Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44,850.86Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹44,850.86 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹50,553.32+₹5,702.47 (12.7%)Admitted-Fee/PreQual/Technical/Finance | -21.10% | ₹50,553.32+₹5,702.47 (12.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹64,000
EMD Value
₹1,920
Closing Date
11 Sept 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O CRICKET TURF 22YARDS AT PLAYFIELD YKPORA A WARD NO 4 BLOCK QAZIGUND
2026_RDPR_323496_41
ENIT105of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹1,920
15 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds of soils | 44 | cum | 256.85 | ₹11,301.4 |
| 2 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 82.5 | sqm | 153 | ₹12,622.5 |
| 3 | P/L in position of stone soling hand packed tightly Including all carriages | 17.8 | cum | 900 | ₹16,020 |
| 4 | Excavating, supplying and filling of good earth—clay rich (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 41.7 | cum | 276.6 | ₹11,534.22 |
| 5 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density) | 62.6 | cum | 18.5 | ₹1,158.1 |
| 6 | Carriage of Earth Filling from lead of 5 Kms | 39.6 | cum | 250.92 | ₹9,936.43 |
| 7 | Provision for signboard & photographs, and other unforeseens (subject to actual) | 1 | Job | 1,500 | ₹1,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1089437.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .