Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC CANAL COLONY BANBASA DISTRICT CHAMPAWAT UTTARAKHAND | CHAMPAWAT | UTTARAKHAND | 262309 | L1 | Accepted-AOC Accepted,BeingL-1 | |
| 2 | L2₹3.0 L+₹28,309.28 (10.3%)Rejected-Finance | L2 | Rejected-Finance Rejected,BeingL2 | |
| 3 | L3₹3.2 L+₹45,300.46 (16.5%)Rejected-Finance | L3 | Rejected-Finance Rejected,BeingL3 |
| Sl No | Description | Qty | Unit | FEROZ KHAN CONRACTOR L2 | RAHUL KUMAR MOURYA L3 | JAGDISH CHANDRA SHRIVASTAVA L1 |
|---|---|---|---|---|---|---|
| 1.00 | V.R.B. or bridge clearance labour,material and T & P etc as directed by Engineer- in-Charge required for completion of work. | 2 | No. | 1,233 ₹2,466 | 1,296 ₹2,592 | 1,200 ₹2,400 Lowest |
| 2.00 | Cleaning thick bushes and thorny jungle without uprooting. labour,material and T & P etc as directed by Engineer- in-Charge required for completion of work. | 1,610 | Sqm. | 5 ₹8,050 | 5.28 ₹8,500.8 | 3 ₹4,830 Lowest |
| 3.00 | M-150 Brick work in 1:4 cement and sand mortar up to 3m. Lift and 60 m. lead of material including cost of all labour,material and T & P etc as directed by Engineer- in-Charge required for completion of work. | 13.54 | Cum. | 5,877 ₹79,574.58 Lowest | 6,176 ₹83,623.04 | 5,900 ₹79,886 |
| 4.00 | Cement Pointing in 1:2 (Struck deep) on Brick masonary with cement and sand mortar up to 3m. height including cost of all labour,material and T & P etc as directed by Engineer- in-Charge required for completion of work. | 164.87 | Sqm. | 153 ₹25,225.11 | 161 ₹26,544.07 | 135 ₹22,257.45 Lowest |
| 5.00 | Finishing walls with Acrylic Smooth exterior paint of required shade Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface as required including cost of all material, labour and T&P etc as directed by Engineer- in-Charge required for completion of work. | 258.56 | Sqm. | 114 ₹29,475.84 | 120 ₹31,027.2 | 100 ₹25,856 Lowest |
| 6.00 | Paiting D.R.B./V.R.B. parapets for Chainage writing including cost of labour,material and T & P etc as directed by Engineer- in-Charge required for completion of work. | 2 | Sqm. | 6 ₹12 Lowest | 70 ₹140 | 50 ₹100 |
| 7.00 | Priting letter on D.R.B./V.R.B. parapets for including cost of labour,material and T & P etc as directed by Engineer- in-Charge required for completion of work. | 100 | Nos. | 13 ₹1,300 | 14 ₹1,400 | 10 ₹1,000 Lowest |
| 8.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer- in-Charge required for completion of work. | 1,853.52 | Cum. | 85 ₹1,57,549.2 | 90 ₹1,66,816.8 | 75 ₹1,39,014 Lowest |
Tender Value
₹3.2 L
EMD Value
₹8,000
Closing Date
4 Sept 2025, 11:00 amClosed
Executive Engineer ,Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Purani Sharda Deva Poshak Nahar ke Km. 2.202 Per Sthit DRB V Km. 4.822 Per Sthit VRB ki Safai, Marmmart Avm Rangai Putai ke Karan.
2025_UPIDC_1067347_1
E-Tender Notice No 03/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
30 days
Banbasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹8,000
Yes
30 Oct 2025
26 Aug 2025
4 Sept 2025
26 Aug 2025
4 Sept 2025
26 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .