Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC 115A 41A 36 TILAK NAGAR ALLAHABAD U P 211006 | PRAYAGRAJ | UTTAR PRADESH | 211006 | ₹19.3 L | L1 | Accepted-AOC Lowest Rate Quoted. |
| 2 | L2₹20.4 L+₹1.1 L (5.64%)Rejected-Finance 220 F 2 A JAYANTIPUR ALLAHABAD U P 211 011 | ALLAHABAD | ALLAHABAD | U P | 211011 | ₹20.4 L+₹1.1 L (5.64%) | L2 | Rejected-Finance Not quoted lowest Rate. |
| 3 | L3₹22.7 L+₹3.4 L (17.8%)Rejected-Finance 2 B 4 K NEAR BY PASS PHAPHAMAU PRAYAGRAJ UP 211013 | PRAYAGRAJ | UTTAR PRADESH | 211013 | ₹22.7 L+₹3.4 L (17.8%) | L3 | Rejected-Finance Not quoted lowest Rate. |
| 4 | L4₹26.1 L+₹6.8 L (35.3%)Rejected-Finance | ₹26.1 L+₹6.8 L (35.3%) | L4 | Rejected-Finance Not quoted lowest Rate. |
| 5 | L5₹30.4 L+₹11.1 L (57.7%)Rejected-Finance C O OPPOSITE BDO OFFICE MANDA AKHNOOR DISTT JAMMU PIN 181201 | JAMMU | JAMMU AND KASHMIR | 181201 | ₹30.4 L+₹11.1 L (57.7%) | L5 | Rejected-Finance Not quoted lowest Rate. |
| Sl No | Description | Qty | Unit | M/S SAHAJ ENTERPRISES L3 | DEEPAK ENTERPRISES L5 | M/S VIJAY CONSTRUCTION L1 | M/s S. K. Constructions L4 | BINOD L6 | SWRAN ENTERPRISES L2 | INDO MEP CONTRACTOR AND ENGINEERS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of foot path / pavement along the boundary of the vacant land adjacent to Boys hostel - V at IIITA | ||||||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all kinds of soil. | 105 | Sqm | 19,950 ₹19,950 | 27,331.5 ₹27,331.5 | 25,200 ₹29,736 | 24,150 ₹24,150 | 18,375 ₹21,682.5 | 14,910 ₹17,593.8 Lowest | 16,800 ₹19,824 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 75 | Cum | 3,45,000 ₹3,45,000 | 4,88,895 ₹4,88,895 | 2,62,500 ₹3,09,750 Lowest | 4,50,000 ₹4,50,000 | 4,23,900 ₹5,00,202 | 2,64,450 ₹3,12,051 | 5,25,000 ₹6,19,500 |
| 1.03 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 51.75 | Cum | 2,84,625 ₹2,84,625 | 3,81,431.14 ₹3,81,431.14 | 2,58,750 ₹3,05,325 | 3,51,900 ₹3,51,900 | 3,06,981 ₹3,62,237.58 | 2,20,662 ₹2,60,381.16 Lowest | 4,39,875 ₹5,19,052.5 |
| 1.04 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 69 | Cum | 4,83,000 ₹4,83,000 | 6,44,760.15 ₹6,44,760.15 | 3,58,800 ₹4,23,384 Lowest | 5,10,600 ₹5,10,600 | 4,97,835 ₹5,87,445.3 | 4,14,000 ₹4,88,520 | 6,55,500 ₹7,73,490 |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 105 | Cum | 12,600 ₹12,600 | 20,580 ₹20,580 | 9,450 ₹11,151 Lowest | 20,580 ₹20,580 | 22,680 ₹26,762.4 | 11,130 ₹13,133.4 | 14,700 ₹17,346 |
| 1.06 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 126 | Cum | 81,900 ₹81,900 | 88,263 ₹88,263 | 56,700 ₹66,906 | 1,00,800 ₹1,00,800 | 3,20,292 ₹3,77,944.56 | 47,754 ₹56,349.72 | 37,800 ₹44,604 Lowest |
| 1.07 | Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).
11.20.1 Light shade pigment using white cement | 770 | Sqm | 8,47,000 ₹8,47,000 | 10,79,540 ₹10,79,540 | 5,00,500 ₹5,90,590 Lowest | 8,85,500 ₹8,85,500 | 8,15,430 ₹9,62,207.4 | 5,83,660 ₹6,88,718.8 | 11,55,000 ₹13,62,900 |
| 1.08 | CEMENT PLASTER (IN COARSE SAND) 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) sqm | 530 | Sqm | 1,32,500 ₹1,32,500 | 1,89,395.5 ₹1,89,395.5 | 1,27,200 ₹1,50,096 | 1,59,000 ₹1,59,000 | 1,88,150 ₹2,22,017 | 1,02,820 ₹1,21,327.6 | 71,550 ₹84,429 Lowest |
| 1.09 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of
suitable shade with ordinary paint of approved brand and manufacture. | 530 | Sqm | 63,600 ₹63,600 | 1,19,912.5 ₹1,19,912.5 | 34,450 ₹40,651 Lowest | 1,06,000 ₹1,06,000 | 58,300 ₹68,794 | 66,250 ₹78,175 | 76,850 ₹90,683 |
Tender Value
Refer Docs
EMD Value
₹91,500
Closing Date
2 May 2026, 5:00 pmClosed
Deputy Registrar SP
Stores and Purchase Section IIIT-A Jhalwa Prayagraj
Construction of Footpath Pavement along with the Boundary of the Vacant Land Adjacent to Boys Hostel V at IIIT-A
2026_IIITA_905247_1
IIIT-A/SP/1880/2685/2026
Open Tender
Civil Works - Others
Works
112 days
IIIT Allahabad
As per tender document clause 6
3 documents required · 3 mandatory
₹0
₹91,500
Yes
20 Aug 2026
11 Apr 2026
4 May 2026
11 Apr 2026
2 May 2026
11 Apr 2026
11 Apr 2026 - 18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of foot path / pavement along the boundary of the vacant land adjacent to Boys hostel - V at IIITA | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all kinds of soil. | - | Sqm | - | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | - | Cum | - | - |
| 1.03 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | - | Cum | - | - |
| 1.04 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) | - | Cum | - | - |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | Cum | - | - |
| 1.06 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | Cum | - | - |
| 1.07 | Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).
11.20.1 Light shade pigment using white cement | - | Sqm | - | - |
| 1.08 | CEMENT PLASTER (IN COARSE SAND) 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) sqm | - | Sqm | - | - |
| 1.09 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of
suitable shade with ordinary paint of approved brand and manufacture. | - | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_951495.xls
BOQ • 0.27 MB
1234.pdf
Tender Documents • 0.75 MB
Corr-1880.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .