Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.9 L+₹4,021.57 (0.21%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹19.6 L
EMD Value
₹20,000
Closing Date
22 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev.) / Project Director
DRDA, Salem
Salem District - Attur Block - Clean and Green Village in 09 No of Work of - AGAMT - II - 2021-22 Package No.47 /2022-23.
2022_RDTN_239537_119
Roc.No.5182/2021/A16
Open Tender
Civil Works - Others
Item Wise
180 days
DRDA
As per tender document
3 documents required · 3 mandatory
₹0
₹20,000
DRDA, Salem
9 Feb 2023
15 Jul 2022
22 Jul 2022
15 Jul 2022
22 Jul 2022
15 Jul 2022
18 Jul 2022
90 days
Amount
Construction of Vertical Soak pit with drain from Subramani Nagar at Akkichettipalayam Panchayat
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 225 mm size of boulder Stone from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of Rcc Ring
Provision for Supply of Rcc Cover Slab
Provision for Supply of Chamber Rcc Cover Slab
Construction of Harizontal Soak Pit with Drain Near Soolaimedu at Kalpaganur Panchayat (37.75m)
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supplying of Gravel in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying of sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying of Kari in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of M.S weld mesh
Construction of Harizontal Soak Pit with Drain Near Burial Ground Road at Kalpaganur Panchayat (45.50m)
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supplying of Gravel in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying of sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying of Kari in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of M.S weld mesh
Construction of Vertical Soak pit with Drain at Ninarpalayam North side H/O Paithur Panchayat
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 225 mm size of boulder Stone from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of Rcc Ring
Provision for Supply of Rcc Cover Slab
Provision for Supply of Chamber Rcc Cover Slab
Construction of Vertical Soak pit with Drain at Paithur Pudur East side H/O Paithur Panchayat
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 225 mm size of boulder Stone from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of Rcc Ring
Provision for Supply of Rcc Cover Slab
Provision for Supply of Chamber Rcc Cover Slab
Construction of Vertical Soak pit with Drain at Vanapuram Adipallam H/O Paithur Panchayat
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 225 mm size of boulder Stone from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of Rcc Ring
Provision for Supply of Rcc Cover Slab
Provision for Supply of Chamber Rcc Cover Slab
Construction of Harizontal Soak Pit with drain Near Ponniyamman Kovil at Ramanaickenpalayam Panchayat (49m)
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supplying of Gravel in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying of sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying of Kari in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of M.S weld mesh
Construction of Harizontal Soak Pit with drain Near high School at Ramanaickenpalayam Panchayat (35m)
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supplying of Gravel in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying of sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying of Kari in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of M.S weld mesh
Construction of Vertical Soak pit with drain at Ramamoorthy Nagar H/O Ramanaickenpalayam Panchayat (19.25m)
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement 0.00 - 0.30m Depth
Supply of 225 mm size of boulder Stone from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 40mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 20mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Supply of 110 mm Pvc Pipe including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Supply of Rcc Ring
Provision for Supply of Rcc Cover Slab
Provision for Supply of Chamber Rcc Cover Slab
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.Dhanasekaran
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .