| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 LRejected-Finance | ₹1.5 L | L2 | Rejected-Finance Second Less Amount |
| Sl No | Description | Qty | Unit | KUMAR TV L2 | K.Moorthy L1 |
|---|---|---|---|---|---|
| 1.00Repairs to Toilet P U Ele School in Pillaipakkam in Veliyanallur Panchayat | |||||
| 2.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 2.94 | Cum | 5,543.72 ₹16,299 | 5,540 ₹16,288 |
| 3.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 0.94 | Cum | 6,253.97 ₹5,879 | 6,250 ₹5,875 |
| 4.00 | Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 14 | Sqm | 590.37 ₹8,265 | 590 ₹8,260 |
| 5.00 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) | 12 | Sqm | 1,467.76 ₹17,613 | 1,467 ₹17,604 |
| 6.00 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers. | 22.92 | Sqm | 1,431.5 ₹32,810 | 1,431 ₹32,799 |
| 7.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 9 | Sqm | 284.72 ₹2,562 | 280 ₹2,520 |
| 8.00 | Steel Door 0.70 m X 1.80m | 1 | Each | 1,645 ₹1,645 | 1,645 ₹1,645 |
| 9.00 | Steel Door 1.00 m X 2.00m | 1 | Each | 2,222 ₹2,222 | 2,222 ₹2,222 |
| 10.00 | Supply and Fixing of IWC | 2 | sqm | 5,777.3 ₹11,555 | 5,777.3 ₹11,555 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1,600
Closing Date
19 Feb 2026, 9:00 amClosed
BLOCK DEVELOPMENT OFFICER (BP)
BLOCK DEVELOPMENT OFFICE NEMILI
Repairs to Toilet P U Ele School in Pillaipakkam in Veliyanallur Panchayat
2026_RDTN_660637_1
A2/3536/2025
Open Tender
Civil Works
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹1,600
Yes
15 Mar 2026
18 Feb 2026
19 Feb 2026
18 Feb 2026
19 Feb 2026
18 Feb 2026
Repairs to Toilet P U Ele School in Pillaipakkam in Veliyanallur Panchayat
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Steel Door 0.70 m X 1.80m
Steel Door 1.00 m X 2.00m
Supply and Fixing of IWC
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats Steel door & windows including cost and conveyance of all materials and all labour charges etc.for new steel door and windows etc
Providing for Doors and Windows Repair
Providing for Water Supply Arrangements
Providing for RCC Ring with Cover Slab
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_792639.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid