| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC | ₹4.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.4 L+₹18,600 (4.46%)Rejected-Finance | ₹4.4 L+₹18,600 (4.46%) | 2 | Rejected-Finance L2 |
| 3 | 3₹4.6 L+₹45,340 (10.9%)Rejected-Finance NO 112 KAMARAJAR MANDRA STREET PERIYAMILAGU PARAI TRICHY 620 001 | TIRUCHIRAPPALLI | TAMIL NADU | 620001 | ₹4.6 L+₹45,340 (10.9%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Sivam Associates L3 | Sasi Construciton L1 | T.Govindasamy L2 |
|---|---|---|---|---|---|---|
| 1.00Air Compressor Motor | ||||||
| 1.01 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 5 HP | 1 | Nos | 5,636 ₹5,636 | 5,083 ₹5,083 Lowest | 5,309 ₹5,309 |
| 2.00 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 7.5 HP | 1 | Nos | 6,843 ₹6,843 | 6,172 ₹6,172 Lowest | 6,447 ₹6,447 |
| 3.00 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 5 HP | 1 | Nos | 2,134 ₹2,134 | 1,924 ₹1,924 Lowest | 2,010 ₹2,010 |
| 4.00 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 7.5 HP | 1 | Nos | 2,858 ₹2,858 | 2,578 ₹2,578 Lowest | 2,693 ₹2,693 |
| 5.00 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 5 HP | 1 | Nos | 1,409 ₹1,409 | 1,271 ₹1,271 Lowest | 1,327 ₹1,327 |
| 6.00 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 7.5 HP | 1 | Nos | 1,409 ₹1,409 | 1,271 ₹1,271 Lowest | 1,327 ₹1,327 |
| 7.00 | Labour charges for Cylinder Boring work 5 HP | 1 | Nos | 805 ₹805 | 726 ₹726 Lowest | 759 ₹759 |
| 8.00 | Labour charges for Cylinder Boring work 7.5 HP | 1 | Nos | 1,208 ₹1,208 | 1,089 ₹1,089 Lowest | 1,138 ₹1,138 |
| 9.00 | Labour Charge for Dismandling of Air Compressor with Motor, Removing of Damaged parts and new sparts fixing including conveyance lathe works and all labour charges etc complete.., | 2 | Nos | 1,208 ₹2,416 | 1,089 ₹2,178 Lowest | 1,138 ₹2,276 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
17 Aug 2026, 3:00 pmClosed
Commissioner, Kangeyam Municipality
KANGEYAM MUNICIPALITY
Motor Maintenance at W.No.1 to W.No.18 in Kangeyam Municipality
2026_MAWS_689731_1
1557-1/2026/E1
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
60 days
Kangeyam Municipal Areas
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
3 Sept 2026
30 Jul 2026
17 Aug 2026
30 Jul 2026
17 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Air Compressor Motor | |||||
| 1.01 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 5 HP | 1 | Nos | - | - |
| 2 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 7.5 HP | 1 | Nos | - | - |
| 3 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 5 HP | 1 | Nos | - | - |
| 4 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 7.5 HP | 1 | Nos | - | - |
| 5 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 5 HP | 1 | Nos | - | - |
| 6 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 7.5 HP | 1 | Nos | - | - |
| 7 | Labour charges for Cylinder Boring work 5 HP | 1 | Nos | - | - |
| 8 | Labour charges for Cylinder Boring work 7.5 HP | 1 | Nos | - | - |
| 9 | Labour Charge for Dismandling of Air Compressor with Motor, Removing of Damaged parts and new sparts fixing including conveyance lathe works and all labour charges etc complete.., | 2 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_829117.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_829117.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .