| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 54 | m3 | 120 ₹6,480 | 109 ₹5,886 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 27 | m3 | 5,315 ₹1,43,505 | 5,310 ₹1,43,370 Lowest |
| 3.00 | Providing form work for centering and shuttering for all Plain and reinforced concrete works including strutting and removing the same after the specified period etc., complete as per standard specification | 15 | m3 | 315 ₹4,725 | 309 ₹4,635 Lowest |
| 4.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 36 | m3 | 7,150 ₹2,57,400 | 7,140 ₹2,57,040 Lowest |
| 5.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 7 | m3 | 490 ₹3,430 | 485 ₹3,395 Lowest |
| 6.00 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 1 | m3 | 70 ₹70.16 | 67.5 ₹67.65 Lowest |
| 7.00 | GST 18% | 1 | No | 74,761 ₹74,761 | 74,590 ₹74,590 Lowest |
Tender Value
₹5 L
EMD Value
₹10,001
Closing Date
13 Mar 2026, 3:00 pmClosed
Commissioner
Infantry Road, Vellore Corporation, Vellore-632001
Providing CC Pavement at Bharathiyar Nagar Tank 6th Street 035046R2127, in Ward no. 46 Zone - III Vellore Corporation.
2026_MAWS_671638_1
4079/2025/E3/GF-25-26/Z3/P7
Open Tender
Civil Works
Works
180 days
Vellore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,001
15 Oct 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 54 | m3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 27 | m3 | - | - |
| 3 | Providing form work for centering and shuttering for all Plain and reinforced concrete works including strutting and removing the same after the specified period etc., complete as per standard specification | 15 | m3 | - | - |
| 4 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 36 | m3 | - | - |
| 5 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 7 | m3 | - | - |
| 6 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 1 | m3 | - | - |
| 7 | GST 18% | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_807129.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_807129.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .