Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC DAV SCHOOL WALI GALI NEAR BUS STAND NARWANA JIND HARYANA 126116 | NARWANA | JIND | HARYANA | 126116 | L1 | Accepted-AOC Accept | |
| 2 | L2₹13.8 L+₹1.4 L (10.9%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹13.9 L+₹1.5 L (11.8%)Rejected-Finance | L3 | Rejected-Finance Reject |
Tender Value
₹15.8 L
EMD Value
₹31,601
Closing Date
17 Feb 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PESHAL KUMAR
Executive Engineer Jind
UPGRATION OF e LIBRARY 1 VILLAGE CHATTAR BLOCK UCHANA DISTT JIND 2 VILLAGE SURBRAH BLOCK UCHANA DISTT JIND 3 VILLAGE KALODA KALAN BLOCK NARWANA DISTT JIND
2023_HRY_256100_1
20231C3068C8 FD06 42EB ADE9 EC714502944B701DEV
Open Tender
Civil Works
Works
60 days
KALODA KALAN CHHATTER SURBRAH
UPGRATION OF e LIBRARY 1 VILLAGE CHATTAR BLOCK UCHANA DISTT JIND 2 VILLAGE SURBRAH BLOCK UCHANA DISTT JIND 3 VILLAGE KALODA KALAN BLOCK NARWANA DISTT JIND
2 documents required · 2 mandatory
₹1,000
Yes
₹31,601
Yes
5 Mar 2023
1 Feb 2023
17 Feb 2023
3 Feb 2023
17 Feb 2023
3 Feb 2023
Amount
NS items
S/E of 45 watt LED street light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells) make including making necessary connetions
S/E of 20 Watt LED Tube light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells) make including all patty material required to complete the job in all respect
S/E of 36 Watt LED 600x600 mm surface pannel light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells/ Halonix make including all patty material required to complete the job in all respect
S/E of 45 watt LED street light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells) make including making necessary connetions
S/E of 2 ton split AC (Daikin/ O General/ Mitsubishi) including cost of M.S. stand , Stablizer,and 9 ft copper pipe.
Bidder Name
Amount
ANIL PUNIA CONTRACTOR(GSTN-NA)
THE HATHO COOP L&C SOCIETY LTD(GSTN-NA)
THE DHARODI NAIN COOP LANDC SOCIETY LTD DHARODI(GSTN-NA)
THE HATHO COOP L&C SOCIETY LTD
ANIL PUNIA CONTRACTOR
THE HATHO COOP L&C SOCIETY LTD
THE DHARODI NAIN COOP LANDC SOCIETY LTD DHARODI
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .