Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹77.4 LAccepted-AOC | Ist | Accepted-AOC L1 | |
| 2 | IInd₹88.3 LRejected-AOC HAFIZPUR BHAGAT SINGH CHAURAHA SADAR AZAMGARH AZAMGARH UTTAR PRADESH 276001 | AZAMGARH | UTTAR PRADESH | 276001 | IInd | Rejected-AOC L2 | |
| 3 | IIIrd₹89.7 LRejected-AOC | IIIrd | Rejected-AOC L3 |
Tender Value
₹68.6 L
EMD Value
₹70,000
Closing Date
9 May 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
16-ETC-I(A)/ 2022-2023
2022_UPTCL_694787_1
16-ETC-I(A)/ 2022-2023
Open Tender
Electrical Works
Item Rate
60 days
Kaudihar, Soraon
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,260
SE,ETC,PRAYAGRAJ
₹70,000
6 Jun 2022
30 Apr 2022
10 May 2022
30 Apr 2022
9 May 2022
30 Apr 2022
120 days
Amount
Supply of following material for diversion of 132KV Soraon Kuadihar-1st under ETD-1st Prayagraj due to GANGA EXPRESS Way
Accessories for tower
Number Plates
Phase Plate
Danger Board
Earthing material pipe type
Accessories for ACSR Panther Conductor.
Vibration Damper
Mid span compression joint
Repair sleeve
Hardware and insulator
Compression type Single Tension fitting with D-shackle suitable for ACSR Panther Conductor.
Compression type Double Tension fitting with D-shackle suitable for ACSR Panther Conductor.
Single suspension fitting with D-shackle suitable for ACSR Panther Conductor
Disc Insulator 120KN
Disc Insulator 70KN
D Shackle
Ground wire Accessories
Tension Fitting
Vibration Damper
Copper bond
Following work for height raising due to GANGA EXPRESS Way of Existing 132KV Soraon Kuadihar-1stunder ETD-1st Prayagraj
Dismantling of all 3phase of existing ACSR Panther conductor, all Hardware fittings & Accessories e.g., armor rod, Vibration damper, insulator string etc. of existing line and re-rolling of dismantled conductor on empty drum for reuse, safely transportation of all removed material to UPPTCL store.
Dismantling of earth wire by using suitable T&P and skilled labors, complete with all allied works required for diversion of line.
Dismantling of tower including cutting of welded nuts &bolts & all fabrication works.
Carriage of all dismantled materials like tower parts, earth wire, disc insulator and other minor work to be done for completion of the work distance approx.- 08Kms.
Survey including preparation of schedule of materials, marking of locations(route length ),gps survey of line with co-ordinates of each tower(the length of line shall be authenticated by gps survey.
Check survey
Excavation of foundation pits including all work, backfilling & leveling etc.
Setting of stubs of tower foundation with help of template: -
DB+0 Type
DB+5 Type
DC+10 Type
Cost of concreting for all type of foundation including cost of dewatering, shoring, shuttering ramming and curing excluding cost or reinforcement bars but including cost of cement and all other materials with
1:2:4 mix, RCC
1:3:6 /PCC concreting
Transportation of all line material from UPPTCL store to work site carriage of all required material from store to work site including loading, unloading, shifting, counting, sorting and proper stacking including transportation through local carriers as well. As head load etc. as per site condition including its proper temporary storage with care of safety by providing choukidar through completion of all the work.
Erection of super structures of towers their extensions wherever required including all work above ground level excluding hoisting of insulator, hardware & accessories including fitting of danger plate, number plate, phase plate & punching of nuts & bolts.
Tack welding of all the bolts up to the height of one section of the tower or 5 meters from ground level whichever is higher with three tacks at 1200 separation of minimum 10mm thickness with 3.15/4mm electrode and application of zinc rich Al. paints on the affected surface including cost of all material (including tack welding of tower)
Laying stringing, tensioning, clamping, jointing etc. of all three panther conductors complete including hoisting of insulators, fitting of all necessary hardware and accessories i.e. vibration dampers etc.
1X3 Phase
Laying stringing, tensioning, clamping, jointing etc. of earth wire including fitting of all necessary hardware and accessories.
Grounding work including earthwork etc. for pipe type grounding excluding cost earthing materials.
Installation of steel reinforcement bars in R.C.C foundation including cost of steel cutting, bending, placing, binding etc.
Supply of following material for diversion due to GANGA EXPRESS Way of Existing 132KV 132KV Phulpur Soraon LILO @ Kaudihar under ETD-1st Prayagraj
Accessories for tower
Number Plates
Phase Plate
Danger Board
Earthing material pipe type
Accessories for ACSR Panther Conductor.
Vibration Damper
Mid span compression joint
Repair sleeve
Hardware and insulator
Compression type Single Tension fitting with D-shackle suitable for ACSR Panther Conductor.
Compression type Double Tension fitting with D-shackle suitable for ACSR Panther Conductor.
Single suspension fitting with D-shackle suitable for ACSR Panther Conductor
Disc Insulator 120KN
Disc Insulator 70KN
D Shackle
OPGW Cable (48 Fiber)
Supply and installation of hardware set for 48 fiber OPGW
Following work due to GANGA EXPRESS Way of Existing 132KV Phulpur Soraon LILO @ Kaudihar under ETD-1st Prayagraj.
Dismantling of all 3phase of existing ACSR Panther conductor, all Hardware fittings & Accessories e.g. armor rod, Vibration damper, insulator string etc of existing line and re-rolling of dismantled conductor on empty drum for reuse, safely transportation of all removed material to UPPTCL store.
Dismantling of OPG wire by using suitable T&P and skilled labors, complete with all allied works required for diversion of line.
Dismantling of tower including cutting of welded nuts & bolts & all fabrication works.
Carriage of all dismantled materials like tower parts, earth wire, disc insulator and other minor work to be done for completion of the work distance approx.- 08Kms.
Survey including preparation of schedule of material, marking of locations (Route length), GPS survey of line with co-ordinates of each tower (*the length of line shall be authenticated by GPS survey).
Check Survey.
Excavation of foundation pits including all earth work back filling & leveling etc.
Setting of stubs, anchor bolts, including all foundation work but excluding the cost of concreting and excavation.
DB+5 Type
DC+15Type
Cost of concreting for all type of foundation of tower including cost of cement, dewatering, shoring, shuttering, forming and curing but excluding of reinforcement bars with
1:2:4 mix concrete.
1:3:6/ PCC concreting
Storage and transportation of all line materials from 132KV S/S SORAON to work site including loading, unloading, shifting, counting shorting and proper stacking including transportation through local carriers as well as head loading etc. as per site condition including its proper temporary storage with care of safety by providing guards till completion of all work.
Erection of super structures of towers their extensions wherever required including all work above ground level excluding hoisting of insulator, hardware & accessories, including fitting of danger plate, number plate, phase plate bird guard fixing & punching of nuts & bolts.
Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three track at 1200 separation of minimum 10mm thickness with 3.15/4mm electrode and application of zinc rich Al. paints on the affected surface including cost of all material (including tack welding of tower)
Laying stringing, tensioning, clamping, jointing etc. of all three panther conductors complete including hoisting of insulators, fitting of all necessary hardware and accessories i.e. vibration dampers etc.
2X3 phase
Laying stringing, tensioning, clamping, jointing etc. of OPG wire including fitting of all necessary hardware and accessories.
Grounding work including earthwork etc. for pipe type grounding excluding cost earthing materials.
Installation of steel reinforcement bars in R.C.C foundation including cost of steel cutting, bending, placing, binding etc.
Bhagwati Traders
M/S SHEKHAR ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .