Tender Value
₹9.9 L
EMD Value
₹19,800
Closing Date
16 Sept 2026, 6:00 pmDue tomorrow
XEN REW JAMMU
XEN OFFICE REW JAMMU
Construction of Community Hall near Shiv Mandir at Ladore Ward No 4 Panchayat Flora Nagbani Block Marh District Jammu under Scheme District Capex Budget DDC for Financial Year 2026-27
2026_RDPR_323353_2
e-NIT No. 535-REWJ of 2026-27 dated 03-09-2026
Open Tender
Civil Works
Percentage
45 days
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹19,800
3 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (All kinds of soil) | 32 | cum | 479.3 | ₹15,337.6 |
| 2 | Providing and Laying in position cement concrete 1 cement :5 fine sand : 10 graded crushed stone aggregates 40 mm size excluding the cost of centring and shuttering - all works upto plinth level | 2.61 | cum | 4,826.5 | ₹12,597.16 |
| 3 | Providing and laying in position cement concrete 1 cement: 3 fine sand :6 graded crushed stone agregates 20 mm size excluding the cost of centring and shuttering - all works upto plinth level | 7.22 | cum | 5,733.6 | ₹41,396.59 |
| 4 | Providing and Laying in positions specified grade of reinforced cement concrete including curing but excluding the cost of centring, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) | 13.64 | cum | 7,788.4 | ₹1,06,233.78 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.58 | cum | 9,395.7 | ₹71,219.41 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.45 | cum | 9,821.85 | ₹1,02,638.33 |
| 7 | Steel reinforcement for R.C.C work including starightening, cutting, bending, placing in position and binding all complete upto plinth level Hot rolled deformed bars Thermo mechanically Treated Bars of grade Fe 500 or more Qty vide item no 4 and 5 @120% | 3,799.49 | kg | 123.2 | ₹4,68,097.17 |
| 8 | Centring and Shuttering including strutting,propping etc removal of form for Foundation, footings, bases of column etc for mass concrete | 107.81 | sqm | 286.35 | ₹30,871.39 |
| 9 | Pillar AGL | 28.62 | sqm | 742.55 | ₹21,251.78 |
| 10 | Beam | 28.25 | sqm | 577.55 | ₹16,315.79 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_1088016.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .