry out daily carefully cleaning, greasing of pumps, motors, panel boards, DG sets and internal portion of pump house building, outdoor panel boards and maintain pump house in presentable condition all time all as specified and directed. (ii) The contractor shall carry out routine check and maintain check sheet daily/weekly/monthly and upkeep the installation, rectify normal troubleshooting, replacement of gland packing of pumps, motors and sluice valve in pump houses and delivery valves of overhead tank and minor parts like nut, bolts, washers, coupling rubber, star packing etc. (iii) Contractor/ Rep of Contractor will maintain log sheet daily and submit to department duly completed along with attendance sheet and payment register. (iv) Contractor shall submit the requsite certificates and experience before commencement of work all as specified and directed. (v) The rate of petty stores i.e nut bolts, washer, coupling rubber, star packing, gland rope, grease are included in above quoted rate. (vi) No T&P will be issued by the department for doing the above work, it shall be arranged and provided by the contractor like PH testing kit, chlorine test kit, tubidity test kit, pipe wrench, screw driver, sluice valve opening/ closing kit, cutter plier, digging tools etc at his own cost basis. (vii) The contractor shall provide a proper uniform for the tradesmen which will be specified/ directed by Engr-in-Charge.
G.K. TRADERS
OM CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .