| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC 3 176 ARULJOTHI NAGAR KARANAMPETTAI SULUR VIA COIMBATORE 641401 | COIMBATORE | TAMIL NADU | 641401 | ₹1.7 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.7 Cr+₹1.4 L (0.80%)Rejected-Finance 1 129 KOOLANAICKENPATTI GOMANGALAM POLLACHI TAMILNADU 642107 | COIMBATORE | TAMIL NADU | 642107 | ₹1.7 Cr+₹1.4 L (0.80%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | V KALIESWARAN L2 | SRI MURUGAN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.001. Strengthening of kadambadi-chinnaiyan kovil road to Devarayampalayam road (R165) H/O Kadampadi | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete | 2,355 | Sqm | 6 ₹14,130 | 4 ₹9,420 Lowest |
| 3.00 | Picking the existing mettaled surface and sectioning including all labour charges etc, complete. | 2,000 | Sqm | 25 ₹50,000 | 23 ₹46,000 Lowest |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 602.41 | Cum | 2,100 ₹12,65,061 | 2,095 ₹12,62,048.95 Lowest |
| 5.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 6,024 | Sqm | 85 ₹5,12,040 | 83 ₹4,99,992 Lowest |
| 6.00 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | 6,024 | Sqm | 22 ₹1,32,528 | 19.5 ₹1,17,468 Lowest |
| 7.00 | Providing and laying 50mm consolidated thick bituminous macadam using 0.20 cum fo 26.50- 13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification.(Bituminous Macadam 50mm thick Using Vibratory Roller) | 301.21 | Cum | 8,930 ₹26,89,805.3 | 8,925 ₹26,88,299.25 Lowest |
| 8.00 | Providing and laying Bituminious concrete 40MM which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 150.59 | Cum | 11,750 ₹17,69,432.5 | 11,700 ₹17,61,903 Lowest |
| 9.00 | Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. Km 0/0-1/00 | 471 | Cum | 5 ₹2,355 | 1.35 ₹635.85 Lowest |
| 10.00 | Supplying and fixing of Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete | 1 | No | 2,750 ₹2,750 | 2,730 ₹2,730 Lowest |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
25 Jun 2025, 3:00 pmClosed
Additional Collector (Dev), Coimbatore
DRDA, Coimbatore
Strengthening of the road 2 nos in Sulur Block - Package No TN 02-56 in Sulur Block of Coimbatore District Under NABARD RIDF 2024-25
2025_RDTN_568555_1
DIPR/2266/Tender/2025 dated 06.06.2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.0 L
DRDA, Coimbatore
20 Aug 2025
13 Jun 2025
25 Jun 2025
13 Jun 2025
25 Jun 2025
17 Jun 2025
17 Jun 2025
Amount
1. Strengthening of kadambadi-chinnaiyan kovil road to Devarayampalayam road (R165) H/O Kadampadi
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Picking the existing mettaled surface and sectioning including all labour charges etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying 50mm consolidated thick bituminous macadam using 0.20 cum fo 26.50- 13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification.(Bituminous Macadam 50mm thick Using Vibratory Roller)
Providing and laying Bituminious concrete 40MM which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508.
Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. Km 0/0-1/00
Supplying and fixing of Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing of Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing of Name board cum Citizen board including painting and lettering as directed by the departmental officers etc., complete
Providing and erecting of Retro - reflectorized cautionary , Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type - IV standards of IRC - 67: 2012 and ASTM D -09, Specification a
60cm Circular sign board
60 cm Equilateral triangle cautionary signboard
60 cm Equilateral triangle
90 cm Equilateral triangle
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
2.Strengthening of Pathuvampalli to Nallagoundanpalayam (R131) H/O Paduvampalli
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Picking the existing mettaled surface and sectioning including all labour charges etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying 50mm consolidated thick bituminous macadam using 0.20 cum fo 26.50- 13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification.(Bituminous Macadam 50mm thick Using Vibratory Roller)
Providing and laying Bituminious concrete 40MM which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508.
Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. Km 0/0-1/00
Supplying and fixing of Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing of Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing of Name board cum Citizen board including painting and lettering as directed by the departmental officers etc., complete
Providing and erecting of Retro - reflectorized cautionary , Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type - IV standards of IRC - 67: 2012 and ASTM D -09, Specification a
60cm Circular sign board
60 cm Equilateral triangle cautionary signboard
60 cm Circular
60 cm Equilateral triangle
90 cm Equilateral triangle
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V KALIESWARAN (BID ID -1377645)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .