| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.0 L+₹58,733 (2.22%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹27.9 L
EMD Value
₹56,000
Closing Date
13 Dec 2021, 11:00 amClosed
E.E. M.G.C.C.D-5, Bijnor
M.G.C.C.D-5, Bijnor
Construction of Fall at km. 6.800 and Construction of canal from km. 6.700 to km. 6.800 of Dingarpur Dy. under Madhya Ganga Canal stage-II.
2021_UPIDC_649625_5
15/EE/2021-22
Open Tender
Civil Works - Others
Item Wise
90 days
Disttt. moradabad
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹56,000
Yes
28 Mar 2022
8 Dec 2021
13 Dec 2021
8 Dec 2021
13 Dec 2021
8 Dec 2021
Amount
Earthwork in excavation in foundation in all type of soil including all lift and avg.lead up to 30m etc complete.
Providing and Laying Centering and shuttering in column and wing walls including all cost of material, labour and T&P etc. complete
Providing and Laying P.C.C. 1:3:6(M-10) with4-40mm size crushed stone ballast including all cost of material, labour and T&P etc. complete
P/Laying C.C. (M-20) with 4-20 mm size crushed stone ballast including all cost of material, labour and T&P etc. complete
Providing and Laying R..C.C. (M-20) with4-20mm size crushed stone ballast including all cost of material, labour and T&P etc. complete.
P /Laying Steel reinforcement of Fe-415 HYSD Grade conforming IS- 1786 with cutting, bending, binding i/c all cost of binding wire,steel,labour and T&P etc. complete.
P/Laying C.C. (M-25) with 4- 20 mm size crushed stone ballast including all cost of material, labour and T&P etc. complete
S/Laying boulder pitching (20-40 Kg weight) including all cost of material, labour and T&P etc. complete
Supplying and Laying R.B.M. including all cost of material,Labour and T&P etc complete.
Supplying &fixing 150mm dia P.V.C.drain pipe & 6 Kg/sqcm (ISI Marked) including all cost of material, labour and T&P etc. complete.
Earth work in embankment in ordinary soil in 20cm layer i/c ramming and dressing the surface to the required levels and slopes also including carriage 1.000Km. Up to work site with all lead and lift ,complete as per directed by Engineer -in -charge.
M/s KS Construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .