| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAccepted-AOC 2 K 625007 | MADURAI | TAMIL NADU | 625007 | ₹34.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹34.9 L+₹88,376 (2.60%)Rejected-AOC 5 142 NEHRU STREET AATHIKULAM MADURAI NORTH MADURAI 625 007 | MADURAI | TAMIL NADU | 625007 | ₹34.9 L+₹88,376 (2.60%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M ARULRAJ L1 | PERIYASAMY MURALI L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.514-rate for 10m3 | 411 | m3 | 92.5 ₹38,017.5 Lowest | 94.9 ₹39,003.9 |
| 2.01 | Providing Granular surface base to the required surfaceusing murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers. | 206 | m3 | 2,074 ₹4,27,244 Lowest | 2,127.9 ₹4,38,347.4 |
| 3.01 | Providing and laying ,spreading and compacting 0.396 m3 of 45- 22.40mm & 0.528 m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 83 | m3 | 2,644.8 ₹2,19,518.4 Lowest | 2,713.6 ₹2,25,228.8 |
| 4.01 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21 | 830 | M2 | 87.3 ₹72,459 Lowest | 89.6 ₹74,368 |
| 5.01 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21 | 830 | M2 | 19.7 ₹16,351 Lowest | 20.2 ₹16,766 |
| 6.01 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 175 | M2 | 29.2 ₹5,110 Lowest | 30 ₹5,250 |
| 7.01 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 112 | M3 | 10,877.1 ₹12,18,235.2 Lowest | 11,159.9 ₹12,49,908.8 |
| 8.01 | Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 67 | M3 | 11,439.8 ₹7,66,466.6 Lowest | 11,737.2 ₹7,86,392.4 |
| 9.01 | Providing and laying of hot applied thermoplastic compound 205mm thick including reflect rising glass beads @ 250gms.per sqm.area.thickness of 2.5mm is exclusive of surface applied glass beads as per IRC :35. The finished surface to be level uniform and free from streadks sdand holes etc complete.(as per MORT & H Specification no803) MDU-CORP DATA-P-21 -SL No:5 | 96 | M2 | 889.6 ₹85,401.6 Lowest | 912.7 ₹87,619.2 |
| 10.01 | Supply of FRC Manhole 600mm size dia cover with frame including cost of conveyance loading fixing the same etc., complete | 4 | No | 2,699.8 ₹10,799.2 Lowest | 2,770 ₹11,080 |
Tender Value
₹34.0 L
EMD Value
₹34,001
Closing Date
30 Dec 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Relaying of BT Road Anna nagar North 3rd cross street 115034R4115 , in Ward No 34
2025_MAWS_631613_1
E1 / EST 017953 / 15th CFC AAQ / 2025-26(PACK 08)
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹34,001
21 Jul 2026
15 Dec 2025
30 Dec 2025
15 Dec 2025
30 Dec 2025
15 Dec 2025
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.514-rate for 10m3
Providing Granular surface base to the required surfaceusing murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers.
Providing and laying ,spreading and compacting 0.396 m3 of 45- 22.40mm & 0.528 m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Providing and laying of hot applied thermoplastic compound 205mm thick including reflect rising glass beads @ 250gms.per sqm.area.thickness of 2.5mm is exclusive of surface applied glass beads as per IRC :35. The finished surface to be level uniform and free from streadks sdand holes etc complete.(as per MORT & H Specification no803) MDU-CORP DATA-P-21 -SL No:5
Supply of FRC Manhole 600mm size dia cover with frame including cost of conveyance loading fixing the same etc., complete
Raising the existing circular man hole in heavy type including the removing the existing the man hole cover with frame and dismanting the existing the coment concrete wall and tar road surface around the manholes using 1:2:4 20mm jelly for raising the existing the manhole wall and using CC 1:2:4 with 20mm chips for finishing the top surface of manhole etc., complete.
Add GST 18%
PERIYASAMY MURALI (BID ID -1542834)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_755445.xls
BOQ • 0.23 MB
P08.pdf
Tender Documents • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .