Tender Value
₹43.1 L
EMD Value
₹43,500
Closing Date
15 Jan 2026, 10:30 pmClosed
Rural Development and Panchayat Raj Department
Construction of cc road and drain from Singonahalli Village in Adaguru GP Gubbi Tq
253871
RDPR/2025-26/RD/WORK_INDENT21985
Reserved
Roads
RDPR Division Office Tumkur
₹1,080
₹43,500
1 Jan 2026
1 Jan 2026
16 Jan 2026
12 Jan 2026
Construction of cc road and drain from Singonhalli Village in Adaguru GP Gubbi Tq
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Surface Drains in Soil Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankm...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
RCC Pipe NP 2 Light duty non presure pipe 300 mm dia m With all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges cost and conveyance of all materi...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Appendix I - Additionnalities for form work, centering 35% With all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges cost and conveyance of all ma...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/we...
Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and ...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Compacting original ground supporting embankment: Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Granular Sub-base - Grading III: Construction of Granular Sub-Base by Mix in Place Method by providing well graded Gravel, spreading in uniform layers with motor grader on prepared surface, mixing by ...
Wet Mix Macadam (Plant Mix Method):- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanica...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), c...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad...