| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC accept |
| 2 | L2₹4.2 LRejected-AOC | ₹4.2 L | L2 | Rejected-AOC reject |
| Sl No | Description | Qty | Unit | V.Ramamoorthy L1 | Rajendra Kumar K P L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. Including leveling the sites complete complying with standard specifications and as directed. In sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. TNBP SS NO 20B 23 & 24 | 11.61 | Cum | 246 ₹2,856.06 | 250 ₹2,902.50 |
| 2.00 | Cement concrete 1:4:8 mix (one cement five sand and ten hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Completeas per specification and as direceted TNBP SS NO. 28 | 3.95 | Cum | 6,293 ₹24,857.35 | 6,300 ₹24,885 |
| 3.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement | 2.84 | Cum | 10,086 ₹28,644.24 | 10,100 ₹28,684 |
| 4.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 3.37 | Cum | 10,218 ₹34,434.66 | 10,300 ₹34,711 |
| 5.00 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement | 2.57 | Cum | 6,150 ₹15,805.50 | 6,500 ₹16,705 |
| 6.00 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture. | 0.35 | Cum | 6,237 ₹2,182.95 | 6,500 ₹2,275 |
| 7.00 | Special ceiling plastering in CM 1:3 –10mm thick including cost and conveyance of all materials and all labour charges etc., complete. | 40.6 | Sqm | 302 ₹12,261.20 | 350 ₹14,210 |
| 8.00 | Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete. | 12.92 | Sqm | 280.5 ₹3,624.06 | 300 ₹3,876 |
| 9.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 53.52 | Sqm | 249 ₹13,326.48 | 290 ₹15,520.80 |
| 10.00 | Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC | 13.44 | Sqm | 1,280 ₹17,203.20 | 1,350 ₹18,144 |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
22 Sept 2025, 2:00 pmClosed
Block Development Officer(BP),Vedaranyam
Block Development Office, Vedaranyam
Construction of Cremation Shed at Melakadu in Kariyapattinam Panchayat MLACDS-2025-2026
2025_RDTN_605048_1
RD-NGP/540/2025-A2
Open Tender
Civil Works
Works
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,000
2 Feb 2026
17 Sept 2025
22 Sept 2025
17 Sept 2025
22 Sept 2025
17 Sept 2025
17 Sept 2025 - 22 Sept 2025
Amount
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. Including leveling the sites complete complying with standard specifications and as directed. In sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. TNBP SS NO 20B 23 & 24
Cement concrete 1:4:8 mix (one cement five sand and ten hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Completeas per specification and as direceted TNBP SS NO. 28
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture.
Special ceiling plastering in CM 1:3 –10mm thick including cost and conveyance of all materials and all labour charges etc., complete.
Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 Shuttering.
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 Centering.
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
Cement concrete 1:2:4 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete.
CC road - Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
CC 1:4 :8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering including all charges etc., complete.
Cement Concrete 1:2:4 (One Cement, Three M.Sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering including all charges etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and all labour charges etc., complete.
Providing Bitumen Felt 15 mm thick pad
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity
Rajendra Kumar K P (BID ID -1467023)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid