Loading…
Loading…
Tender Value
₹5.0 Cr
EMD Value
₹5.0 L
Closing Date
26 Oct 2026, 5:00 pm
Additional chief engineer ,VN Basin, Pkd
O/o ACE VN BASIN PARALAKHEMUNDI
Road works
2026_CEBMB_142167_3
ACE,VNB-06/2026-27
National Competitive Bid
Civil Works - Roads
Percentage
330 days
Sanyasipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹5.0 L
Yes
1 Oct 2026
1 Oct 2026
27 Oct 2026
1 Oct 2026
26 Oct 2026
1 Oct 2026
1 Oct 2026 - 7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of grass and removal of rubbish up to a distance of 50 metres outside the area with supply of all equipments, tools and plants, labour required for the work including supervision charges and all taxes, cess, etc. but excluding GST all complete as per the direction of the Engineer-in-charge. | 38,960 | One Sqm | 2.9 | ₹1,12,984 |
| 2 | Construction of road embankment with approved earth obtained from borrow pits with all leads and lifts, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet the requirement of table 300-2 and Clause 305 of MoSRT&H Specifications for Road & Bridge Works (4th Revision) with all leads, lifts & delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, Cess excluding GST etc.complete as directed by the Engineer-in-charge. (Measurement shall be taken on finished level section) | 15,015 | One Cum | 172.3 | ₹25,87,084.5 |
| 3 | Earth work in excavation of foundation in all kinds of soil including stoney earth and gravel mixed with boulders not exceeding 0.014 cum in volume, D.I.Rock & slushy soil with all leads, lifts, delifts including dressing and leveling the bed to design section and disposal of excavated materials for filling in river bank portion with all leads, lifts and delifts including dewatering, shoring, shuttering and propping of bullah piles and construction of coffer dam if required, bailing out water with all cost, conveyance, labour and cess and , taxes of all materials etc. complete as per the approved drawing, design, specification and direction of the Engineer-in-Charge. | 209.07 | One Cum | 282.9 | ₹59,145.9 |
| 4 | Filling foundation and plinth with sand including watering and ramming with all labour, T&P etc complete to the required level including cost, carriage, royalty, DMF,EMF,additional charges & cess, , taxes of all materials etc complete as per the approved drawing, design, specification and direction of the Engineer-in-Charge. | 67.95 | One Cum | 672.9 | ₹45,723.56 |
| 5 | Supplying, collection good quality of moorum including conveying from stacks and spreading in sub-base in layers watering and compacting to the required density in OMC with Vibratory Roller but excluding cost and conveyance of sub base materials etc complete including royalty, cess, taxes and T&P with all leads, lifts and delifts and all labour etc required for the work complete in all respect and as per specification and as per the direction of the Engineer-in-charge. | 1,462.5 | One Cum | 1,851.8 | ₹27,08,257.5 |
| 6 | Construction of granular sub-base by providing close graded granular materials of Grading-III as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MoRT&H specifications for Road & Bridge works (4th Revision) including royalty, cess, taxes of all materials excluding GST and T&P with all leads, lifts and delifts and all labour etc required for the work complete in all respect and as per specification and as per the direction of the Engineer-in-charge. | 4,602 | One Cum | 2,679.7 | ₹1,23,31,979.4 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision) with all leads, lifts & delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, Cess etc. complete as directed by the Engineer-in-charge. | 2,925 | One Cum | 3,436 | ₹1,00,50,300 |
| 8 | Cleaning the existing granular base surface including removal of binding materials and other foreign materials with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous and disposal of the scarified material away from work site with all leads, lifts, delifts etc. including all labour charges, T&P, hire and running charges of all machineries, Cess etc. complete as directed by the Engineer-in-charge. | 19,500 | One sqm | 23.3 | ₹4,54,350 |
| 9 | Providing and applying primer coat with bitumen emulsion(SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 Kg/sqm using mechanical means as per Clause 502 of MoSRT&H Specifications for Road & Bridge works (4th Revision) with all leads, lifts & delifts including cost, conveyance, taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, Cess etc. complete in all respect, but as directed by the Engineer-in-charge. | 19,500 | one sqm | 98.9 | ₹19,28,550 |
| 10 | Providing and applying tack coat using 3.0 Kg of bitumen emulsion(RS-1) for 10 Sqm on prepared surface of granular base including cleaning of road surface and heating bitumen to required temperature, conveying and applying hot bitumen with all leads, lifts and delifts including cost, conveyance etc. of bitumen and fuel, all labour charges, hire and running charges of tar boilers and all other T & P articles, Cess etc. complete in all respect, but as per specification and as directed by the Engineer-in-charge. | 19,500 | One sqm | 40.2 | ₹7,83,900 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
DTCNSanyasipur.pdf
Tender Documents • 6.51 MB
BOQ_611629.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .