Loading…
Loading…
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
21 Sept 2026, 6:00 pm5d left
Executive Engineer Flood Control Division Kakapora
Flood Control Division Kakapora near police station
Construction of flood protection work on Left Side Upstream Lelhar Bridge at Kakapora RD 35500m to 35600m
2026_IFC_322883_6
E-NIT No 08 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Kakapora
Please refer Tender documents.
2 documents required · 2 mandatory
₹750
Executive Engineer Flood Control Division Kakapora
₹30,000
Yes
31 Aug 2026
31 Aug 2026
22 Sept 2026
31 Aug 2026
21 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 92.16 | cum | 187.3 | ₹17,261.57 |
| 2 | Extra for . In or under waterand / or liquid mud, including pumping ou water as required . | 155.7 | cum | 37.46 | ₹5,832.52 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : in all kinds of soil. 1st lift | 93.24 | cum | 89.75 | ₹8,368.29 |
| 4 | 2nd lift | 91.26 | cum | 89.75 | ₹8,190.59 |
| 5 | Close timbering in trenches including strutting, shoring & packing cavaties depth exceeding 3m but not exceeding 4,5m. | 54 | sqm | 281.3 | ₹15,190.2 |
| 6 | Laying of stone/stone soling | 53.86 | cum | 237.9 | ₹12,813.29 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.6 | cum | 5,202.9 | ₹18,730.44 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 7.2 | cum | 7,788.4 | ₹56,076.48 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
cum
cum
7788.40
7104.3 | 0.9 | cum | 7,104.35 | ₹6,393.92 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete | 15.7 | sqm | 286.35 | ₹4,495.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1085329.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .