Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical HOUSE NO 144 NIRALA PATH CHURCH ROAD BARIDIH BASTI JAMSHEDPUR | Accepted-Technical Substantially Responsive |
| 2 | Accepted-Technical ASHOK PATH RADIAM ROAD RANCHI JHARKHAND | RANCHI | JHARKHAND | 834001 | Accepted-Technical Substantially Responsive |
| 3 | Accepted-Technical KACHHI BALIHARI PUTKI DHANBAD | DHANBAD | JHARKHAND | 818142 | Accepted-Technical Substantially Responsive |
| 4 | Accepted-Technical | Accepted-Technical Substantially Responsive |
| 5 | Accepted-Technical BASDIHA DUMARIYA SONARAYTHADI DEOGHAR | Accepted-Technical Substantially Responsive |
Tender Value
₹10.8 Cr
EMD Value
₹21.7 L
Closing Date
28 May 2026, 5:00 pmClosed
EE RWD WORKS DIVISION, DEOGHAR
EE RWD WORKS DIVISION, DEOGHAR
Construction of Road from PWD Salmandra to REO Road Khijuriatanr via Paharidih Kashidih Barbad Jaypura Dhawatanr(Length-10.8 km.)RWD/EE/DEOGHAR/43/2024-25
2026_RWD_114172_1
RWD/EE/DEOGHAR/43/2024-25
Open Tender
Civil Works
Percentage
540 days
DEOGHAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹21.7 L
Yes
18 Jul 2026
18 May 2026
29 May 2026
18 May 2026
28 May 2026
18 May 2026
18 May 2026 - 28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete pavement Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately | 366 | Cum. | 442.6 | ₹1,61,991.6 |
| 2 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area by manual means | 2.26 | Ha | 19,760.3 | ₹44,658.28 |
| 3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Manual means:- In area of light jungle | 2.27 | Ha | 88,499.5 | ₹2,00,893.87 |
| 4 | Compacting Original ground Case I Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction. | 243 | Cum. | 52.6 | ₹12,781.8 |
| 5 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 239.6 | Cum. | 62.4 | ₹14,951.04 |
| 6 | Construction of Embankment with Material Deposited from Roadway Cutting. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.Rate per cum after adding royalty@Rs 27.48/cum | 1,655.13 | Cum. | 61.48 | ₹1,01,757.39 |
| 7 | Construction of Subgrade and Earthen
Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 46,540.85 | Cum. | 131.3 | ₹61,10,813.61 |
| 8 | By Mix in Place Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material | 6,040.8 | Cum. | 2,234.16 | ₹1,34,96,113.73 |
| 9 | Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 87.1 | Cum. | 3,534.33 | ₹3,07,840.14 |
| 10 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 4,192.76 | Cum. | 2,536.98 | ₹1,06,36,948.26 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
DOUBLEBIDSALMANDRA.pdf
Tender Documents • 0.39 MB
BOQ_154195.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .