| 1 | L1₹6.9 LAccepted-AOC NO 9 3 ONTHIYAMPUDUR VILLAGE NADUPATTY POST UTHANGARAI TALUK KRISHNAGIRI DISTRICT 635307 | KRISHNAGIRI | TAMIL NADU | 635307 | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.9 L+₹7,416.22 (1.08%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹7.0 L
EMD Value
₹7,000
Closing Date
21 Jul 2023, 3:00 pmClosed
Block Development officer
BDO Office Uthangarai
Krishnagiri District Uthangarai Block Under AGAMT II - 2023 - 2024 Construction of Cremation Shed,Approach road, Compound Wall and Hand Pump Set at Ondhiyam Burial Ground at Nadupatti Panchayat Package No UTG 37
2023_RDTN_340027_1
ROCNO8254_2022_R10_28_06_2023
Open Tender
Civil Works
Item Rate
180 days
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
BDO Office Uthangarai
8 Aug 2023
10 Jul 2023
21 Jul 2023
10 Jul 2023
21 Jul 2023
10 Jul 2023
15 Jul 2023
Amount
1.Construction of Cremation shed,Approach road ,Compound wall and Hand Pump at Ondhiyam Burial ground H/o Nadupatti Estimate Amount : 6.950 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Cement concrete 1:2:4 Using 00mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Dry Brick work in using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. .
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
For Lintel & Roof level Beam
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with CM 1:3, 10mm thick. etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for Chimney cover slab
Construction of Compound wall
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Column upto GL
Column
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. .
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Cement Concrete Pavement
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Cement concrete 1:2:4 Using 00mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for bitumen pad 15mm thick
Provision For dummy duct pipes
Providing new bore well with Hand Pump Set
Geophysical investigation charges including preparation of Geo physical survery report etc, completed.
Drilling of 150mm Dia Borewell in Hardrock area including development charges and labour chargesetc complete.
From 0 upto 150m
From 151m upto 180m
Supply and delivery of ISI marked 150mm OD PVC 6KSC casing pipes
Supply and fixing of 180mm Bore cover
Supply and delivery of India mark II deep well hand pump set with 30m (10nos x 3m) connecting rods with telescopic stand and cylinder assembly etc,. Completed
Raiser pipe B class 32mm GI pipe (3m long) with out coupling
32mm GI Heavy coupling
Conveyance of Hand pump set to the site including loading and unloading charges.
Hand pump erection charges
Construction of platform allround the hand pump including EW for installation of deep well hand pumps with lead off drain in PCC 1:2:4 s per type design.
Construction of soak pit as per type design
Provision for writing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.Basheer Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .