| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-Finance | L1 | Accepted-Finance Lower Rate | |
| 2 | L2₹12.2 L+₹29,096.47 (2.45%)Accepted-Finance | L2 | Accepted-Finance Higher Rate |
| Sl No | Description | Qty | Unit | MARAN BROTHERS L1 | SPK ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Material Cost (Contractor Scope) MS Channel 150 x 75
Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) | 1.45 | MT | 68,487 ₹99,306.15 Lowest | 70,174 ₹1,01,752.3 |
| 2.00 | Material Cost (Contractor Scope) MS angle 75x75x8mm thick
Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) | 0.73 | MT | 65,356 ₹47,709.88 Lowest | 66,966 ₹48,885.18 |
| 3.00 | Material Cost (Contractor Scope) MS angle 50x50x6mm thick
Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) | 0.97 | MT | 65,356 ₹63,395.32 Lowest | 66,966 ₹64,957.02 |
| 4.00 | Material Cost (Contractor Scope) MS plate 8mm thick
Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) | 1.84 | MT | 85,362 ₹1,57,066.08 Lowest | 87,464 ₹1,60,933.76 |
| 5.00 | Material Cost (Contractor Scope) MS plate 12mm thick
Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) | 2.55 | MT | 85,362 ₹2,17,673.1 Lowest | 87,464 ₹2,23,033.2 |
| 6.00 | Material Cost (Contractor Scope) MS Rod ø20mm
Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) | 0.05 | MT | 40,346 ₹2,017.3 Lowest | 41,340 ₹2,067 |
| 7.00 | Labour Cost : Dismantling by cutting and removal of existing eroded/corroded structural material in CWPH Butterfly valve operating platform and man hole dummy plate in western side fore bay and devolute the scrap materials to store including cost of consumables and T&P. | 3.79 | MT | 8,928 ₹33,837.12 Lowest | 9,148 ₹34,670.92 |
| 8.00 | Labour Cost : Leading, lifting and transportation of Iron and Steel materials from store to site including hire charges including cost of consumables & T&P. | 7.59 | MT | 5,365 ₹40,720.35 Lowest | 5,497 ₹41,722.23 |
| 9.00 | Labour Cost : Fabrication and Erection of Steel Structural material at ground level in CWPH Butterfly valve operating and man hole dummy plate in western side forebay including cost of consumable & T&P. | 7.59 | MT | 57,827 ₹4,38,906.93 Lowest | 59,251 ₹4,49,715.09 |
| 10.00 | Labour Cost : Painting of Newly erected structures with one coat of protective coating of self priming Epoxy primer and two coats of Epoxy HB coal tar paint using different shades after thorough scrapping with emery sheets with manual labour and as per the direction and satisfaction of the Engineer in charge, the rate including the cost of scaffolding, T&P labour, lead, lift etc., complete. | 166 | Metre Square | 517 ₹85,822 Lowest | 529 ₹87,814 |
Tender Value
Refer Docs
EMD Value
₹12,600
Closing Date
29 Jul 2025, 2:00 pmClosed
The Chief Engineer
The Chief Engineer, North Chennai Thermal Power Station - I, Chennai - 120
NCTPS I Operation Circle CA Dn CWPH Renewal of Worn out deteriorated Butterfly Valve operating platform and manhole dummy plate in western side of fore bay area
2025_EB_581884_1
CE/NCTPS-I/SE/OPN/30/2025-26
Open Tender
Power/Energy Projects/Products
Works
60 days
NCTPS - I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,600
Yes
9 Sept 2025
15 Jul 2025
30 Jul 2025
15 Jul 2025
29 Jul 2025
15 Jul 2025
Amount
Material Cost (Contractor Scope) MS Channel 150 x 75 Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.)
Material Cost (Contractor Scope) MS angle 75x75x8mm thick Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.)
Material Cost (Contractor Scope) MS angle 50x50x6mm thick Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.)
Material Cost (Contractor Scope) MS plate 8mm thick Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.)
Material Cost (Contractor Scope) MS plate 12mm thick Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.)
Material Cost (Contractor Scope) MS Rod ø20mm Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.)
Labour Cost : Dismantling by cutting and removal of existing eroded/corroded structural material in CWPH Butterfly valve operating platform and man hole dummy plate in western side fore bay and devolute the scrap materials to store including cost of consumables and T&P.
Labour Cost : Leading, lifting and transportation of Iron and Steel materials from store to site including hire charges including cost of consumables & T&P.
Labour Cost : Fabrication and Erection of Steel Structural material at ground level in CWPH Butterfly valve operating and man hole dummy plate in western side forebay including cost of consumable & T&P.
Labour Cost : Painting of Newly erected structures with one coat of protective coating of self priming Epoxy primer and two coats of Epoxy HB coal tar paint using different shades after thorough scrapping with emery sheets with manual labour and as per the direction and satisfaction of the Engineer in charge, the rate including the cost of scaffolding, T&P labour, lead, lift etc., complete.
SPK ENTERPRISES (BID ID -1413084)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .