| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC | ₹12.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.9 LRejected-Finance | ₹13.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹14.6 LRejected-Finance | ₹14.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹14.8 LRejected-Finance UTTAR PRADESH | GHAZIABAD | UTTAR PRADESH | 201011 | ₹14.8 L | L4 | Rejected-Finance L4 |
Tender Value
₹20.5 L
EMD Value
₹2.0 L
Closing Date
15 Apr 2026, 12:00 pmClosed
EE PD PWD Ambedkar Nagar
Offfice of the EE PD PWD Ambedkar Nagar
1- Interior decoration, boundary wall construction, painting and whitewashing of the watchman quarters, and construction of the generator room at the VVIP Guest House of the Government Airstrip
2026_CEUFZ_1133493_1
1433/Nivida Date 01-04-2026
Open Tender
Civil Works - Buildings
60 days
Ambedkar Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹2.0 L
Yes
Offfice of the EE PD PWD Ambedkar Nagar
8 May 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | First class bricks work in 1:4 cement and coarse sand mortar of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. CH-6 SOR No. 305b | - | Cum | - | - |
| 2 | Dismantling existing plaster including disposal of refuse as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) | - | Sqm | - | - |
| 3 | 12 mm thick plaster with cement mortar in proportion of 1:3 cement and Coares sand of 1.25 F.M. CH-13 SOR No. 583 | - | Sqm | - | - |
| 4 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire DSR 16.18.1 | - | Rm. | - | - |
| 5 | One priming coat and one coat of dry distemper on new work including supply of all materials labour and T&P etc required for proper completion of work CH-16 SOR No. 681+682 | - | sqm | - | - |
| 6 | Providing and laying Cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone ballast 20 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors. SOR No. 279b | - | cum | - | - |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge. | - | Cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | - | Cum | - | - |
| 9 | Brick work with common burnt clay (non modular) bricks of class 150 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | - | - |
| 10 | R.C.C work with cement approved course sand and 2 cm {3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G. G.I. binding wire and including neccessary centering and shuttering etc. and also including supply of all materials, labours and T & P etc. required for proper completion of the work. Binding wire cost being included in the item. As per SOR SI No. 284b | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 0.57 MB
BOQ_2116994.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid