Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.9 L+₹38,923.97 (4.09%)Rejected-AOC | L2 | Rejected-AOC Rekected |
| Sl No | Description | Qty | Unit | R. Valarmathi L1 | P.Sumalatha L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation | 20.69 | M3 | 224 ₹4,634.56 Lowest | 233 ₹4,820.77 |
| 2.00 | Filling the basement with river sand including cost and conveyance of all materials and all labour charges etc complete. | 19.35 | M3 | - | - |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 6.42 | M3 | 4,831.8 ₹31,020.16 Lowest | 5,025 ₹32,260.5 |
| 4.00 | Supplying and fabrication of steel for RCC items including cost and conveyance of all materials and labour charges etc complete | 1,956.43 | M3 | 88.98 ₹1,74,083.14 Lowest | 93 ₹1,81,947.99 |
| 5.00 | R.C.C 1:1.5:3 Mix using 20 mm HBG Metal including cost and conveyance of all materials and all labour charges etc complete | 19.33 | M3 | 8,474.8 ₹1,63,817.88 Lowest | 8,814 ₹1,70,374.62 |
| 6.00 | Supplying and errecting centring and shuttering requiring support for plane surface in foundation and basement in all etc complete complying,. | 203.35 | M3 | 953 ₹1,93,792.55 Lowest | 991 ₹2,01,519.85 |
| 7.00 | Brick work in cement mortar 1:5 mix using IInd class country bricks of size 23 x 11 x 7 CM including the cost and conveyance of all materials and all labour charges and including curring etc., complete complying with standard specifications. | 18.7 | M3 | 5,756.5 ₹1,07,646.55 Lowest | 5,987 ₹1,11,956.9 |
| 8.00 | Towrds Cost and Supply of Steel Door of Size 0.90 X 2.10 m with outer frame including all material all other labour cost complete complying,. | 2 | M3 | 6,000 ₹12,000 Lowest | 6,240 ₹12,480 |
| 9.00 | Towrds Cost and Supply of Steel Window of Size 0.90 X 1.30 m with outer frame including all material all other labour cost complete complying,. | 2 | M3 | 5,600 ₹11,200 Lowest | 5,824 ₹11,648 |
| 10.00 | Towrds Fixing labour Charges for the Steel Doors including all labour cost complete complying,. | 3.78 | M3 | 185 ₹699.3 Lowest | 192 ₹725.76 |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
15 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Aundipatti Town Panchayat
Construction of Drama Stage at ward 12 Kaliyamman Kovil street at Aundipatti Town Panchayat
2025_DTP_612626_1
781-1-2025
Open Tender
Civil Works
Works
90 days
Construction of Drama Stage at ward 12 Kaliyamman
Refer to tender document
3 documents required · 3 mandatory
₹0
₹12,000
Yes
Aundipatti Town Panchayat
9 Jul 2026
9 Oct 2025
16 Oct 2025
9 Oct 2025
15 Oct 2025
9 Oct 2025
9 Oct 2025
90 days
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .