| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.9 Cr+₹86.9 L (7.23%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | WANI INFRATECH PRIVATE LIMITED L1 | Ms Ghulam Nabi Magray L2 |
|---|---|---|---|---|---|
| 1.00 | Demolishing stone rubble masonary manually/by mechanical means incl. stacking of serviceable material and disposal of unserviceable material within 50 mtrs. Lead as per direction of Engineer-in-charge. | 161.2 | cum | 1,500 ₹2,41,800 Lowest | 1,500 ₹2,41,800 Lowest |
| 2.00 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead up to 50 meters and lift up to 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 22,305.54 | cum | 200 ₹44,61,108 | 188 ₹41,93,441.52 Lowest |
| 3.00 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 meters and lift up to 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 9,125.39 | cum | 400 ₹36,50,156 Lowest | 600 ₹54,75,234 |
| 4.00Extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked material (All kinds of soil). | |||||
| 4.01 | 1st lift | 7,169.39 | Cum | 90 ₹6,45,245.1 Lowest | 91 ₹6,52,414.49 |
| 4.02 | 2nd lift | 7,033.9 | Cum | 150 ₹10,55,085 Lowest | 180 ₹12,66,102 |
| 4.03 | 3rd lift | 4,478.5 | Cum | 270 ₹12,09,195 Lowest | 270 ₹12,09,195 Lowest |
| 4.04 | 4th lift. | 1,165.5 | cum | 350 ₹4,07,925 Lowest | 350 ₹4,07,925 Lowest |
| 5.00Extra for earth work excavation in or under water/liquid mud including pumping out water as required | |||||
| 5.01 | 1m below water level. | 1,129.3 | Cum | 120 ₹1,35,516 Lowest | 120 ₹1,35,516 Lowest |
Tender Value
₹13.3 Cr
EMD Value
₹26.6 L
Closing Date
13 Sept 2023, 4:00 pmClosed
Executive Engineer
SDA Building near Police Control Room Srinagar
fLOOD PROTECTION WORKS ON RIVEWR JEHLUM UNDER FLOOD MANAGEMENT PROGRAMME PHASE-11(PART-a)
2023_IFC_226669_1
ENIT No 17 of 2023-24
Open Tender
Civil Works
Item Rate
912 days
sRINAGAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,000
Yes
Executive Engineer
₹26.6 L
Yes
Chief Engineering complex rajbagh
27 Sept 2023
18 Aug 2023
14 Sept 2023
18 Aug 2023
13 Sept 2023
18 Aug 2023
28 Aug 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonary manually/by mechanical means incl. stacking of serviceable material and disposal of unserviceable material within 50 mtrs. Lead as per direction of Engineer-in-charge. | 161.2 | cum | 1,696.15 | ₹2,73,419.38 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead up to 50 meters and lift up to 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 22,305.54 | cum | 191.95 | ₹42,81,548.4 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 meters and lift up to 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 9,125.39 | cum | 603.4 | ₹55,06,260.33 |
| 4Extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked material (All kinds of soil). | |||||
| 4.01 | 1st lift | 7,169.39 | Cum | 91.2 | ₹6,53,848.37 |
| 4.02 | 2nd lift | 7,033.9 | Cum | 182.4 | ₹12,82,983.36 |
| 4.03 | 3rd lift | 4,478.5 | Cum | 273.6 | ₹12,25,317.6 |
| 4.04 | 4th lift. | 1,165.5 | cum | 364.8 | ₹4,25,174.4 |
| 5Extra for earth work excavation in or under water/liquid mud including pumping out water as required | |||||
| 5.01 | 1m below water level. | 1,129.3 | Cum | 120.68 | ₹1,36,283.92 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_650039.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .