Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9,744Qualified Make: NA
Model: Strapping Roll 18 204 MAITHAN AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | Make: NA
Model: Strapping Roll | L1 | Qualified MII | |
| 2 | L2₹9,912+₹168 (1.72%)Qualified Make: NA
Model: Strapping Roll PLOT NO 34A SECTOR I SECTOR 1 CIDCO SERVICE INDUSTRIAL AREA SHIRVANE THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Make: NA
Model: Strapping Roll | L2 | Qualified MII | |
| 3 | L3₹25,200+₹15,456 (158.6%)Qualified Make: NA
Model: Semi-Automatic Strapping Roll (white) 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | Make: NA
Model: Semi-Automatic Strapping Roll (white) | L3 | Qualified MII | |
| 4 | L4₹30,600+₹20,856 (214.0%)Qualified Make: NA
Model: Semi-Automatic Strapping Roll (white) SURVEY NO 254 P1 MORBI RAJKOT HIGHWAY TANKARA MORBI RAJKOT GUJARAT 363650 | MORBI | GUJARAT | 363650 | Make: NA
Model: Semi-Automatic Strapping Roll (white) | L4 | Qualified MII | |
| 5 | L5₹37,800+₹28,056 (287.9%)Qualified Make: NA
Model: Semi-Automatic Strapping Roll (white) PLOT 08A B1 EXTN BLOCK B 1 EXTN SEWAK PARK UTTAM NAGAR SOUTH WEST DELHI 110059 UDYAM DL 10 0005677 | WEST DELHI | DELHI | 110059 | Make: NA
Model: Semi-Automatic Strapping Roll (white) | L5 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
29 Nov 2025, 6:00 pmClosed
Strapping Roll (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Past Performance
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6869003 Dated : 08-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8563307
GEM/2025/B/6869003
Two Packet Bid
Strapping Roll (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Past Performance
28 days
INDORE
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
20%
Exempted
8 Nov 2025
8 Nov 2025
29 Nov 2025
Strapping Roll (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Past Performance
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6869003 Dated : 08-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8563307.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .