Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC NO 1 1ST MAIN ANANDNAGAR ATRIA INSTITUTE OF TECHNOLOGY CAMPUS HEBBAL BANGALURU 560 024 | BENGALURU URBAN | KARNATAKA | 560024 | ₹39.0 L Quoted ₹39.1 L | L1 | Accepted-AOC AOC |
| 2 | L2₹45.6 L+₹6.5 L (16.6%)Rejected-Finance | ₹45.6 L+₹6.5 L (16.6%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹46.7 L+₹7.6 L (19.5%)Rejected-Finance NO 71 1ST CROSS MUNESWARA BLOCK PALACE GUTTAHALLI BANGALORE 560 003 | BENGALURU URBAN | KARNATAKA | 560003 | ₹46.7 L+₹7.6 L (19.5%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹46.8 L+₹7.8 L (19.9%)Rejected-Finance NO 354 2ND CROSS VARADARAJNAGAR VIDYARANYAPURA POST BANGALORE 5600 097 | 5600097 | ₹46.8 L+₹7.8 L (19.9%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹48.6 L+₹9.5 L (24.4%)Rejected-Finance NO 26 SRI GANESH 7TH CROSS BDS NAGAR DIBBUR RAMAIAH LAYOUT K NARAYANPURA MAIN ROAD BANGALORE 560 077 | BENGALURU URBAN | KARNATAKA | 560077 | ₹48.6 L+₹9.5 L (24.4%) | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | Eeguchi Constructions L1 | VIKAS CONSTRUCTIONS L7 | S SUDHAKAR L6 | Lakkaiah Rangaswamy L3 | M/S J P Construction L2 | SP ENTERPRISES L8 | S S BUILDERS L4 | SRI GANESH ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for spraying antiweed / non toxic solution / chemicals containing Glyphosate as per manufacture instructions and removing the weed including the roots after ensuring complete de-germification of palnt/weed and cutting down the plant/trees off from roof/top sides of external walls of bldgs, in chajjas, wall junctions, junctions of GI/CI/AC/PVC pipes and taking out roots entered in wall/slabs, including making good the surface using PCC 1:2:4 type B1 or cement mortar (1:2) or brick work in CM(1:4) plastered with CM(1:4) including painting to match with existing surface and repairing the pipes and joints which was affected by cutting down/taking out process all as specified and as directed for plants / trees located in the buildings with necessary scaffolding up to First floor, complete all as specified and directed by Engineer-in-charge.
NOTE:- Contractor has to execute the work of de-generated plant/weeds as per the prior approval and directions of Engineer-in-charge. | 50 | PER PALNT | 100 ₹5,000 Lowest | 355 ₹17,750 | 200 ₹10,000 | 170 ₹8,500 | 170 ₹8,500 | 220 ₹11,000 | 180 ₹9,000 | 200 ₹10,000 |
| 2.00 | All as per Item No 1 above, but from first floor to second floor | 75 | PER PALNT | 150 ₹11,250 Lowest | 365 ₹27,375 | 250 ₹18,750 | 200 ₹15,000 | 220 ₹16,500 | 240 ₹18,000 | 210 ₹15,750 | 250 ₹18,750 |
| 3.00 | All as per Item No 1 above, but from second floor to third floor | 100 | PER PALNT | 200 ₹20,000 Lowest | 390 ₹39,000 | 300 ₹30,000 | 250 ₹25,000 | 280 ₹28,000 | 260 ₹26,000 | 240 ₹24,000 | 300 ₹30,000 |
| 4.00 | Material and labour for cleaning of Roof at any height (on accessible/inaccessible roofs) by removing all scale, dirt, mud, any foreign material, accumulated silt, other dirty substance, algae, fungus , leaves etc deposited over slab and making good the distrubed surfaces if any with and including making good the surface using PCC 1:2:4 type B1 or cement mortar (1:2) or brick work in CM(1:4) plastered with CM(1:4) to match with existing surface and removing the material so obtained out side complete all as specified and directed by Engineer-in-charge. | 2,500 | SQUARE METRE | 15 ₹37,500 Lowest | 40 ₹1,00,000 | 200 ₹5,00,000 | 30 ₹75,000 | 35 ₹87,500 | 45 ₹1,12,500 | 35 ₹87,500 | 150 ₹3,75,000 |
| 5.00 | Material and labour for cleaning of PVC/RCC over head water tanks at any height (on accessible/inaccessible roofs) by removing all scale, dirt, mud, any foreign material, accumulated silt, other dirty substance, algae, fungus and any other bacterial material from sides/bottom of tank, cleaning shall be done by draining / pumping out water / sludge from bottom, by high pressure water jet of pressure not less than 120 PSI for removing clogged mud/scales etc and cleaning the same again with self priming pumped fresh water and disinfecting the water tank by using UV radiator and approved chemical (chlorite), after cleaning writing letter / figures (Date of cleaning and next Date of cleaning) on black back ground with white synthetic enamel paint including removing the existing letters/ figures complete all as specified and as directed for capacity of water tank exc 250 & n. exc 500 lit capacity. | 800 | EACH | 210 ₹1,68,000 Lowest | 350 ₹2,80,000 | 300 ₹2,40,000 | 250 ₹2,00,000 | 270 ₹2,16,000 | 270 ₹2,16,000 | 230 ₹1,84,000 | 500 ₹4,00,000 |
| 6.00 | All as per Item No 5 above, but Exc 500 litre N.exc 1000 ltr capacity | 30 | EACH | 250 ₹7,500 Lowest | 450 ₹13,500 | 350 ₹10,500 | 270 ₹8,100 | 250 ₹7,500 Lowest | 300 ₹9,000 | 260 ₹7,800 | 500 ₹15,000 |
| 7.00 | Taking down cement plaster of any description including racking out joints, hacking for key and disposal of debris to out side MD land all as specified and as directed. | 545 | SQUARE METRE | 60 ₹32,700 | 30 ₹16,350 Lowest | 60 ₹32,700 | 80 ₹43,600 | 37 ₹20,165 | 80 ₹43,600 | 70 ₹38,150 | 80 ₹43,600 |
| 8.00 | M&L for Rendering 15mm thick in CM 1:6 on brick or concrete surfaces , finished even and smooth with out using extra cement.(Internal Surfaces) | 95 | SQUARE METRE | 260 ₹24,700 Lowest | 340 ₹32,300 | 390 ₹37,050 | 270 ₹25,650 | 350 ₹33,250 | 320 ₹30,400 | 350 ₹33,250 | 380 ₹36,100 |
| 9.00 | M&L for rendering 15 mm thick on other than fair faces of brick work or concrete surfaces in cement mortar 1:4 with WPC, finished plastered surface even and smooth without using extra cement (External Surfaces)
Note :- WPC will be measured and paid separately | 300 | SQUARE METRE | 390 ₹1,17,000 | 390 ₹1,17,000 | 400 ₹1,20,000 | 420 ₹1,26,000 | 380 ₹1,14,000 Lowest | 470 ₹1,41,000 | 430 ₹1,29,000 | 380 ₹1,14,000 Lowest |
| 10.00 | Supply only liquid water proofing compound | 11.14 | LITRE | 190 ₹2,116.6 | 250 ₹2,785 | 200 ₹2,228 | 200 ₹2,228 | 200 ₹2,228 | 220 ₹2,450.8 | 200 ₹2,228 | 120 ₹1,336.8 Lowest |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
10 Jul 2026, 6:00 pmClosed
GE North Bangalore
GARRISON ENGINEER NORTH BANGALORE T 64 MEANEE LINESMEG AND CENTRE BANGALORE 560042
CLEARING OF VEGETATION CLEANING OF SERVICE TANKS PERIODICAL SERVICES AT MD ACCN OF VASANTH ENCLAVE MI ML KATOCH LINE AREA IN THE AOR OF AGE BR NORTH UNDER GE NORTH BANGALORE
2026_MES_773345_1
8327
Open Tender
Civil Works
Works
180 days
Bangalore
Class D Category a(i)
9 documents required · 9 mandatory
₹500
Yes
GARRISON ENGINEER NORTH BANGALORE
₹96,000
Yes
7 Sept 2026
19 Jun 2026
14 Jul 2026
19 Jun 2026
10 Jul 2026
3 Jul 2026
19 Jun 2026 - 3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for spraying antiweed / non toxic solution / chemicals containing Glyphosate as per manufacture instructions and removing the weed including the roots after ensuring complete de-germification of palnt/weed and cutting down the plant/trees off from roof/top sides of external walls of bldgs, in chajjas, wall junctions, junctions of GI/CI/AC/PVC pipes and taking out roots entered in wall/slabs, including making good the surface using PCC 1:2:4 type B1 or cement mortar (1:2) or brick work in CM(1:4) plastered with CM(1:4) including painting to match with existing surface and repairing the pipes and joints which was affected by cutting down/taking out process all as specified and as directed for plants / trees located in the buildings with necessary scaffolding up to First floor, complete all as specified and directed by Engineer-in-charge.
NOTE:- Contractor has to execute the work of de-generated plant/weeds as per the prior approval and directions of Engineer-in-charge. | 50 | PER PALNT | - | - |
| 2 | All as per Item No 1 above, but from first floor to second floor | 75 | PER PALNT | - | - |
| 3 | All as per Item No 1 above, but from second floor to third floor | 100 | PER PALNT | - | - |
| 4 | Material and labour for cleaning of Roof at any height (on accessible/inaccessible roofs) by removing all scale, dirt, mud, any foreign material, accumulated silt, other dirty substance, algae, fungus , leaves etc deposited over slab and making good the distrubed surfaces if any with and including making good the surface using PCC 1:2:4 type B1 or cement mortar (1:2) or brick work in CM(1:4) plastered with CM(1:4) to match with existing surface and removing the material so obtained out side complete all as specified and directed by Engineer-in-charge. | 2,500 | SQUARE METRE | - | - |
| 5 | Material and labour for cleaning of PVC/RCC over head water tanks at any height (on accessible/inaccessible roofs) by removing all scale, dirt, mud, any foreign material, accumulated silt, other dirty substance, algae, fungus and any other bacterial material from sides/bottom of tank, cleaning shall be done by draining / pumping out water / sludge from bottom, by high pressure water jet of pressure not less than 120 PSI for removing clogged mud/scales etc and cleaning the same again with self priming pumped fresh water and disinfecting the water tank by using UV radiator and approved chemical (chlorite), after cleaning writing letter / figures (Date of cleaning and next Date of cleaning) on black back ground with white synthetic enamel paint including removing the existing letters/ figures complete all as specified and as directed for capacity of water tank exc 250 & n. exc 500 lit capacity. | 800 | EACH | - | - |
| 6 | All as per Item No 5 above, but Exc 500 litre N.exc 1000 ltr capacity | 30 | EACH | - | - |
| 7 | Taking down cement plaster of any description including racking out joints, hacking for key and disposal of debris to out side MD land all as specified and as directed. | 545 | SQUARE METRE | - | - |
| 8 | M&L for Rendering 15mm thick in CM 1:6 on brick or concrete surfaces , finished even and smooth with out using extra cement.(Internal Surfaces) | 95 | SQUARE METRE | - | - |
| 9 | M&L for rendering 15 mm thick on other than fair faces of brick work or concrete surfaces in cement mortar 1:4 with WPC, finished plastered surface even and smooth without using extra cement (External Surfaces)
Note :- WPC will be measured and paid separately | 300 | SQUARE METRE | - | - |
| 10 | Supply only liquid water proofing compound | 11.14 | LITRE | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_865934.xls
BOQ • 0.37 MB
8327Tender.pdf
Tender Documents • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .