| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-AOC | ₹24.2 L | L1 | Accepted-AOC ACCEPT |
| 2 | Rejected-Technical COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | S RAJU L1 |
|---|---|---|---|---|
| 1.00 | Earthwork Excavation And Deposting on Bank With Initial Lead of 10 m And Initial Lift of 2m In Hard Stiff Clay Stiff Black Hard Shales Muram Gravel Stoney Earth And Earth Mixed With Small Size Boulders And Hard Gravelly Soil (SS 20B) | 396 | M3 | 110 ₹43,560 Lowest |
| 2.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 288 | M3 | 523 ₹1,50,624 Lowest |
| 3.00 | Providing and erecting Single sided Single Guard Metal Beam Crash Barrier System (Type - A, “W” Single Guard)1.80m high, comprising of 3mm thick wall “W” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 700 mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 1100mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification of IRC 119 2015 and as directed by the Engineer-in-charge | 115 | M | 4,696 ₹5,40,040 Lowest |
| 4.00 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900 | 159 | M3 | 2,097 ₹3,33,423 Lowest |
| 5.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 10 | M2 | 712 ₹7,120 Lowest |
| 6.00 | Reinforced Cement concrete 1:2 :4 (one cement, two sand & four course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 80 | M3 | 9,186.25 ₹7,34,900 Lowest |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 64 | Qtl | 9,542 ₹6,10,688 Lowest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
12 Feb 2026, 3:00 pmClosed
The commissoner, coimbatore
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Lake side parking Lot at Kumarasamy lake south side in West zone
2026_MAWS_653869_6
e13/2026-two cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
as per tender documents
5 documents required · 5 mandatory
₹0
₹30,000
17 Apr 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
12 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation And Deposting on Bank With Initial Lead of 10 m And Initial Lift of 2m In Hard Stiff Clay Stiff Black Hard Shales Muram Gravel Stoney Earth And Earth Mixed With Small Size Boulders And Hard Gravelly Soil (SS 20B) | 396 | M3 | - | - |
| 2 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 288 | M3 | - | - |
| 3 | Providing and erecting Single sided Single Guard Metal Beam Crash Barrier System (Type - A, “W” Single Guard)1.80m high, comprising of 3mm thick wall “W” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 700 mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 1100mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification of IRC 119 2015 and as directed by the Engineer-in-charge | 115 | M | - | - |
| 4 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900 | 159 | M3 | - | - |
| 5 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 10 | M2 | - | - |
| 6 | Reinforced Cement concrete 1:2 :4 (one cement, two sand & four course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 80 | M3 | - | - |
| 7 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 64 | Qtl | - | - |
stage.html
html • 0.04 MB
techsummary_784120.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_784120.xls
BOQ • 0.24 MB
Twocoverdocument.pdf
Tender Documents • 1.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .