| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC NEW NO 25 DHARMAPURI STREET EXTENSION KOODAPAKKAM POST VILLIANUR PUDUCHERRY 605 502 | VILLUPURAM | TAMIL NADU | 605502 | ₹2.9 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | R.JEYAKUMAR L1 |
|---|---|---|---|---|
| 1.00 | Code No. 2.8.1 Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil | 33.7 | cum | 300 ₹10,110 Lowest |
| 2.00 | Code No. 2.26.1 Extra for every additional lift of 1.5m or part there of in excavation / banking excavated or stacked materials - all kinds of soil | 3.4 | cum | 300 ₹1,020 Lowest |
| 3.00 | Code No. 2.27 Supplying and filling in plinth with river sand under floors, including watering, ramming consolidating and dressing complete | 2.31 | cum | 300 ₹693 Lowest |
| 4.00 | Code No. 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) | 3.21 | cum | 8,000 ₹25,680 Lowest |
| 5.00 | Code No. 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 4.86 | cum | 9,000 ₹43,740 Lowest |
| 6.00 | Code No 4.3.2 Centring and shuttering including strutting , propping etc. and removal of form work for - retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 41.57 | sqm | 600 ₹24,942 Lowest |
| 7.00 | Code No: 5.33.1.1 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work: using coarse aggregate and fine aggregate,Portand Pozzolana / Ordinary Portland / Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelarate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of Engineer-in charge.- all works upto plinth level - Concrete of M25 grade with minimum cement content of 330 kg / cum - Note: Extra cement upto 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | 1.33 | cum | 200 ₹266 Lowest |
| 8.00 | Code No. 5.22.6 Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe - 500D or more | 294.9 | Kg | 100 ₹29,490 Lowest |
| 9.00 | Code No.13.1.1 12mm cement plaster of mix -1:4 ( 1 cement : 4 fine sand) | 92.36 | sqm | 400 ₹36,944 Lowest |
| 10.00 | Code No. 13.82.2 Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams / litre
, of approved brand and manufacturer, including applying additional coats wherever required, to achive even shade and colour - Two coats | 14.78 | sqm | 450 ₹6,651 Lowest |
Tender Value
₹2.8 L
EMD Value
₹9,605
Closing Date
14 May 2026, 3:30 pmClosed
BLOCK DEVELOPMENT OFFICER, ARIANKUPPAM BLOCK
BLOCK DEVELOPMENT OFFICE, No.221, SRIDHAR NAGAR, ARIANKUPPAM, PUDUCHERRY.
Construction of Community soakpit at Sooramangalam, Nonamkuppam and Veerampatinam Village panchayat in Ariankuppam Block, Puducherry (5 Nos).
2026_DRDA_22090_1
18/BDO(A)/AE/SBM(G)/2025-26
Open Tender
Civil Works
Item Rate
90 days
Sooramangalam, Nonamkuppam and Veerampatinam
Please refer Tender documents.
3 documents required · 3 mandatory
₹525
₹9,605
14 Aug 2026
7 May 2026
15 May 2026
7 May 2026
14 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Code No. 2.8.1 Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil | 33.7 | cum | - | - |
| 2 | Code No. 2.26.1 Extra for every additional lift of 1.5m or part there of in excavation / banking excavated or stacked materials - all kinds of soil | 3.4 | cum | - | - |
| 3 | Code No. 2.27 Supplying and filling in plinth with river sand under floors, including watering, ramming consolidating and dressing complete | 2.31 | cum | - | - |
| 4 | Code No. 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) | 3.21 | cum | - | - |
| 5 | Code No. 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 4.86 | cum | - | - |
| 6 | Code No 4.3.2 Centring and shuttering including strutting , propping etc. and removal of form work for - retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 41.57 | sqm | - | - |
| 7 | Code No: 5.33.1.1 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work: using coarse aggregate and fine aggregate,Portand Pozzolana / Ordinary Portland / Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelarate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of Engineer-in charge.- all works upto plinth level - Concrete of M25 grade with minimum cement content of 330 kg / cum - Note: Extra cement upto 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | 1.33 | cum | - | - |
| 8 | Code No. 5.22.6 Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe - 500D or more | 294.9 | Kg | - | - |
| 9 | Code No.13.1.1 12mm cement plaster of mix -1:4 ( 1 cement : 4 fine sand) | 92.36 | sqm | - | - |
| 10 | Code No. 13.82.2 Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams / litre
, of approved brand and manufacturer, including applying additional coats wherever required, to achive even shade and colour - Two coats | 14.78 | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 0.36 MB
BOQ_22549.xls
BOQ • 0.25 MB
CORRIGENDUM.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .