| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹1.5 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹1.6 Cr+₹6.3 L (4.22%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹1.6 Cr+₹6.3 L (4.22%) | L2 | Rejected-Finance Being other than Lowest |
| 3 | L3₹1.6 Cr+₹6.5 L (4.35%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | ₹1.6 Cr+₹6.5 L (4.35%) | L3 | Rejected-Finance Being other than Lowest |
| 4 | L4₹1.6 Cr+₹8.0 L (5.32%)Rejected-Finance | ₹1.6 Cr+₹8.0 L (5.32%) | L4 | Rejected-Finance Being other than Lowest |
| 5 | L5₹1.6 Cr+₹9.8 L (6.55%)Rejected-Finance | ₹1.6 Cr+₹9.8 L (6.55%) | L5 | Rejected-Finance Being other than Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
23 Aug 2021, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
M and O REP and ROUTINE MAINT OF CENTRAL AC PLANT INSTALLATION COLD STORAGE BV YARD DOOM HALL OUTSOURCING OF M and O OF WATER SUPPLY INSTALL AND CERTAIN OTHER WORKS AT INS KUNJALI RAFIYA MANZIL AND PCDA (N) OUTSOURCING OF M and O OF ELECTRIC SUP
2021_MES_442083_3
8403/CWE(NW)/MUMBAI
Open Tender
Civil Works
Item Rate
330 days
GE (NW) Kunjali
Class B
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Kunjali
₹2.2 L
Yes
12 Oct 2021
10 Aug 2021
25 Aug 2021
10 Aug 2021
23 Aug 2021
17 Aug 2021
10 Aug 2021 - 16 Aug 2021
Amount
Part-I Manning and operation of walk in chiller/ freezer (Cold Storage) running round the clock in three shift including Sunday and Holiday (i.e 0600 To 1400 Hrs , 1400 To 2200 Hrs & 2200 To 0600 Hrs in Three Shift) in B.V Yard at Colaba including taking care from any pilferage, theft or damage, cleaning etc complete for the following all as directed:- (a) Walk in chiller with air cooled split type chiller refrigeration unit each capacity 10,000 BTU per hr (Working 02 Nos and 01 No stand by total Three Nos) or scroll hermatic compressor based non CFC R22 refrigerent inside room temperature 2º C To 8ºC suitable for product load 10MT. (b) Walk in chiller with air cooled split type chiller refrigeration unit each capacity 15,000 BTU per hr.(Working 02Nos. and 01 No Stand by total Three Nos.) or scroll hermaticaiiy compressor based non CFC R22 refrigerent inside room temperature -4ºC to +4ºC suitable for product load 10MT. (c) Walk in chiller with air cooled split type chiller refrigeration unit each capacity 30,000 BTU per hr.(Working 02Nos. and 01 No Stand by Total Three Nos.) or scroll hermatically compressor based non CFC R404a refrigerent inside room temperature -18ºC to -23ºC suitable for product load 10MT.
Comprehensive maintenance of walk in chiller / freezer (Cold Storage) installed in B.V Yard main bldg. round the clock including painting of platform of unit with stair case replacement of lights in cool and cold room, repairs of doors, lock etc complete for the following specification. (a) Air cooled split type refregeration unit of capacity 30000 BTU/Hrs. sealed compressure based on CFC-R 404 a gas maintaining temperature -18ºC To -23ºC, RH 50% of cool room No. 1 of size 6.55 x 5.75 x 3.9M. (b) Refrigerantion unit -03 Nos (c) Compressor- 03 Nos (d) Air cooled split type refregeration unit of capacity 10000BTU/Hrs and maintaining temp 2ºC to 8ºC for cool room of size 11.5 x 5.95 x 3.9M. (e) Refrigeration unit - 03 Nos (f) Compressor - 03 Nos (g) Air cooled split type refregeration unit of capacity 15000BTU/Hrs.and maintaining temp -4ºC to +4ºC for cool room of size 6.55 x 5.75 x 3.9M. (h) Refrigeration unit -03 Nos (j)Compressor - 03 Nos
Manning and operation of of Central Ac plant 2x14TR running round the clock in three shift including Sunday and Holiday (i.e 0900 hrs to 1700 hrs in One Shift) in Doom Hall INS Kunjali at Colaba including taking care from any pilferage, theft or damage, cleaning etc complete for the following all as directed
Comprehensive maintenance of Central AC Plant of capacity 14TR X 2Nos.comprising of following equipment mentioned below complete all as specified and directed by Engineer-in-Charge at Doom Hall . (a) Compressor model ACCEL SMC 4-65 -2 Nos (b) Compressor motor 15HP-02Nos. (c) Condenser water pump set mono block 5HP-02Nos. (d) Air handling unit with blower motor -01No. (e) FRP Cooling tower with CT Fan- 01No. (f) Electrical control panel cubical type floor mounted complete with main switch, MCCBs, MCB's, voltmeter, Ammeter, auto matic star delta starter for compressors, AHU, pumps, CT fans, condenser etc. complete-01 Set. (g) Control devices such as expansion valve, thermostat solenoid valves, HP/ LP/ OP cut outs with panel board installed gauges-01Set (h) Digit type thermometer-01Set (j) Air supply duct with grill diffusers, dampers and pre heater & re heater back of each complete-01Set (k) Condenser MS piping 50/40mm dia with valves, pressure gauge, temperature gauge, complete-01Set.
Pumping down and transfer existing refrigerant gas of compressor complete for overhauling of compressor, reciprocating type type open type Model No SMC- 4-65 Make : ACCEL 14 Ton capacity and dismantling complete, assembly & replacing of minor unserviceable parts including matching of crank shaft, boring polishing etc. replacing of gaskets packing reassembly and recharging of pumped down refrigerant & topping up if required maintain the required standing pressure charging of compressor oil complete testing for smooth functioning etc complete all as specified and directed by Engineer-in-Charge at Doom Hall. Note: Major spare parts, compressor oil and refrigerant for topping up will be measured and paid seperately under relevant items here in after as 'supply only'. Labour charges are deemed to be included in the quoted unit rate for this item.
Supply only the following items for compressor reciprocating model SMC- 4-65 Make : ACCEL at Doom Hall
Piston
Piston rings
Oil rings
Connecting rod bearing half section
Main end bearing with washer
Liner assembly
Gudgeon pin bush
Rocker arm frame
Rocker arm
Loading unloading ring
Suction valve retaining plate
Suction reeds
Discharge reeds
Oil filter inner
Suction strainer
Oil regulating valve
Discharge valve retaining plate
Crank Shaft
Oil pump Assembly
Connecting rod
Rewinding of unserviceable electric motor 3 phase 50 Hz 415volt of following capacity pump set complete comprising as under :- (i) Disconnecting & removing the electric motor from installed position including, loading, unloading and transporting to approved workshop. (ii) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wire of existing gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. complete for class 'F' insulation. (iii) Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continously to check the RPM etc. to the satisfactory performance etc. complete. Note :- Any damage caused during handling/repairing shall be made good without any extra cost to department.
5.0 HP condenser water motor
15HP compressor motor
10 HP AHU blower motor
Over hauling of Monoblock pump set after removing from the base plate, disconnecting from pipe line, dismantling the pump set, replacing unserviceable gland packing, gun metal bush bearing water seal applying grease etc. complete and reassembling the pump set connecting with pipe line reconnection of electric supply, including buts bolts, gaskets etc. complete testing of pumps for smooth functioning 5.0 HP condenser water motor complete all as specified and directed.
Over hauling of compressor motors, AHU (blower motor) after disconnecting electric supply connection, base nut bolts and removing from base plate & transporting to workshop & back complete opening, pully, end cover plate replacing defective bearing greasing complete and refixing old existing location and reconnection of electric supply including necessary level and alignment, buts bolts, gaskets etc complete with following capacity of motors:-
15HP compressor motor
10 HP AHU blower motor
Taking down old unserviceable shaft seal assembly complete and supply and fix new shaft seal assembly suitable for central AC Plant of model SMC4-65/ ACCEL at Doom Hall complete all as specified and as directed by Engineer-in-Charge
Material and labour for HVE-16 expansion valve of AC plant capacity 14TR including taking down unserviceable valve complete all as specified and directed by Engineer-in-Charge at Doom hall. Make : Sporlon or equivalent
Pumping down the plant to preserve the existing in refrigerant gas & leak testing of plant by charging of nitrogen gas in to entire plant & monitoring for 24hrs to find the leakages, rectification of leak by brazing & replacement of necessary gasket packing wherever required including copper tubes of suitable size vacumising of the plant by vacum pump & keeping 24hrs for pressure testing including rectification of leakages if any finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure complete testing of the plant for smooth functioning complete all as specified & as directed by Engineer-in-Charge.
Dismantling of AHU carefully with top panel and side panel unserviceable pedastal bearings, shafts, motor and blower assembling, materialising and machineing the shaft, replacement of existing size of bearings reassembling the new pedastal bearing shaft blower assembly and electric motor and top / side panel in original position with new nut for smooth running all as specified and directed by Engineer-in-Charge at Doom Hall.
Material and labour for disconnecting condenser for descaling, plugging them & providing of 15mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) PH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than flush with fresh water mixed with sodium carbonate tubes and cleaning with nylonbrush after closing the end covers, circulating diluted acid solution as specified above, to maintaine PH value as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure of capacity 2x14 TR plant complete all as specified & directed by Engineer-in-Charge.
Removing the unserviceable liquid line valve of size 5/8mm dia from the liquid line after pumping down the compressor & supply and fixing new liquid line valve 15mm dia including connected works as required for smooth functioning of AC plants complete all as specified and directed by Engineer-in-Charge
Supply and charge refrigerant R-22 Gas ISI marked.
Replacement of Compressor Oil with new Compressor oil of Frizol 68 all as specified and directed by Engineer-in-Charge.
Removing old unserviceable discharge valve 5/8mm dia and supply and fix new discharge valve of size 5/8mm dia suitable for R-22 gas discharge line all as specified & directed. Make : Castle
Supply and fix in replacement of unserviceable / wornout 'V' belt of compressor of size B-90, AHU belt size of A-82 etc complete all as specified and directed.Make : fenner Dunlop, Nurlon or equivalent as approved
Taking down old unserviceable AHU pre filter and supply and fix new pre filters efficiency 90% down to particular size of 10 micron double knitted twisted polymer fabric (washable) rated with press drop of 6 mm WC, including aluminium anodized frame work of 16 SWG to be mounted in AHU filter assembly size (625 x 475 x 50) mm at boat pool complete all as specified and as directed by Engineer-in-Charge. Make:DYNA/ASPAWYMAN/MHP as approved
Replacement of unserviceable 2KW Heater strip for AC plant complete all as specified and as directed by Engineer-in-Charge
Taking down old existing MS pipes, supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of sizes 100 mm dia complete all as specified and as directed by Engineer-in-Charge.
Taking down old existing MS pipes, supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of sizes 80 mm dia complete all as specified and as directed by Engineer-in-Charge.
Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes 100 mm dia complete all as specified and as directed by Engineer-in-Charge.
Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes of 80 mm dia complete all as specified and as directed by Engineer-in-Charge.
Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes of 50 mm dia complete all as specified and directed.
Supply and fix in replacement power contactors MNX type, three phase, 415V all complete all as specified and as directed by Engineer-in-Charge :- Make: L&T Cat No. MNX 40 or equivalent of Siemens/GE/Legrand
Supply and fix in replacement power contactors MNX type, three phase, 415V all complete all as specified and as directed by Engineer-in-Charge. Make: L&T Cat No. MNX 32 or equivalent of Siemens/GE/Legrand
Supply and fix in replacement power contactors, three phase, 415V all as specified and directed by Engineer-in-Charge :-Make: L&T Cat No. MNX 25or equivalent of Siemens/GE/Legrand
Supply and fix in replacement Auxliary contactors 1NO+1NC three phase, 415V all as specified and directed by Engineer-in-Charge :- Make: L&T / Siemens/GE/Legrand
Removing the unserviceable solenoid valve 5/8" flare from the liquid line and supply and fix new solenoid valve 5/8" suitable for AC plant of various capacities complete all as specified and as directed by Engineer-in-Charge
Removing the unserviceable pressure gauges HP/LP/OP from existing position and supply and fixing new pressure gauge of capacity 0 to 30Kg. / square centimeter complete with necessary accessories complete all as specified and as directed by Engineer-in-Charge
Removing the unserviceable water pressure gauges from water line & supplying and fixing new water meter up to pressure 7Kg. / square centimeter complete with necessary accessories complete all as specified and as directed by Engineer-in-Charge
Material and labour for scraping cleaning & preparation of external surface & painting complete installation of 14 x 2 TR (28TR capacity) including compressor, motor, piping, cooling tower, condensor, AHU & panel board etc with two coats of synthetic enamel paint over a coat of primer as per direction on colour code as given including writing SM & MES numbers complete all as per specified & as directed by Engineer-in-Charge at Doom Hall AC Plant
Material & Labour for HP/LP cut out of AC Plant MP-15 Including taking down old one complete all as specified and directed. Make:- Indofoss or equivalent as approved by GE.
Material and labour for MP-55 oil pressure cut out controls for compressor including taking down old one complete all as specified and as directed by Engineer-in-Charge.. Make: MP 55 Indofoss or equivalent.
Removing of old unserviceable heating coil as per suitable dia and liquid length with super lone insulation over the pipe for drainage of cold room all as directed by Engineer-in-Charge.
Material and labour for digital thermometer for temperature suitable for cold room after removing old unserviceable thermometer complete all as specified and as directed by Engineer-in-Charge
Material and labour for LP/HP Cut out of cold room after removing to unserviceable LP/HP cut out complete all as specified and as directed by Engineer-in-Charge Make : Donfoss or equivalent as approved by GE.
Replacement of running capacitor 36 MFD/45 MFD after removing old unserviceable running capacitor complete all as specified and as directed by Engineer-in-Charge make : Usha/ Siemens/ Epcos
Replacement of old unserviceable thermostat with new thermostat suitable(-)18 deg C to (-) 23deg C cold storage plant complete all as specified and as directed by Engineer-in-Charge
Removing old unserviceable pilot solenoid valve assembly and providing new pilot solenoid valve assembly for cold roomcomplete all as specified and as directed by Engineer-in-Charge
Material and labour for replacement of old unserviceable temprature indicator complete all as specified and as directed by Engineer-in-Charge
Replacement of old unserviceable liquid line filter with new liquid line filter complete all as specified and as directed by Engineer-in-Charge. Make: Danfoss or equivalent as approved by GE.
Material and labour for replacement of old unserviceable Filter drier complete all as specified and as directed by Engineer-in-Charge
Material and labour for expansion valve suitable for -18degC to -23degC after removing unserviceable expansion valve in cold room complete all as specified and as directed by Engineer-in-Charge. Make :- Danfoss or equivalent as approved by GE.
Supply and fix single phase preventor complete all as specified and as directed by Engineer-in-Charge. Make: Minilec or equivalent as approved by GE.
Replacement of starting capacitor 120MFD after removing old unserviceable capacitor complete all as specified and as directed by Engineer-in-Charge.
Removing old unserviceable timer/ supply and fix new timer of same make and capacity all as directed by Engineer-in- Charge.
Removing old unserviceable over load relay assembly and supply fixing new overload relay assembly of 9-15 Amps same make and capacity complete all as specified and as directed by Engineer-in-Charge. Make: L & T or equivalent as approved by GE.
Supply and fix in repairs CI Butter fly valve slim seal design with nitrile rubber lined seal with clutch lever (P10 or PN 16) as per IS 13095 of size 80mm bore complete all as specified and as directed by Engineer-in-Charge . Make: AUDCO/SANT/SIR as approved by GE.
All as per item No 51 above but 65 mm bore.
All as per item No 51 above but 50 mm bore.
Supply and fix in repairs Gate Valve of 40 mm Borecomplete complete all as specified and as directed by Engineer-in-Charge.
Supply and fix in repairs Pot Strainer of 80 mm Bore suitable for Cooling tower pipi line complete all as specified and as directed by Engineer-in-Charge. Make: Kirloskar/Hammer/L&T as approved by GE.
Supply and fix flexible cord type Drain line Silicon Heater with insulation 60watt for cold room complete all as specified and as directed by Engineer-in-Charge.
Pumping down plant to pressure the existing refrigerant gas and leak testing of plant by charging of Nitrogen gas in to entire plant and monitoring for 24hrs to find the leakages rectification of leak by brazing & replacement of gasket packing including vacumizing of the plant by vaccum pump and keep up 24hrs. for testing including rectification of leakage if any finally recharging of gas to the plant to maintain the standard pressure complete test complete all as specified and directed.
Cold room refrigerant unit 5TR Capacity
Cold room refrigerant unit 3TR Capacity
Cool room refrigerant unit 2TR Capacity
Removing old unserviceable compressor from the unit after disconnecting electrical wiring and piping connection with nuts and bolts complete supply, install and testing new sealed compressor of following capacity and connecting pipe line including piping, brazing and electirc connection for cold storage at B.V yard complete all as specified and directed.
Refrigerant unit of Compressor 5TR Capacity
Refrigerant unit of Compressor 3TR Capacity
Refrigerant unit of Compressor 2TR Capacity
Removing the worn out control wiring complete, rewiring with suitable copper conductor cable replacing the lugs starter to compressor motor, fan motor timer HP/LP cut , thermostat complete interlock wiring, checking the complete function of timer, heaters, relays, HP/LP cut outs, thermostat cut out and inter lock wiring system, testing on load and all wiring shall be mounted on cable tray of size 200mmx50mm. all as specified and directed for cold storage of following capacity:-
Refrigerant unit of 5TR Capacity
Refrigerant unit of 3TR Capacity
Refrigerant unit of 2TR Capacity
Supply and Gas charging with R-404a gas with connecting accessories
Removing old unserviceable condensor coil fan motor with blade assembly and providing new condensor coil fan motor with blade complete suitable for cold room outdoor unit of capacity 2tr/3tr/5tr complete all as specified and directed.
Removing old unserviceable cooling coil fan motor with blade assembly and providing new cooling coil fan motor with blade complete suitable for cold room indoor unit of capacity 2tr/3tr/5tr complete all as specified and directed.
Taking out old unserviceable condensor and supply & fix new condensor made out of copper pipe and aluminium fins suitable for cold/ cool room including gas charging, leakage checking and testing complete all as specified and directed.
Supply and errect factory fabricated rectangular square duct made out of 24 gauge GI sheet in L shaped hollow profile including all accessories such as corner, carriage bolt hangers, gasket and seal the longitudinal joints with and including approved sealant complete all as specified and directed by Engineer-in-Charge.
Material and labour for replacement of unserviceable Cooling Tower accessories i.e. Nozzeles, water inlet/outlet pipe and filter, Fan blade, fan blade housing assembly, GI bolts, nuts, MS frame and ladder etc complete and refitting old PVC fills (serviceable qty shall be reused to the extent available) after cleaning with diluted HCL solution suitable for the existing cooling tower, servicing of fan and motor assembly including removal of dust, oil, scaling of motor body and replacing the unseviceable bearing, painting with anticorrosive paint & reassembling complete For 35 TR cooling tower Location Doom Hall all as specified and directed.
Taking down old unserviceable insulation from any surface and supply and fix nitrile rubber insulation of one layer of 19mm thickness sticking on surface by using approved adhesive and sealing the joints by weather proof tape all as directed by Engineer-in-Charge.
Part-II Manning and operation of water supply installation consisting of electrically operated pump sets of any type & capacity -02 Nos at INS Kunjali pump house (for fresh water) including taking care of any pilfrage/damage and cleaning of pumps/pump house including minor surrounding daily in two shifts from 0600 hrs to 1400 hrs and 1400 hrs to 2200 hrs including sunday and holiday all as specified and directed by Engineer-in-Charge.
Manning and operation of water supply installation consisting of electrically operated pump sets of any type & capacity -02 Nos at Rafiya Manzil Pump house (for fresh water) including taking care of any pilfrage/damage and cleaning of pumps/pump house/ pump house surrounding daily in two shifts from 0600 hrs to 1400 hrs and 1400 hrs to 2200 hrs including Sunday and Holiday all as specified and directed by Engineer-in-Charge.
Manning and operation of water supply installation consisting of electrically operated pump sets of any type and capacity -06 No at PCDA (Navy) Pump house (for fresh water) including taking care of from any pilfrage/damage and cleaning of pumps/pump house/ pump house surrounding daily in one shift from 0900 hrs to 1700 hrs including sunday and holiday all as specified and directed by Engineer-in-Charge.
Excavation in trenches n.exc.1.5m wide and n.exc 1.5m depth for laying of pipe lines etc and getting in hard/dense soil compelete all as specified and directed.
Removing excavated materials(soil) to a distance not exc 50m and depositing where directed at a level not.exc 1.5m above the starting point complete all as specified and as directed by Engineer-in-Charge.
Returning ,filling in incl spreading levelling, watering and well ramming in layers not exc 25cm in deth complete all as specified and as directed by Engineer-in-Charge.
Material and labour for providing cement concrete 1:4:8 type D2 using 40mm graded stone aggregate as in foundations, filling mass concrete complete all as specified and as directed by Engineer-in-Charge
Material and labour for providing cement concrete 1:2:4 type B2 using 20mm graded stone aggregate for bed plates including weathering, slightly complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs PVC low pressure float valve asscessories complete with epoxy coated aluminium rod and H.D ball of following size.complete all as specified and as directed by Engineer-in-Charge
20mm dia size
25 mm dia size
40mm dia size
50mm dia size
Dismantling and taking out perished/ unserviceable GI water tubing laid in trenches/ floors and Supply and fixing GI tubing , medium grade, with all fittings, complete fixed to walls and ceiling or laid in trenches / floors for the following sizes complete all as specified and as directed by Engineer-in-Charge . Note :-Quoted rate inclusive of cost of necessary GI fittings.
15mm dia
20mm dia
25mm dia
40mm dia
50mm dia
80mm dia
100mm dia
Supply and fixing in repair gun metal gate valve, with iron wheel head,screwed both ends, class II, and fixed complete including cutting of the pipe line and taking down perished valves wherever required for the following sizes:-
15 mm dia
20 mm dia
25 mm dia
40 mm dia
50 mm dia
80 mm dia
Supply and replace CI Sluice valve 80mm dia PN 1.6 congforming to IS -14846 flanged end complete with iron wheel head and Brass spindle including flange joints, repalcement of perished nuts ,bolts, washers and rubber washer.etc.complete all as specified and as directed by Engineer-in-Charge.
All a per item No 78 above but size 100 mm dia
All a per item No 78 above but size 150 mm dia
Supply and replace NRV of 80mm dia IS -14846 flanged end complete with iron wheel head and Brass spindle including flange joints, repalcement of perished nuts ,bolts, washers and rubber washer.etc.complete all as specified and as directed by Engineer-in-Charge.
All a per serl item No 81 above but size 100 mm dia
All a per serl item No 81 above but size 150 mm dia
Supply and fixing in repair CI foot valve suitable for the following CI/ GI pipe including replacement of necessary rubber gaskets, bolts, nuts and washers complete all as specified and as directed by Engineer-in-Charge.
80mm dia pipe
100mm dia pipe
150mm dia pipe
Part-III Manning and operation electrical receiving substation 11KV/ 440 Volts at INS ANGRE power house by employing below mentioned man power in two shifts per day including Sunday / Holidays: (i) Skilled Electrician-01No. Per shift. Note: Shift Timing is as under:- (a) First shift: 0600hrs. To 1400hrs. (b) Second shift : 14.00hrs. To 2200 hrs.
Manning and operation of electrical receiving substation 11KV/ 440 Volts at FMU power house by employing below mentioned man power in two shifts per day including Sunday / Holidays:- (i) Skilled Electrician-01No. Per shift. Note: Shift Timings are as under:- (a) First shift: 0600hrs. To 1400hrs. (b) Second shift : 14.00hrs. To 2200 hrs.
Manning and operation electrical receiving substation 11KV/ 440 Volts at NMRL power house by employing below mentioned man power in one shift per day including Sunday / Holidays:- (i) Skilled Electrician-01No. Per shift. Note: Shift Timing is as under:- First shift: 0900hrs. To 1700hrs.
Manning and operation of water supply installation consisting of electrically operated monoblock pump sets of capacity 20HP-02 Nos 75HP-02 No (fire fighting) at INS Vajrabhau, 5 HP-02 Nos at FMU bldg and 5 HP-02 Nos at Fleet office bldg ( for fresh water) including taking care of from any pilfrage/damage daily in three shiftsper day including sunday/holiday at A-14 INS Vajrabhau bldg, FMU bldg and fleet office bldg complete all as specified and directed. (a) Skilled Electrician-01No. Per shift. Note: Shift Timing is as under:- (i) First shift: 0600hrs. To 1400hrs. (i) Second shift: 1400hrs. To 2200hrs. (i) Third shift: 2200hrs. To 0600hrs.
Manning and Operation of water supply installation consisting of electrically operated monoblock pump sets of capacity as mentioned below including taking care of from any pilfrage/damage daily in three shifts per day including Sunday/Holiday at INS Angre pump house complete all as specified and directed. (a) 10HP - 03 Nos (for fresh water) (b) 30HP - 02 Nos (for fresh water) (c) 75HP -02 Nos (for fire fighting) (a) Skilled Electrician-01No. Per shift. Note: Shift Timing is as under:- (i) First shift: 0600hrs. To 1400hrs. (i) Second shift: 1400hrs. To 2200hrs. (i) Third shift: 2200hrs. To 0600hrs.
Manning and Operation of water supply installation consisting of electrically operated monoblock pump sets of capacity as mentioned below including taking care of from any pilfrage/damage daily in two shifts per day including Sunday/Holiday at INS Trata and worli pump house complete all as specified and directed. (a) 7.5 HP - 02 Nos (fresh water) (b) 5 HP - 02 Nos (for fresh Water) (a) Skilled Electrician-01No. Per shift. Note: Shift Timing is as under:- (i) First shift: 0600hrs. To 1400hrs. (i) Second shift: 1400hrs. To 2200hrs.
Manning and Operation of water supply installation consisting of electrically operated monoblock pump sets of capacity as mentioned below including taking care of from any pilfrage/damage daily in one shifts per day including Sunday/Holiday at HQ MAGNA and Godfrey clinic pump house complete all as specified and directed. (a) 7.5 HP - 02 Nos (fresh water) (b) 5 HP - 02 Nos (for fresh Water) (a) Skilled Electrician-01No. Per shift. Note: Shift Timing is as under:- (i) First shift: 1800hrs. To 0200hrs.
Manning and Operation of water supply installation consisting of electrically operated monoblock pump sets including taking care of from any pilfrage/damage daily in one shifts per day including Sunday/Holiday at New Flotila Niwas & NMRL pump house complete all as specified and directed. (a) 7.5 HP - 02 Nos (fresh water) (b) 5 HP - 02 Nos (for fresh Water) (a) Skilled Electrician-01No. Per shift. Note: Shift Timing is as under:- (i) First shift: 0900hrs. To 1700hrs.
Manning and operation of electrical distribution system 440 volts/230Volts at INS Agnibabu MES complaint Cell/ Sub station by employing the below mentioned man power in one shift per day including Sunday/ Holidays for manning and atteneding urgent nature complete all as specified and directed. (i) Skilled electrician - 01 No per shift Note :- Shift timing : First shift 0900 hrs to 1700 hrs
Notes for Item Nos (a) Rates quoted by the contractor shall be deemed to be included cleaning of installatin and surrounding area of pump house, operation of chlorine dosing system, taking care from any pilferage/damage of installation and maintaining documents/ registers, chlorine testing register duty roster and attendance register complete all as specified and directed. (b) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulation including all relevant taxes as applicable. (c) Contractor shall quoted the rates considering their monthly leaves, reliver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of the that day will not be paid, In addition to that a penlaty of Rs 1500/- per day per persons will be recovered from contractor dues. also in case of long absence continously (more than one week) of staff/tradesman, the payment of that day will not be paid. The contractor shall have to claim on this account. (d) Contractor has to supply three sets of tools and plants to the labour employed by him and should be placed with the safe custody of dapartment, rates quoted shall be deemed to be included the above provision.
Note :- For item No 1,3,67,68,69,85 to 93 (a) Surprise check will be carried out by department representative and if any employes is not available at his working place, he will be treated as absent. (b) Contractor has to submit the list of employees including reserve alongwith police verification, Aadhar card, Aadhar card linked Bank Account No and relevant documents as mentioned in PS to the Engineer-in-Charge alongwith performance security before issue work order. (c) The payment shall be made to employees on or before 10th of every calender month. Payment to employees shall be done by crossed cheque / RTGS / NEFT / IMPS through Aadhar card linked Bank Account only and it shall not be less than minumum fair wages as per Act in vogue (d) Contractor has to submit proof of payment of EPF subscription made by his alongwith RAR failing which RAR will not be progressed for payment (e) Contractor has to employ the number of labours per day as intimated by the Engineer-in-Charge for which he has to make alternative arrangement. (f) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (g) Contractor shall quote the rates considering their monthly leaves, releiver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of that day will not be paid. In addition to that a penalty of Rs 1500/- per day per person will be recovered from contractors dues. Also in case of long absence (more than one week) of staff/tradesman, the penalty shall be recovered including Sundays & Holidays if any. The contractor shall have no claim on this account.
(h) Contractor has to supply three sets of Tools and Plants (as applicable) to the labours employed by him and should be placed with the safe custody of department. Rates quoted shall be deemed to be included the above provision. (j) In case any variation in manpower as indicated in Column No 4 of BOQ due to any reasons / or any manpower held in Department or any policy change contractor should have no claim on that account. (xiii) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority. If the quoted amount is less than the estimated cost Item No 1,3,67,68,69,85 to 93 i.e Rs 93,42,212.00 , the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (Cover No 2) . (xiv). The deposited amount shall be the difference between estimated cost i.e Rs 93,42,212.00 and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to withhold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall sumbit 03 Nos of BGBs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be 04 months, 08 month & 12 months respectively for the purpose of encashment/ release as the case may be. (xv) The rates quoted shall be inclusive of suitable reliver wherever sundays & holidays are mentioned for working (m) Quotes rates should include Stationary,Uniform,Shoes,log book.etc
Material and labour for Detecting the gas leakage, rectifying the defects by vacumizing and charging fresh mafron gas and commissioning and testing the window type air conditioner unit 1.5Ton capacity complete all as specified and directed.
All as per item No. 94 above but of 2.0 Ton capacity
All as per item No. 94 above but of Split type AC 1.5 Ton Capacity.
All as per item No. 94 above but of Split type AC 2.0 Ton Capacity.
All as per item No. 94 above but of Water cooler 40/60/80 Ltrs. Capacity.
All as per item No. 94 above but of Water cooler 120/150/170 Ltrs. Capacity.
All as per item No. 94 above but of Refrigerator 100/165/180/230 Ltrs. Capacity.
All as per item No. 94 above but of Refrigerator 260/280/310/350 Ltrs. Capacity.
Material and labour for Taking out window type Air conditioner 1.0/1.5/2.0Ton capacity of any make from its original location, removing the dust from body with blower, cleaning the condenser and cooling coil by using water and caustic soda, painting the base tray with one coat of black enamel paint checking all the connections including functioning of metal clad socket/ DP switch function of relay capacitors overload protector thermostat fan motor blade fan blower drum etc. oiling/ greasing of fan motor checking serviceability and refixing it in its original place including testing commissioning for 1.0/1.5/2.0 Ton of AC of any make complete all as specified and directed.
All as per item No. 102 above but of split type AC 1.5/2.0 Ton capacity complete out door and indoor. Note for item nos. 102 & 103 :- Refrigerant gas will be measured & paid separately as supply only under respective items.
Material and labour for cutting out existing wall / widow grills / existing window frame for making suitable space to accommodate window type AC making frame with 2nd class hard wood piece of min of 50 x 50 mm size & up to 60 cm height for fixing of outer cover of AC & supporting structure made out 40 mm x 40 mm x 5 mm thick MS angle iron duly grouted in wall & closing the open space around ACs with the help of 6 mm thick ply wood exterior grade to close air leakage tightening with woolen felt (green felt) and painting to wooden structure matching to interiors as directed & steel structure with one coat of primer and two coats of synthetic black enameled paint and fixing only window type AC all as directed by EIC including complete connecting and testing complete all as specified and directed.
All as per item No. 104 above but shifting of AC from existing location to new location including making good of old location complete all as specified and directed.
Material and labour for taking down Corroded body base tray etc of window type air conditioners and replacement of body base tray etc out of 18 SWG and other portion with MS sheet 20 SWG including motor mounting frame nuts and bolts suitable size painting and necessary insulation complete for 1.0 / 1.5 / 2.0 Ton capacity Air conditioner. Note : For dismantling compressor for body work and reassembling shall be inclusive in quoted rate.
Material and labour for preparation of old painted surfaces of Refrigerator any capacity by complete scraping old painting an applying two coat of synthetic enamel painting on outer surface (spray painting) as per existing colour and black colour on bottom portion such as compressor etc. over a coat of red oxide primer complete all as specified and directed.
Material and labour for preparation of old painted surfaces of Water cooler any capacity by complete scraping old painting an applying two coat of synthetic enamel painting on outer surface (spray painting) as per existing colour and black colour on bottom portion such as compressor etc. over a coat of red oxide primer complete all as specified and directed.
Supply, install, test & commissioning new compressor sealed reciprocating type suitable for window type AC 1.5 Ton capacity duly charged with fresh Refrigerant gas etc. complete all as specified & directed including taking out old . Make : Voltas/usha Shriram/Bluestar /samsung /Hitachi/ videocon/ LG/ Carrier/Daikin etc. as per existing make at site.
All as per item No. 109 above but of 2.0 Ton capacity
All as per item No. 109 above but of Split type AC 1.5 ton capacity
All as per item No. 109 above but of Split type AC 2.0 ton capacity
All as per item No. 109 above but of Refrigerator 100/165/180/210 Liters Capacity.
All as per item No. 109 above but of Refrigerator 260/280/310/350 Liters Capacity.
All as per item No. 109 above but of Water coolers 40 / 60 /80 Liters capacity
All as per item No. 109 above but of Water coolers 120/150/170 Liters capacity
All as per item No. 109 above but of deep freezers of capacity 310ltrs/410Ltrs. Capacity
Taking down carefully split type AC of capacity 1.5 / 2.0 ton & refixing on new location complete with pre fabricated brackets/ frame work as required complete & making the good existing surface with out any damage out & indoor unit complete all as specified and directed.
Removing the existing unserviceable coil burnt fan motor from window/Split type AC of capacity 1.0 / 1.5 / 2.0 Ton and replacing the same with brand new fan motor of same capacity including connecting up and testing complete all as specified and directed.
Supply and fixing fan motor suitable for water cooler of any capacity including removing old fan motor and testing complete all as specified and directed.
Supply,fixing and testing fan blade suitable for window/split type Air conditioner of 1.0 / 1.5 / 2.0 Ton capacity including removing old fan blade complete all as specified and directed..
Supply, fixing and testing fan blade suitable for water cooler of any capacity including removing old fan blade complete all as specified and directed..
Replacing old defective blower drum and supply & fix blower drum suitable for window type Air conditioner of 1.0 Ton / 1.5 Ton / 2.0 Ton capacity complete all as specified and directed..
Replacement of front cover grill suitable for window type AC 1.0 Ton / 1.5 Ton / 2.0 Ton capacity AC of various makes.
Replacement of starting capacitor 60 - 80 mfd
Replacement of starting capacitor 80-100 mfd.
Replacement of starting capacitor 100 -120 mfd.
Replacement of running capacitor 25 MFD (Make : Asian / Epcos)
Replacement of running capacitor 36 MFD (Make : Asian / Epcos)
Replacement of running capacitor 45 MFD (Make : Asian / Epcos)
All as per item No. 131 above but rotary type
Supply & Fixing of thermostat switch for window type AC of capacity 1.0 Ton / 1.5 Ton / 2.0 Ton capacity complete all as specified and directed.Make :- Indofoss / Ranutral or equivalent as approved by GE.
Supply & Fixing of thermostat switch for split type AC of capacity 1.5 Ton / 2.0 Ton capacity complete all as specified and directed. Make :- Indofoss / Ranutral or equivalent as approved by GE.
Supply & Fixing of thermostat switch for Refrigerator of any capacity complete all as specified and directed. Make :- Indofoss / Ranutral or equivalent as approved by GE.
Replacement of thermostat switch for Water Cooler of any capacity complete all as specified and directed. Make :- Indofoss / Ranutral or equivalent as approved by GE.
Taking out old unserviceable and Supply & Fix new over load relay suitable for Window/Split type AC of 1.0 Ton / 1.5 Ton / 2 Ton capacity complete all as specified and directed. .(Make : Arvind / Usha / Microteck)
Taking out old unserviceable and Supply & Fix new over load relay suitable for water cooler of any capacity complete all as specified and directed. (Make : Arvind / Usha /Microteck)
Taking out old unserviceable and Supply & Fix new over load relay suitable for Refrigerator of any capacity complete all as specified and directed. (Make : Arvind / Usha /Microteck)
Supply fixing of Float valve suitable for Water cooler of any capacity complete all as specified and directed.
Supply fixing and clamping jointing copper tubing for suction line and for liquid discharge line duly insulated with suitable insulation material including making hole in wall for passing through and making good to the disturbed surface complete all as specified and directed.
Supply and lay cable PVC insulated 3 core 4 Sq mm with copper conductor cable suitable for indoor unit to outdoor unit complete all as specified and directed.
Supply and lay PVC pipe 20 mm dia heavy duty for drain out condensing water of split AC including cutting of floor / opening of hole in wall and making good after laying of pipe etc match the existing surface complete all as specified and directed.
Supply fixing push cock / lifting cock of 15 mm bore in repair for water cooler of any capacity complete all as specified and directed.
Supply fixing PVC connecting pipe with brass nuts and washers at both ends of length not exc 60 cms for connection of water coolers complete all as specified and directed.
Supply fixing GI water tray 3 mm thick for window type AC any capacity with out let system connection provided with PVC pipe of 20 mm dia up to 3 meter length connecting to drain pipe complete all as specified and directed..
Supply fixing PVC drain pipe with necessary saddles of 25 mm size to be used as out let drain to be fixed complete all as specified and directed.
Supply fixing sheet metal enclosure with 2 pin and earth plug and socket complete with single pole MCB of 20 Amps complete all as specified and directed.
Taking out old unserviceable and Supply & Fix new magnetic gasket for refrigerator of 165 / 286 / 310 liters complete all as specified and directed.
Taking out old unserviceable condenser coil of 1.5 Ton window type AC any make with sins cutting in let outlet connecting copper pipe and providing new condensor coil with sins and connecting in let out let copper pipe by bracing and replacement of nut bolts complete all as specified and directed.
All as per item No. 150 above but for 2.0 ton window type AC complete all as specified and directed.
All as per item No. 150 above but for 1.5 ton Split type AC complete all as specified and directed.
All as per item No.150 above but for 2.0 ton Split type AC complete all as specified and directed.
Removing electronic unserviceable circuit boards from window type AC 1.5 ton / 2.0 Ton capacity and replacing with new circuit boards and connecting with system with replacing remote control hand set and testing complete all as specified and directed
All as per item above but for 1.5 Ton / 2.0 Ton Split type AC complete all as specified and directed
Supply & Fix blower fan motor capacitor 4 MFD complete all as specified and directed. (Make : Asian / Keil)
Supply & Fix blower fan motor capacitor 6 MFD complete all as specified and directed. (Make : Asian / Keil)
Supply & fix of electric bulb suitable for refrigerator of any capacity screw type / pin type complete all as specified and directed. (Make :- Philips / Equivalent)
Supply & fix of Air filter for window/spilt type AC of any capacity and type complete all as specified and directed.
Material and labour for replacement of damaged outer cover for window type Air conditioner of any capacity and size made out of GI sheet of 20SWG complete all as specified and directed.
Taking out existing unserviceable over load protector and Supply & Fix new over load protector for 1.0 /1.5 /2.0 Ton capacity window type Air Conditioner (Make : Usha/ Ranutral).
Supply and fix in repair sensor remote plate(PCB) suitable for 1.5/2.0 Ton capacity split type AC complete all as specified and directed.
Supply of sensor remote handset suitable for 1.5/2.0 Ton capacity split type AC complete all as specified and directed.
Supply and fix in replacement multipurpose door lock with duplicate key of refrigerator of any make &capacity complete all as specified and directed.
Taking out old unserviceable cooling coil of window/split type AC any capacity and any make with sins cutting in let outlet connecting copper pipe and providing new cooling coil with sins and connecting in let out let copper pipe by bracing and replacement of nut bolts complete all as specified and directed.
Supply & fix Condensing unit Bracket of any size and type suitable for supporting to out door unit of split type AC including nut, bolts & washers complete all as specified and directed.
Supply and fix in replacement Contactor of split type AC any capacity complete all as specified and directed.
Supply and fix in replacement sunction & liquide line valve of size (5/8"&1/4")/(5/8"&3/8") suitable for split type AC complete all as specified and directed.
Repair/eplacement of indoor unit of split type AC 1.5TR capacity having 3 star rating complete with all accessories such as installation plate with screw, blower motor, swing notor, filter and PCB etc duly prewired including reconnecting of existing refrigerant piping, electrical connections, drain pipe etc all as specified and directed. (Note :- Old indoor unit will be deposied to MES (E/M) Store yard.
Repair/replacement of outdoor unit of split type AC 1.5TR cap having 3 star rating complete with all accessories such as hermetically sealed compressor, condenser unit,capacitor, relay, fan motor etc duly prewired including reconnecting of existing refrigerant piping, electrical connection,etc complete all as specified and directed. (Note :- Old Outdoor unit will be deposied to MES (E/M) Store yard
Shree Ayyappa Engineering
shakti engineering and electrical works
somnath engineering corporation
BRITE INDUSTRIES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .