Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC Quoted less than Tender Value | |
| 2 | L2₹10.0 L+₹11,571.89 (1.17%)Rejected-AOC LOCATION TAMIL NADU TN | VELLORE | TAMIL NADU | 632001 | L2 | Rejected-AOC Quoted more than Tender Value |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
12 May 2025, 3:00 pmClosed
The Block Developement Officer Anaicut
The Block Developement Officer Anaicut
Vellore DistrictCONSTRUCTION 3 SPAN R.C.C. SLAB CULVERT at PERIYA PANAPARAI IN PEENJAMANDHAI PANCHAYAT Anaicut BlockNNT 2025-26Package 7
2025_RDTN_551428_1
A2/1127/2024
Open Tender
Civil Works
Item Rate
180 days
The Block Developement Office Anaicut
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹20,000
11 Jun 2025
25 Apr 2025
12 May 2025
25 Apr 2025
12 May 2025
25 Apr 2025
Amount
Vellore DistrictCONSTRUCTION 3 SPAN R.C.C. SLAB CULVERT @ PERIYA PANAPARAI IN PEENJAMANDHAI PANCHAYAT Anaicut BlockNNT 2025-26Package 7
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, as per SS 20B complete. with small sized boulders
Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete
Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Reinforcement Cement Concrete 1: 1.5: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Both side supply filling Gritty Gravel including all cost and all labour charges etc..
Provision of Nameboard Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.MAHENDIRAN (BID ID -1333211)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_658238.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .