Loading…
Loading…
Tender Value
₹2.7 L
EMD Value
₹5,300
Closing Date
13 Jul 2026, 5:00 pm
KAMALDEEP
Municipal Committee Julana
Repair, Maintenance and P/Fixing 4 No. Iron Gate of Old Anaj Mandi, Julana
2026_HRY_532527_1
2026FF4B4941 8849 4384 B4EE 09912DA59540353ULB
Open Tender
Civil Works
60 days
Julana
2 documents required · 2 mandatory
₹500
₹5,300
Yes
30 Jun 2026
30 Jun 2026
14 Jul 2026
30 Jun 2026
13 Jul 2026
30 Jun 2026
30 Jun 2026 - 2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. [Through Rate] | 159.6 | Sqm | 59 | ₹9,416.4 |
| 2 | [11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [Through Rate] | 159.6 | Sqm | 22 | ₹3,511.2 |
| 3 | [11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [Through Rate] | 101.42 | Sqm | 19 | ₹1,926.98 |
| 4 | [11.71.1]Wall painting on a cement plaster surface with acrylic emulsion paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate] | 159.6 | Sqm | 54 | ₹8,618.4 |
| 5 | [11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 159.6 | Sqm | 114 | ₹18,194.4 |
| 6 | [11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate] | 101.42 | Sqm | 49 | ₹4,969.58 |
| 7 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 2,400 | Kg. | 83 | ₹1,99,200 |
| 8 | [3.1.3]By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge [3km] | 1.76 | cum | 88 | ₹154.88 |
| 9 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 0.97 | cum | 78 | ₹75.66 |
| 10 | [5.45]Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. [Through Rate] | 146.94 | Sqm | 33 | ₹4,849.02 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_611591.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid