| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹27.1 L+₹2.2 L (8.62%)Rejected-AOC VILLAGE SHEKHAI P O DHADI GUNSA TEHSIL ROHRU DISTT SHIMLA HIMACHAL PRADESH | ROHRU | SHIMLA | HIMACHAL PRADESH | L2 | Rejected-AOC rejected | |
| 3 | L3₹27.5 L+₹2.5 L (10.1%)Rejected-AOC | L3 | Rejected-AOC rejected | |
| 4 | L4₹28.2 L+₹3.2 L (12.9%)Rejected-AOC | L4 | Rejected-AOC rejected | |
| 5 | L5₹30.0 L+₹5.0 L (19.9%)Rejected-AOC | L5 | Rejected-AOC rejected |
Tender Value
₹45.7 L
EMD Value
₹91,408
Closing Date
4 Mar 2023, 11:00 amClosed
Executive Engineer
Executive Engineer Jal Shakti Division Nerwa
Providing Flood protection wall along the Shalvi River near Dundi Mata Temple and Channelization of water of Dayandli Nallah at Nerwa Tehsil Nerwa Distt Shimla HP CO PCC Wall in both banks of Dyandli Nallah
2023_HPIPH_69713_1
12015-65 dated 25-02-2023
Open Tender
Miscellaneous Works
Item Rate
365 days
GP Nerwa
Please refer Tender documents.
6 documents required · 6 mandatory
₹800
Yes
EE Nerwa
₹91,408
Yes
22 Mar 2023
25 Feb 2023
4 Mar 2023
25 Feb 2023
4 Mar 2023
25 Feb 2023
25 Feb 2023 - 4 Mar 2023
Amount
Excavation in foundation trenches etc. in earth work, lift upto 1.50mtr. Stacking the excavated soil not more than 3mtr. Clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts in all kinds of soil and as per the direction of the Engineer-in-Charge.
Providing and laying cement concrete 1:4:8(1cement:4sand:8graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth and as per the direction of the Engineer-in-Charge.
Prov. And laying cement concrete 1:2:4(1cement:2sand::4graded stone agg. 20mm nominal size)& curing completeexcluding cost of form work & reinforcement for reinforced conc. Work in Suspended floors,roofs,landing,shelves &theirsupports balconies beams, girder bressumers etc and asper the direction of the Engineer-in-Charge.
Providing mild steel/tor steel reinforcement for RCC work including bending binding and placing in position complete upto floor two level tor steel & asper the direction of the Engineer-in-Charge.
Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, centring, shuttering, strutting and propping and centring below supporting floor to ciling not exceeding 4mtrs. And removal of the same for insitu-reinforced concrete & plain concrete work as per direction of the Engineer-in-Charge.
a )Vertical surfaces such as walls(any thickness partitions and the like including attached pillasters buttresses, plinth and string courses and the like.
Boulder filling behind the retaining wall and asper the directionof the Engineer-in-charge.
Providing and laying cement concrete 1:5:10 ( 1cement:5sand:10 graded stone agg. 40mm nominal size) with 15 % plum and curing complete excluding cost of form work in retaining walls/Breast walls, the size of plums shall usually be 150mm to 300 mm as per HPPWDS Specification. asper the direction of Engineer-in-Charge.
Kapil Dev
M/S NITISH CONSTRUCATION
LAIQ RAM CHAUHAN
jagdish thakur govt.contractor
Kamlesh Kumar
Om Prakash Chauhan
Rekha Devi
HPPWD
AMIT KUMAR
Ram Lal Pandey
suresh pandey
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .