Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹6,400
Closing Date
18 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO(VP) KTR
BDO KTR
Construction of Burial Ground Compound Wall to Thirutheri Sathya Nagar Habitation in Singaperumal Koil Panchayat(105m)(Only Infront) at Kattankolathur Panchayat union
2023_RDTN_341701_1
819/2023/B5 Dt 11.07.2023
Open Tender
Civil Works
Item Rate
90 days
BDO KTR
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,400
Yes
18 Jul 2023
12 Jul 2023
18 Jul 2023
12 Jul 2023
18 Jul 2023
12 Jul 2023
Amount
Earthwork excavation in all classes of soils except hadr rock in hard ORDINARY SOIL with initial lead and lift including all other labour chargesetc. Complete as per SS 20 B.
Filling with good dry river sand including cost and conveyance to site and labour charges for filling, watering, tamping etc. complete
Cement Concrete 1:4:8 using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Brickwork in cement mortar 1:5 mix using stock bricks including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete
Reinforcement Cement Concrete 1:11/2:3 using 20 mm guage machine broken hard broken granite stone jelly for all RCC including cost conveyance and all labour charges etc. complete.
Reinforcement Cement Concrete 1:11/2:3 using 20 mm guage machine broken hard broken granite stone jelly for all RCC including cost conveyance and all labour charges etc. complete.
Providing centering and shuttering for all RCC items of work including cost and conveyance of all materials to site etc. complete
Above GL
Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc. complete.
Plastering in CM 1:5 mix, 12mm thickness including cost and conveyance of all materials to work site from approved quarry sources and labour charges etc. complete.
Painting two coats over the newly plastered surface with approved exteroir emulsion colour including cost , conveyance and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
DHANALAKSHMI
stage.html
html • 0.02 MB
finance_406717.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .