Tender Value
₹13.5 L
EMD Value
₹32,000
Closing Date
30 Jun 2026, 5:00 pm2d left
Similar tender results from the same govt authority in the past 3 years.
GM-CIVIL
Main Administrative Building Sector-6 Noida
D/o Village (Work of creating, opening and fixing of MS Jaal on the culvert in village Mamura),Noida
2026_NOIDA_1163072_1
30/DGM/SM(WC-05)/2025-26
Open Tender
Civil Works
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,416
NOIDA
₹32,000
24 Jun 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
30 Jun 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 19.11 | Cum | 5,214.8 | ₹99,654.83 |
| 2 | Cement plaster (1:3) finished with a floating coat of neat cement.12 mm Cement Plaster | 144.6 | Sqm | 226.59 | ₹32,764.91 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform | 164.5 | Sqm | 385.68 | ₹63,444.36 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,364.16 | Kg | 82.81 | ₹2,78,586.09 |
| 5 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix is payable/recoverable separately).All works upto plinth level | 21.21 | Cum | 7,912.32 | ₹1,67,820.31 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 31.35 | Cum | 6,753.45 | ₹2,11,720.66 |
| 7 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 5,199.54 | kg | 92.34 | ₹4,80,125.52 |
| 8 | Supply of labour complete at site on etc in all respect as per direction of engineer-in-charge. | 30 | Per Day | 394.9 | ₹11,847 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_2180328.xls
BOQ • 0.35 MB
Capability.xls
Additional Documents • 0.04 MB
TD.pdf
Tender Documents • 5.29 MB
Download all tender documents and submit your bid