Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -27.26% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 L+₹6,558.25 (5.61%)Admitted-Finance | -23.18% | ₹1.2 L+₹6,558.25 (5.61%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 L+₹17,204.97 (14.7%)Admitted-Finance | -16.55% | ₹1.3 L+₹17,204.97 (14.7%) | L3 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,200
Closing Date
3 Sept 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction and Upgradation of Devsthan Banyal NHO Talentar Singhat warad no. 6 Panchayat jagti Block Nagrota Under CAPEX(DDC) For the Year 2026-27. Block Level
2026_RDPR_322087_14
e-NIT No. 482 REWJ of 2026-27 dated 25-08-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹3,200
16 Sept 2026
25 Aug 2026
4 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means)in trenches for foundations, drains, pipes, cables etc. (not exceeding
1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of
sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus
excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil | 5.64 | cum | 479.3 | ₹2,703.25 |
| 2 | P/Laying of cement conct.1:5:10 Of specified grade excluding the cost of form work, cement using 40mm N/ size of agg. | 0.99 | cum | 4,826.5 | ₹4,778.24 |
| 3 | P/Laying of cement conc. 1:3:6 Of specified grade with 30% bolder excluding the cost of form work, cement using 20mm N/ size of agg. | 1 | cum | 5,733.6 | ₹5,727.87 |
| 4 | Boulder @ 30% | 9 | cum | 937 | ₹8,433 |
| 5 | Centering and shuttering including strutting propping etc and removal of form for foundation footings, bases of columns etc for mass concret. | 44.49 | sqm | 286.35 | ₹12,739.71 |
| 6 | Sand 5.0 KM by M.T | 10.18 | cum | 200.74 | ₹2,043.53 |
| 7 | Agg. 5 KM by M.T | 20.36 | cum | 200.74 | ₹4,087.07 |
| 8 | Stone 1.0 KM by M.T | 8.91 | cum | 139.94 | ₹1,246.87 |
| 9 | Sign Board of Size 3' x 5' including all lead, lift and carriage Painting & Writing complete Job. | 1 | no. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1077671.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .