Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC VILLAGE BUDMAJRA NEAR BALONGI SALES TAX BARRIER DISTRICT MOHALI PUNJAB | MOHALI | MOHALI | PUNJAB | ₹2.1 Cr | L1 | Accepted-AOC L1 Lowest bid |
| 2 | L2₹2.1 CrRejected-AOC HOUSE NO 244175 V P O BEHMAN DIWANA BATHINDA BATHINDA PUNJAB 151001 INDIA | 244175 | ₹2.1 Cr | L2 | Rejected-AOC L2 Higher Bid |
| 3 | L3₹2.1 CrRejected-AOC 1 VISHWAS NAGAR PO NFL GONIANA ROAD BATHINDA PUNJAB 151003 | BATHINDA | PUNJAB | 151003 | ₹2.1 Cr | L3 | Rejected-AOC L3 higher bid |
| 4 | L4₹2.2 CrRejected-AOC 155 SHAMPURA COLONY BELA ROAD RUPNAGAR 140001 | RUPNAGAR | RUPNAGAR | PUNJAB | 140001 | ₹2.2 Cr | L4 | Rejected-AOC L4 Highest Bid |
| 5 | Not Admitted-Finance GRAIN MARKET GONIANA BATHINDA | BATHINDA | BATHINDA | PUNJAB | - | - | Not Admitted-Finance System rejected due to Highest value quoted |
| Sl No | Description | Qty | Unit | Gill Engineering Pvt. Ltd. L1 | CHOPRA ENGINEERING WORKS L2 | M/S SODHI ERECTORS L4 | DHALIWAL CONSTRUCTION CO L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Routine/ Preventive, Breakdown & Shutdown Maintenance of C&I Equipments/Instruments, Measurement & Interlock System, Annunciation System, Flue Gas Analyzers, Steam & Water Analysis System, etc., installed at 2X210MW Stage-I and 2X250MW Stage-II, Guru Hargobind Thermal Plant (GHTP), Lehra Mohabbat, Distt.: Bathinda, Punjab as per details given in the tender specifications | 24 | Months | 8,64,000 ₹2.1 Cr | 8,88,000 ₹2.1 Cr | 9,29,400 ₹2.2 Cr | 8,95,000 ₹2.1 Cr |
| Sl.NoBidder Name | |||||||
| 1 | M/S SODHI ERECTORS (BID ID -723444) | 2,07,36,000 | Not Quoted | - | - | - | - |
| 2 | Gill Engineering Pvt. Ltd. (BID ID -720269) | 2,07,36,000 | Not Quoted | - | - | - | - |
| 3 | CHOPRA ENGINEERING WORKS (BID ID -723862) | 2,07,36,000 | 20653056.00 | - | - | - | - |
| 4 | DHALIWAL CONSTRUCTION CO (BID ID -723860) | 2,07,36,000 | 20673792.00 | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹5.5 L
Closing Date
24 Feb 2026, 5:00 pmClosed
Dy CE, Control and Instrumentation, GHTP
Dy CE, Control and Instrumentation, GHTP, Lehra Mohabbat, 151111
Routine,Preventive,Breakdown and Shutdown Maintenance of CI Equipments Instruments, Measurement and Interlock System, Annunciation System, Flue Gas Analyzers, SWAS, etc., installed at GHTP, Lehra Mohabbat, Punjab as per details for two years
2026_POWER_157880_1
417/GHTP/CI/MI/AMC/M-125/Vol-1
Open Tender
Power/Energy Projects/Products
731 days
Dy CE, Control and Instrumentation, GHTP
Bidders will have to get themselves registered before participation
2 documents required · 2 mandatory
₹2,360
₹5.5 L
19 May 2026
15 Jan 2026
2 Mar 2026
15 Jan 2026
24 Feb 2026
15 Jan 2026
Routine/ Preventive, Breakdown & Shutdown Maintenance of C&I Equipments/Instruments, Measurement & Interlock System, Annunciation System, Flue Gas Analyzers, Steam & Water Analysis System, etc., installed at 2X210MW Stage-I and 2X250MW Stage-II, Guru Hargobind Thermal Plant (GHTP), Lehra Mohabbat, Distt.: Bathinda, Punjab as per details given in the tender specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
M125TenderSpecifications.pdf
Tender Documents • 0.68 MB
BOQ_320153.xls
BOQ • 0.27 MB
M125Technocommercialbidproforma.pdf
Tender Documents • 0.06 MB
Download all tender documents and submit your bid