Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-AOC 20 VPO KALAYAT 136027 | KALAYAT | KAITHAL | HARYANA | 136027 | ₹36.8 L | L1 | Accepted-AOC OK |
| 2 | L2₹40.6 LRejected-Finance | ₹40.6 L | L2 | Rejected-Finance Reject |
| 3 | L3₹43.9 LRejected-Finance CHAMELA COLONY CHEMALA COLONY NARWANA DISTT JIND 126116 | NARWANA | JIND | HARYANA | 126116 | ₹43.9 L | L3 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Sanchit L1 | M/s Rathi Construction Company L2 | The K Grop Co-op L&C Society Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00NS Items | ||||||
| 1.01 | PROVIDING AND FIXING GATE AND GEARING COMPLETE ALL RESPECT APPROVED CHIEF ENGINEER PANCHKULA VIDE LETTER NO. 2149-50/7LCU/2022 DATE 15-03.2022 | 2.55 | Sqmt. | 47,000 ₹1.2 L | 50,000 ₹1.3 L | 60,000 ₹1.5 L |
Tender Value
₹40.0 L
EMD Value
₹79,925
Closing Date
19 Mar 2026, 11:00 amClosed
GURVINDER SINGH
Kaithal W.S Divn. Kaithal
Estimate for providing 1 nos. Inlet at Kaithal Drain at RD. 57500-R
2026_HRY_507884_1
202601D2FA5B 2ECE 4CCA 820E 5EA85CA0D8F3113IRR
Open Tender
Civil Works
90 days
GUHNA
Estimate for providing 1 nos. Inlet at Kaithal Drain at RD. 57500-R
3 documents required · 3 mandatory
₹2,500
₹79,925
Yes
3 Apr 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
NS Items
PROVIDING AND FIXING GATE AND GEARING COMPLETE ALL RESPECT APPROVED CHIEF ENGINEER PANCHKULA VIDE LETTER NO. 2149-50/7LCU/2022 DATE 15-03.2022
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
HSR Items
[11.25.2]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 2. Raised and cut pointing [Through Rate]
[17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.5]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 5. 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_586652.xls
BOQ • 0.31 MB
AD0154443.pdf
Additional Documents • 0.17 MB
OT0154443.pdf
Other Document • 0.50 MB
Download all tender documents and submit your bid