Tender Value
₹5.3 L
EMD Value
₹52,758
Closing Date
20 May 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Repairing and Painting work of Chalak Sangh Union Office under Kargil Park Motijheel Zone-4.
2026_NNKAN_1145626_1
855/AA-4/25-26
Open Tender
Civil Works
Percentage
45 days
Motijheel Kargil park
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹52,758
23 Jul 2026
16 May 2026
20 May 2026
16 May 2026
20 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: 2.1.1 All kinds of soil. | 4 | cum | 170 | ₹680 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm (nominal size) | 0.4 | cum | 5,740 | ₹2,296 |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering. shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-in):3 graded stone aggregate 20 mm nominal size) | 9.1 | cum | 8,720 | ₹79,352 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for (Upto 5th Floor):Foundations, footings, bases for columns | 83.11 | sqm | 212 | ₹17,619.32 |
| 5 | Steel reinforcement for R.C.C. work Including straightening, cutting, bending, placing, in position and binding all complete upto plinth level. | 714.5 | kg | 72 | ₹51,444 |
| 6 | Brick work with common burnt clay (non modular) bricks of class-150 in superstructure above plinth level up to floor V level in all shapes and sizes)Cement mortar 1:4 (1 cement: 4 coarse sand) | 16.6 | cum | 7,500 | ₹1,24,500 |
| 7 | Construction of gramular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401. | 3.1 | cum | 3,671 | ₹11,380.1 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:15:3 (1 Cement: 1.5 coarse sand (zone HD 3 graded stone aggregate 20mm nominal size) | 3.88 | cum | 7,160 | ₹27,780.8 |
| 9 | 12 mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) | 155.3 | sqm | 200 | ₹31,060 |
| 10 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the marmfacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement: 4 course sand), Jointing with grey cement slurry (@3.3 kg/sqm including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600x600 mm | 30.2 | sqm | 1,013 | ₹30,592.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2141718.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.66 MB
BOQ_2141718.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .