| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.2 L+₹41,916 (3.28%)Rejected-AOC 2 SURI LANE KOLKATA 700 014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | L2 | Rejected-AOC L2 | |
| 3 | L3₹15.1 L+₹2.4 L (18.5%)Rejected-AOC 3 C DR JAGABANDHU LANE KOLKATA 700012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical NOT HAVING CREDENTIAL |
Tender Value
Refer Docs
EMD Value
₹31,381
Closing Date
28 Aug 2020, 2:30 pmClosed
Executive Engineer
O/o The EE_KNED, PWDte, P-5, CIT Road, 2nd Floor, Moulali,Kolkata-700 014.
AMC of E.I of different residential and non-residential portion in the campus of Central Diary,Belgachia for the year 2020-21--- AMC of EI including sub-station and compound light of whole campus for 12 months.
2020_WBPWD_290159_2
WBPWD/EE/KNED/NIT-03 of 2020-21
Open Tender
ELECTRICAL WORKS M/R
Item Rate
365 days
Central Diary, Belgachia
Please refer Tender documents.
4 documents required · 4 mandatory
₹31,381
9 Oct 2020
10 Aug 2020
31 Aug 2020
14 Aug 2020
28 Aug 2020
14 Aug 2020
Amount
Preventive and corrective Maintenance of Electrical Installation ,upto the control panels for Motors with in the entire Plant LT Panels with Sub-stations inculding E.I at different office rooms,stair cases,Quarter ,Compound illumination within the entire premises of Central dairy,Belgachia in 3(Three)Shift. [3nos worker i.e. Licensed one skilled,one semi-skilled,and one un-skilled at Morning Shift(6AM to 2PM),& Evening Shift (2PM to 10PM) and 2 nos worker i.e. Licensed one semi-skilled ,one un-skilled at Night Shift(10 PM to 6 AM] (for 12 months) [Note: Agency provided supervisor must have minimum one year experience of similar nature works and SCC parts of 1,2,3,4,5,6A,6B,7A,7B,9,10,11,12; who will supervise the whole maintenance work] (Rates should be quoted including all taxes & duties)
Scope of Work.
The scope of maintenance of electrical installation includes HV,main LV/MV distribution lines of entire compound like Switch board, Panels (HT,LT panel of substation to distribution panel of entire campus up-to motor control panel), all electrical lighting & power points, fittings, fixtures, etc.
Scope of works does not cover operation of motors of plant, window/split type Air-conditioner machines and other sophisticated electrical & electronic machineries like computers, UPS etc have been installed in the buildings.
Insulation test with the help of meggar for the entire EI of different places are to be carried out at least once in a year or as required and the result thereof are to be furnished to the EIC.
Earth resistance of the Earthling installation including that of lighting conductor are to be checked at least once in a year or as required and the result thereof should be intimated to the EIC.
Terms and conditions:
Maintenance & up keeping of the above electrical installation in safe and proper working condition
The agency should depute manpower to execute the work in the following manner and will follow instruction given by JE / AE concerned as per necessity of site condition. 1st Shift : Skilled 01, Semi-skilled 01 & Un-skilled 01. (Morning) 2nd Shift : Skilled 01, Semi-skilled 01 & Un-skilled 01.(Evening) 3rd Shift : Semi-skilled 01 & Un-skilled 01. (Night)
The contractors should provide maintenance staff like skilled electrician, semi-skilled electrician, helper with Co’s own tools & tackles and other working instruments may be required to carry out the maintenance work smoothly.
The electrician on duty should have the valid Workman permit no. 1 (b), (ii) & (iv) as applicable during the specified works issued by the Directorate of Electricity, Govt.of West Bengal. Also the Supervisor of the Company should have at least One(1) year working experience in similar nature of work and the valid SCC permit 1, 2, 3,4, 5, 6A,6B,7A,7B,9,10,11 & 12. Both the documents i.e. workman permits & SCC of Supervisor should be submitted by the agency of JE / AE under letter head of agency on commencement of work; else the work commencement will not take effect. The agency must depute his supervisor in General Shift i.e.,10A.M. to 6P.M. in everyday at site.
The agency has to attain & carryout on the routine check-up and normal maintenance works keeping proper records ( In a record book / Log Book / Challan ) duly signed by the authorized representatives and countersigned by the concerned Junior Engineer which is to be produce along with bill. The agency & the electrician engaged by the concern would equally responsible for restoration of any breakdown or malfunctioning of electrical systems including substation if occurred.
Replacement works are to be done as per direction of the aforesaid officers with departmental supplied materials. Fused / defective materials to be returned to section office. Fan, fittings, BDB, PBDB, sub-main & main panels etc. are to be kept, clean and in perfect condition in every fifteen days. Cost of fuse wire, screws, nuts, bolts, split pin for fans, duster and PVC tapes will not be paid separately incl. dismantling & re-fixing of fans as & when required and recorded in Log Book. Agency have to check the tightning of fan and other fittings of all building in once in a three months at free of cost.
The maintenance agency will be held responsible for any damages of the equipments due to un-skilled full handling during maintenance work and in that case, materials are to be replaced free of cost or the department will have right to deduct the damage repair cost from the bill of the agency. The contractor would have no scope to argue on this score.
The agency should be available over telephone and the telephone / mobile should be submitted to JE ( presidency college Elec. Sec ) / AE ( Lalbazar Elec. Sub-Division ) under letter head of agency.
The agency should submit 2 ( Two ) nos. of passport size photograph for each person for issuance of Photo Identity Card, Photocopy of Voter Identity Card and engagement letter of worker under letter head of agency.
The maintenance contract may be terminated at one month’s notice by the EE / KNED, PWD.
Payment will be made at the end of each month on submission of bills in triplicate supported by signed challans & log book.
Failure to provide the maintenance staffs will attract pro-rata deduction from the bill. However, substitute should be provided in absence of a regular technician / helper.
The technician of the agency should capable of repairing all sorts of electrical installation like tube fittings, ceiling fan, pedestal fan, cabin fan, geyser, HPSV fittings etc.
The technician of the agency should capable of casing-capping / rigid conduct wiring to overcome the emergent situation.
Any special repairing works are not covered under this agreement. However, decision of EIC will be final and binding on the Agency.
Sub-station should be kept clean and regular check up of transformer’s temperature.
The agency will take care of prepare the requisition of materials required for the maintenance within his jurisdiction well in advance and submit the same to the concerned Junior Engineer so that no delay in repair/replacement cause trouble in the system & hampering of the Said site.
The agency also has to engage additional adequate number of electricians & helpers if required during any breakdown / fault to restore the same on emergency basis. No extra payment will be made for this.
The agency should pay atleast the minimum wages to workers engaged as per prevailing State Govt. Law. It is desirable that age of workers engage by the agency should neither below twenty years nor exceed sixty years. Monthly Minimum Wages may be arrived by prorate calculation considering 365days as terms of Contract. Agency should submit PF & ESI returns of last three months in online (documents to be uploaded in etender) and ofline (hard copy to be submitted) at the participation of tender.
The agency must have a routine checkup of the entire system to prevent any damage/fire hazard due to loose contact in the Electrical Installation.
Insulation test with the help of Meggar for the entire Electrical Installation as well as earth resistance of the earthling installation are to be carried out in the presence of concerned Assistant Engineer /Sub –Assistant Engineer and the result thereof is to be furnished by the Engineer – In - Charge.
Earthing installation would have to checked for healthiness of the earthing system right from electrical panels, TPNDB and MCBDB, Plug sockets, UPS and AC machines.
The agency has to record temperature of electrical contact points with Infra-red thermometer in order to detect thermal stress on the installation and take up corrective maintenance work.
The philosophy of ‘Public Interest’ would be THE MOTTO of this maintenance offered, any deviation may be viewed otherwise.
The agency will have to depute round the clock highly skilled electrician having workman permit up to 11 kV working authorization from Directorate of Electricity.
Space for accommodation of staff of the agency will be provided by the competent authority.
Maintenance materials viz. Incandescent lamps , Main switches , Power DB ,SPN , BDB , Main & Sub-main cables , Fluorescent tubes , Chokes , Igniters , Condensers etc. will be supplied by the Department and the dismantled unserviceable materials are to be deposited to the concerned Junior Engineer , against which fresh materials are supplied by the Department.
The agency must keep on attendance register at site and all his staff must sign regularly. Which should be verified by JE / AE / EE.
2(two) Log books have to be maintained by the agency in such a manner that at least one of these is available round the clock at the site for substation equipment current, Voltage, nature of faults, restoration, power ON, OFF, etc. ( hourly measurement to be recorded ) and that has to be countersigned by the JE and AE. The log book should be kept at sub-station round the clock for inspection purpose for registering complaints and attend only, call must be provided by the Agency.
The agency should be responsible for any damage in the installation due to mishandling/mal – operation done by his staff and shall be liable for the compensation for the same which would be recovered from the bill as per direction of E.I.C. and the accused staff should be replaced immediately any negligence on the part of agency is subject to unilateral penalty decided by the Engineering –In-Charge , be it detected on the spot or thereafter (even after payment of the bill of the agency).
The Agency will have to take care to prepare the requisition of materials for the maintenance within his jurisdiction well in advance so that no delay in repair / replacement cause trouble in the system and suffering of the authority thereon.
The Agency must carry and measure necessary measurement by their own measuring instrument (e.g. Tong tester, Meggar, Multi-meter, Temp. measuring meter etc.) and should be entered in the log book.
Frequent change of man power will not be allowed man power change if necessary, must inform officially before change & submit respective attested Xerox copy Identity Card, Work Permit License, Voter ID Card etc.
Measurement of hot spot point on electrical system by Infrared Thermometer as preventive maintenance and checking of earth resistance periodically including keeping record in log book.
The Agency must have principal routine check up of the system within the jurisdiction to prevent any damage due to loose connection in the installation. Routine inspection to be made by the contractor of the electrical installation work and to be followed for tightening nuts & bolts, washers, fuse etc. of the SPN, DB, HTPN, DB, VTPN, DB, Distribution fuse box, Loop Box etc.
In case of gross irregularity the contact may be terminated with 1 ( one ) month notice and no responsibility will be borne by this department to consider any loss for termination of contract.
The department will not bear any responsibility for any accident and thereby no claim for compensation in any shape from this department will be entertained.
The agency must have prepare proper single line diagram with making on the equipment that can identify each equipment and others necessary items on each and every floor , building , sub-station , compound lighting , pump Room , lift etc. Also to be submitted to the respective JE , AE , Executive Engineer as when desire.
Safety secure belt, shoes and other necessary safety precaution must be taken during the maintenance work should be strictly follows.
Maximum demand and load in Amp Meter during peak hours is to be recorded weekly.(for sub- station only.)
Insulation resistance of each equipment & cables are to be tested once in three months & remediate action to be taken if IR result found unsatisfactory record is to be maintained in Log Book.
Earth resistance of each earthing Installation Is to be measured on a dry day during dry season once in a year & the result are to be recorded in the Log-Book(for Sub-Station only)
Dehydration breather is to be inspected once in three months and if necessary the silica gel may be reactivated for use again.(for Sub-Station only).
Transformer oil is to be checked and tested for electric Strength, Water content and acidity through reputed authority agency /laboratory once a year and the result are to be recorded in the Log-Book.(for Sub-Station only)
Oil level of Transformer is to be checked once in three months and if required to top with fresh oil (for Sub-Station only).when the requirement is below five (5)ltr.
All bushing and other are to be checked and cleaned once in a months.(for Sub-Station only).
All electrical connection & earthing connection are to be checked once in three months and any loose connections are to be tightened.
The agency must have checking and testing the following items and must have recorded in the log book daily, which should be checked and verified by agency supervisor- a. Terminal tightening report for each and every electrical distribution system under maintenance. b. Temp. measurement report for the same. c. Light/Fan fitting fixture report. d. The others necessary all checking and resolving reports under the same electrical distribution system. e. Recording therein the nature of work done, material, material register etc. day by day. The agency must have to enter all the above mentioned details report daily basis with location marking. The agency may be liable for any disparity report entered in the log book which duly verified. This maintains log book must be sent to the Executive Engineer, through proper channel at the time of bill
Bills should be submitted at the end of every three months with the certification of concerned Engineers on satisfactory completion and at the time of Bill submission agency must have to produce Payment receipt of Staff Wages, ESI & PF along with bill in which signature of each staff with revenue stamp is necessary.
MAHESWAR ELECTRICAL INDUSTRIES
S. A. ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .