Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.5 CrAccepted-AOC | ₹83.5 Cr | L1 | Accepted-AOC Single lowest bidder. |
Tender Value
₹86.4 Cr
EMD Value
₹1.1 Cr
Closing Date
14 Dec 2018, 6:00 pmClosed
Sr. Manager (Engg-Civil)
CHQ-NR, B-Block, 3rd Floor, Room No. 372, Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi -110003
Establishment of New Civil Enclave at Adampur (Pb.) - On Design and Build Basis (i/c Civil, Mechanical, Electrical, Plumbing, Fire Fighting, HVAC, Airport System, IT, Furniture and Furnishing and other Ancillary Buildings).
2018_AAI_16223_1
AAI/CHQ-NR/Engg(C)/ADP/CE
Open Tender
Civil Works
365 days
Adampur
As per WNIT
7 documents required · 7 mandatory
₹11,200
Airports Authority of India
₹1.1 Cr
4 May 2022
18 Oct 2018
20 Dec 2018
19 Oct 2018
14 Dec 2018
16 Nov 2018
19 Oct 2018 - 5 Nov 2018
Amount
CIVIL WORKS
All design works including but not limited to concept/ schematic design, detailed design, Architectural Drawings, Structural Design, Interior Design, Landscape Design, Working drawings, Shop drawings and As Built drawings of Works.
Execution of all Civil works for Terminal Building (Gr. Floor + First Floor) including RCC Works, Masonary Works, Structural Steel Works, Roofing System, Façade System, Aluminium Composite Panel, Tubeline Metal Ceiling, etc. as per drawings.
All internal works including finishing but not limited to Masonry Work, Staircase, Lift Shaft, Plaster, Internal Partitions, Doors, Windows, Fittings & Fixtures, Painting, Interior Finishing Works, Flooring, Stainless Steel Railing, False Ceiling, Raised/Access Flooring etc. as per approved drawing and specifications as per direction of EIC.
Cubical Toilets as per the approved layout & design but not limited to complete plumbing and sanitary work, flooring, wall tiling, false ceiling, all fittings and fixtures, wash basin, water closet, mirrors, sensor urinals, etc. complete as per direction of EIC.
Furniture & Furnishing of VIP room, Check-in-counters, Frisking booth counter, Manual Baggage Check Counters as per drawings, S.S. Que–Management System, SS dustbins, Modular Mattings, SS Bollards, Planters etc.
Tensile Fabric Canopy of approved make and shade as per approved Design, Drawings and Specifications and directions of EIC.
City Side Facia/Architectural Feature in city side elevation, having top finish with solid acrylic surface of approved make and shade as per approved Design, Drawings and Specifications all complete as per drawings and directions of EIC.
Site Development including Construction of City Side Roads & Approach Roads/Air Side Roads in front of Terminal Building, Car Parking, Kerbs, Footpaths etc. Note: Type of Construction of Car Park and City/Air Side Roads etc. - Rigid Pavements.
Landscaping works, Water body & Horticulture works.
Operational Boundary wall (Segregating Air Side & City Side Area), Gates at entry & exit including Guard Rooms/ Morchas/ Security Booths. Note: Length of Boundary wall = 280 Mtrs. Approx.
Miscellaneous Works viz. Bore well-02 Nos., Under Ground Static Tank, Rain Water Harvesting (Civil Works), Internal & External Water Supply System, Drainage System, Storm Water Drainage etc.
All Civil Works for Sewage Treatment Plant (STP)-50 KLD and Solid Waste Disposal System.
Utility buildings – Execution of all civil works for Substation cum Office Building/Pump Room but not limited to RCC Framed Structure, Masonary works, Flooring, finishing works, Rolling Shutters, Doors, Windows, all fittings and fixtures etc. including provision of water storage tanks for various uses etc. complete in all respect. Approximate Area of Substation Building - 600 Sqm
ELECTRICAL WORKS
Sub-station work i/c DG sets with synchronization panels, Transformers, HT & LT Panels, Cabling, APFC with detuned filters, Earthing and UPS (for lighting), batteries and battery charger etc.
Internal and External EI, Light & power plug points, Hand driers, lighting, External Lightings i/c car park & approach road,street lighting, lightning protection, Automatic Sliding Door etc.
HVAC,hot water generation system, VRV/VRF, IBMS, inline fans,air curtains etc.
Elevator 13 pax
Indoor & outdoor ( i/c emergency) signages (illuminated & non illuminated).
Water Supply System/ Public Health Engineering i/c hydropneumatic Pumps, Borewell Pumps, starters, Water Treatment Plant, water coolers with inbuilt RO etc.
Sewage treatment Plant with MBBR technology
Addressable Fire detection & Alarm System
Fire Hydrant,Fire Sprinkler System, gas suppression system & Portable fire extinguishers
Solar power plant
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of all Automatic Sliding Doors after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of UPS (for lighting) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of HVAC System (i/c BMS) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Fire Alarm and Detection System Gas Suppression system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
Airport Systems & IT Systems
SITC of Public address & voice alarm system & car calling system, Surveillance Close circuit TV system (SCCTV), Flight Information Display System (FIDS), UPS (for AS&IT), IP EPABX system i/c telephone/intercom instruments.
SITC of Passive and Active Networking components, Wi-fi system.
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of SCCTV system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of IP EPABX after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of FIDS system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of UPS (for AS&IT) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking , Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). First year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking , Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Second year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking , Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Third year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking , Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fourth year after DLP
All inclusive Comprehensive Maintenance of Passive & Active Networking , Wi-Fi system after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours). Fifth year after DLP
Note 1: All works to be carried out as per conceptual drawings/ design intent enclosed with tender documents with all materials, labour, T & P, machinery, equipment, consumables, deployment of suitable Technical personnel for supervision, quality assurance and quality control etc. complete and work to be completed based on approved architectural, structural drawings, specifications, design parameters and as per directions of Engineer-in-Charge including obtaining necessary approvals and NOCs from the concerned authorities. 2. Detailed scope of work as given in the AAI’s requirement – Tender Document may also be referred. 3. The information contained in these Tender Documents, being indicative in its nature, are being provided for the limited purposes of enabling the Tenderers to prepare a tender. These Tender Documents are a summary of available information and no reliance shall be placed on any information or statements contained herein, and no liability is or will be accepted by the AAI in relation to the accuracy, adequacy or completeness of such information or statements made, nor shall it be assumed that such information or statements will remain unchanged. 4. By filling the lump sum price bidder have carefully considered all aspects of the Works, including the designs, specifications, scope of work, methodologies, programs and cost plans including without limitation any aspects relating to all of the Background Information and have carried out all necessary checks, investigations and enquiries of its own, executing and completing the works as per standards including commissioning to the satisfaction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid