Tender Value
₹1.0 L
EMD Value
₹1,300
Closing Date
14 Sept 2026, 6:00 pm2d left
SAE KAMPTEE NAGPUR AREA
SAM OFFICE KAMPTEE SUB AREA
Providing portable security cabin in JNC hospital under Kamptee Sub Area.(2nd Call)
2026_WCL_364788_1
na3250-civ-e-tender 03-2026-27
Open Tender
Civil Works - Others
Percentage
30 days
KAMPTEE SUB AREA
AS PER NIT
3 documents required · 3 mandatory
₹1,300
2 Sept 2026
2 Sept 2026
15 Sept 2026
2 Sept 2026
14 Sept 2026
3 Sept 2026
2 Sept 2026 - 7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1.35 | Cum | 200.85 | ₹271.15 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | 2,191.15 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | - | Cum | 6,309.15 | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | Cum | 7,974.6 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | - | Sqm | 306.9 | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars | 51.75 | Kg | 95.25 | ₹4,929.19 |
| 7 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand). | - | Sqm | 275.95 | - |
| 8 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm). | 1.52 | Sqm | 134.05 | ₹203.76 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 0.23 | Cum | 153.4 | ₹35.28 |
| 10 | Providing and fixing security cabin of size 6'x4'x8', interior of MDF ( pre laminated), Exterior of 1mm GI corrugated, Isulation: Glasswool, Finsh: Epoxy paint and primer, with Door: 01 nos, window: 02 Nos of size (2.5'x3'), cabin with fan : 01 nos, LED tubelight: 01 Nos, Bulkhead: 01 nos, AC switch and MCB: 01 nos including transportion at site and Pre approved quality as per instruction of enginner in charge | 1 | Nos | 65,550 | ₹65,550 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.92 MB
BOQ_377708.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .