| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 CrAccepted-AOC | ₹12.7 Cr Quoted ₹21.5 Cr | L1 | Accepted-AOC Accepted Being Lowest RATE |
| 2 | L2₹21.5 CrRejected-Finance | ₹21.5 Cr | L2 | Rejected-Finance REJECTED Being HIGHER RATE |
Tender Value
₹21.5 Cr
EMD Value
₹32.3 L
Closing Date
24 Feb 2025, 12:00 pmClosed
office of the se.ayo.ambe.circle.pwd.ayodhya
office of the se.ayo.ambe.circle.pwd.ayodhya
Janpad Ayodhya me Ayodhya Prayagraj Marg se Nikalne Vale Airport Marg ke Dayen se Nikalkar Medical College evam Airport Ke Terminal-2 Tak 4 Lane marg ka nirman karya
2025_CEUFZ_1006453_1
805/2com ayo-ambe-circle/2025 dt. 10.02.2025
Open Tender
Civil Works - Roads
450 days
office of the se.ayo.ambe.circle.pwd.ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹32.3 L
Yes
office of the se.ayo.ambe.circle.pwd.ayodhya
19 May 2025
17 Feb 2025
24 Feb 2025
17 Feb 2025
24 Feb 2025
17 Feb 2025
18 Feb 2025
Amount
Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness .
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)By Mechanical Means - Non bituminous (ETA) - as per MORT&H Spec. Clause 202 (ii B) (Sr. No. 2.05)
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, within all lifts and lead upto 30m.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of Granular Sub-Base (Retrieved ETA Material) by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401 (Labour and Machinary Rate Only)
Construction of Granular Sub-Base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in machenical mix plant carriage of mixed material by tipper to site , laying of 1% OPC cement and 3.5% emulsion in uniform layers with paver in sub-base / base course on well prepared surface and compacing with vibratory roller to achieve the desired density.
Recycled DBM Grade-I - Providing and laying dense graded bituminous macadam with HMP 200 TPH using crushed aggregate of specified grading premixed with bituminous binder @ 4.0% of total mix (on fresh material-70%) and 2.4% on recycled material (30%) Recycling pavement by cold milling of existing bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 per cent of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as specified in clause 519 - as per MORT&H Spec. Clause 519 (Sl. No. 5.13-B(ii))
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Earth work in excavation in trench for foundation in ordinary soil i/c lift upto 1.50 mtr. & lead upto 50.00 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed bu the E/I within a distance of 50 m.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant transit mixer & manual placing
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Mild steel or iron work of small sizes and sections such as holding down bolts, holds fast, tie rods, grating etc. (when not included in over all rates) wrought to required form, including supply of steel bolts, nuts and wastage etc, and their fixing required for proper completion of work.
Class-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth i/c supply of all material, labour, curing and tools and plants etc. required for proper completion of the work.
Struck pointing on brick work in 1:2 cement mortar (1 cement & 2 fine sand) including supply of all material, labour and T&P etc. required for proper completion of work
Providing and laying of 900mm dia Hume pipe i/c and cartage
Plaster 15 mm thick in 1:3 cement & coarse sand mortar
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade on M-15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 (95% of Total Length)
Providing and laying matt finished vitrified tile of size 600x600x15mm having water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in out door floors such as footpath, court yard multi models etc., laid on 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as direction of Engineer-in-Charge.16.88 Size of Tile 600x600x15 mm
Providing and laying of hot applied thermoplastic compound 2.50 mm thick in 100mm widh including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.50 mm is exclusive of surface applied glass beads as per IRC:35. The finished Surface to be level, uniform and free from streaks and holes.
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 1st year maintenance cost @ 0.00%.
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 2nd year maintenance cost @ 0.25%.
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 3rd year maintenance cost @ 0.50%.
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 4th year maintenance cost @ 0.75%.
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 5th year maintenance cost @ 1.0%.
SUBEDAR SINGH CONTRACTOR (BID ID -4973321)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf