| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC 83 158 4 VMS COMPLES RSP NAGAR ELLIS NAGAR POST DHARAPURAM TALUK TIRUPPUR DISTRICT | ERODE | TAMIL NADU | 638051 | ₹11.6 L | L1 | Accepted-AOC BID ACCEPTED HENCE L1 BIDDER |
| 2 | L2₹11.8 LRejected-AOC | ₹11.8 L | L2 | Rejected-AOC BID REJECTED HENCE L2 BIDDER |
| Sl No | Description | Qty | Unit | S Kuppusamy L1 | shree construction L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burying and burning 1 etc., complete. | 316.8 | SQM | 6 ₹1,900.80 | 6 ₹1,900.80 |
| 2.00 | Earth work excavation and depositing on bank within initial lead and lift in hard | 158.4 | CUM | 140 ₹22,176 | 140 ₹22,176 |
| 3.00 | Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m | 293.75 | CUM | 23 ₹6,756.25 | 23 ₹6,756.25 |
| 4.00 | Collection and supply of gritty gravel from approved quarry including all labour 4 charges for spreading and compaction with power roller etc. complete, for Shoulders | 66 | CUM | 569.3 ₹37,573.80 | 569.3 ₹37,573.80 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 110.16 | CUM | 2,589.5 ₹2.9 L | 2,589.5 ₹2.9 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 881.25 | CUM | 89.5 ₹78,871.88 | 89.5 ₹78,871.88 |
| 7.00 | Providing and laying Tack coat over BM surface using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of 7 material, labour charges, rentals for machinery, fuel and all other incidental char | 881.25 | CUM | 21 ₹18,506.25 | 21 ₹18,506.25 |
| 8.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density f etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 22.04 | CUM | 11,937 ₹2.6 L | 11,937 ₹2.6 L |
| 9.00 | T JUCTION | 1 | NO | 19,996 ₹19,996 | 19,996 ₹19,996 |
| 10.00 | Provision for Km stone and Hm stone | 1 | NO | - | - |
Tender Value
₹11.8 L
EMD Value
₹12,000
Closing Date
24 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICE VP, DHARAPURAM
BLOCK DEVELOPMENT OFFICE VP, BDO OFFICE DHARAPURAM
Strengthening to the Road from Kavandachipudhur - Poolavadi Road to Sarathamani House Road Km 0/0 - 0/220 H/o Kavundachiputhur Panchayat
2026_RDTN_659047_1
3951/2025/A3
Open Tender
Civil Works
KAVUNDACHIPUTHUR
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹12,000
Yes
BDO OFFICE, DHARAPURAM
10 Mar 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
20 Feb 2026
Clearing the Scrub jungle including all labour charges for burying and burning 1 etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard
Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m
Collection and supply of gritty gravel from approved quarry including all labour 4 charges for spreading and compaction with power roller etc. complete, for Shoulders
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over BM surface using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of 7 material, labour charges, rentals for machinery, fuel and all other incidental char
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density f etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
T JUCTION
Provision for Km stone and Hm stone
I) KM STONES
II) HM STONES
Provision for Scheme Name board
Provision for Sign board
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Rumble strips
Provision for Road studs
Provision for Pipe Culvert Ch :- 10 m
Dismantling Existing CD Work Ch :- 10
Provision for Photos
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_790681.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_790681.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid