| 1 | L1₹20.0 LAccepted-Finance | ₹20.0 L | L1 | Accepted-Finance ok |
| 2 | L2₹21.5 L+₹1.5 L (7.45%)Accepted-Finance | ₹21.5 L+₹1.5 L (7.45%) | L2 | Accepted-Finance ok |
| 3 | L3₹21.7 L+₹1.7 L (8.60%)Accepted-Finance | ₹21.7 L+₹1.7 L (8.60%) | L3 | Accepted-Finance ok |
| 4 | L4₹22.1 L+₹2.2 L (10.8%)Accepted-Finance | ₹22.1 L+₹2.2 L (10.8%) | L4 | Accepted-Finance ok |
| 5 | L5₹27.1 L+₹7.2 L (35.9%)Accepted-Finance | ₹27.1 L+₹7.2 L (35.9%) | L5 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | DEEPAK KUMAR L4 | M.S. SAROJ ENTERPRISE L2 | M/S D.A. ENGINEERING WORKS L3 | M K TRADERS L1 | M/S SHRI BALAJI ELECTRICALS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Providing/Supply and erection of the Following Decentralised Material by Contractor with all the Accessories to the site. Erection should be complete at site with all respect.(as per resspo norms), | ||||||||
| 1.01 | Supply of HDPE Pipe PE-80, PN-6, DN-200mm dia Pipe for laying of 11KV, 3x185sq.mm cable | 280 | Mtr. | 1,200 ₹3,36,000 | 1,400 ₹3,92,000 | 1,400 ₹3,92,000 | 800 ₹2,24,000 Lowest | 1,500 ₹4,20,000 |
| 1.02 | Stone pad | 232 | Nos. | 300 ₹69,600 | 220 ₹51,040 | 100 ₹23,200 Lowest | 240 ₹55,680 | 100 ₹23,200 Lowest |
| 1.03 | Holding clamp for cross arm/Tee chennal/guarding clamp with nut bolt | 241 | Nos. | 300 ₹72,300 | 250 ₹60,250 | 125 ₹30,125 Lowest | 250 ₹60,250 | 200 ₹48,200 |
| 1.04 | Danger Board With Clamp | 88 | Nos. | 300 ₹26,400 | 210 ₹18,480 | 125 ₹11,000 Lowest | 450 ₹39,600 | 200 ₹17,600 |
| 1.05 | F braket | 174 | Nos. | 300 ₹52,200 | 210 ₹36,540 | 200 ₹34,800 Lowest | 200 ₹34,800 Lowest | 200 ₹34,800 Lowest |
| 1.06 | Grouting of pole | 246 | Nos. | 500 ₹1,23,000 | 450 ₹1,10,700 | 400 ₹98,400 Lowest | 1,100 ₹2,70,600 | 900 ₹2,21,400 |
| 1.07 | Stay Complete | 57 | Nos. | 550 ₹31,350 Lowest | 550 ₹31,350 Lowest | 700 ₹39,900 | 650 ₹37,050 | 3,000 ₹1,71,000 |
| 1.08 | Concreating Of Stay | 49 | Nos. | 320 ₹15,680 | 320 ₹15,680 | 200 ₹9,800 | 150 ₹7,350 Lowest | 400 ₹19,600 |
| 1.09 | Earthing complete | 247 | Nos. | 360 ₹88,920 | 360 ₹88,920 | 300 ₹74,100 Lowest | 500 ₹1,23,500 | 1,000 ₹2,47,000 |
Tender Value
₹22.1 L
EMD Value
₹22,500
Closing Date
11 Jun 2026, 10:00 amClosed
SE EDC Dhampur
SE EDC Dhampur
11KV line construction and bifurcation related work under EDC Dhampur in BP-2026-27
2026_PVVNL_1155362_1
06/2026-27
Open Tender
Electrical Works
Item Rate
90 days
EDC Dhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Yes
SE EDC Dhampur
₹22,500
Yes
20 Jun 2026
29 May 2026
11 Jun 2026
29 May 2026
11 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing/Supply and erection of the Following Decentralised Material by Contractor with all the Accessories to the site. Erection should be complete at site with all respect.(as per resspo norms), | |||||
| 1.01 | Supply of HDPE Pipe PE-80, PN-6, DN-200mm dia Pipe for laying of 11KV, 3x185sq.mm cable | 280 | Mtr. | - | - |
| 1.02 | Stone pad | 232 | Nos. | - | - |
| 1.03 | Holding clamp for cross arm/Tee chennal/guarding clamp with nut bolt | 241 | Nos. | - | - |
| 1.04 | Danger Board With Clamp | 88 | Nos. | - | - |
| 1.05 | F braket | 174 | Nos. | - | - |
| 1.06 | Grouting of pole | 246 | Nos. | - | - |
| 1.07 | Stay Complete | 57 | Nos. | - | - |
| 1.08 | Concreating Of Stay | 49 | Nos. | - | - |
| 1.09 | Earthing complete | 247 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TDoc06.pdf
Tender Documents • 1.22 MB
BOQ_2164321.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .