| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance | -57.50% | ₹4.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 L+₹4,390.97 (0.94%)Admitted-Finance | -57.10% | ₹4.7 L+₹4,390.97 (0.94%) | L2 | Admitted-Finance |
| 3 | L3₹7.6 L+₹2.9 L (62.9%)Admitted-Finance | -30.79% | ₹7.6 L+₹2.9 L (62.9%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-No documents uploaded |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
5 Jun 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer Thathri
Urgent Repair Renovation and Addition Alteration of various PWD RNB Buildings falling under the jurisdiction of PWD RNB Division Thathri during the Financial year 2026 27
2026_PWDJK_311200_1
e-NIT NO. 09 OF 2026-27
Open Tender
Civil Works
Percentage
365 days
Thathri
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer PWD Division Thathri
₹20,000
Yes
16 Jun 2026
30 May 2026
6 Jun 2026
30 May 2026
5 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 meters lead as per direction of Engineer incharge: 1:4:8 or leaner mix (i/c equivalent design mix) | 1 | Cum | 1,064.55 | ₹1,064.55 |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 1 | Cum | 2,516.85 | ₹2,516.85 |
| 3 | Extra for cutting reinforcement bars manually / by mechanical means in RCC or R.B work (payment shall be made on the cross sectional area of RCC or R.B Work) | 1 | Sqm | 905.75 | ₹905.75 |
| 4 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work | 1 | Kg | 6.95 | ₹6.95 |
| 5 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 1 | Cum | 1,458.45 | ₹1,458.45 |
| 6 | Removing mortar from bricks and cleaning bricks incl. stacking with a lead of 50 Mtrs (Stacks of cleaned bricks shall be measured) from brick work in cement mortar | 1 | No. | 4.94 | ₹4.94 |
| 7Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead : | |||||
| 7.1 | Of area of 3 sqm. and below | 1 | Each | 285.25 | ₹285.25 |
| 7.2 | Of area beyond 3 sqm | 1 | Each | 390.5 | ₹390.5 |
| 8Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead : | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1007699.xls
BOQ • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .