| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC RAJBARI PARA JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹7.4 L+₹10,976.48 (1.50%)Rejected-Finance 778 N LOWER CHELIDANGA ASANSOL PASCHIM BARDHAMAN | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | L2 | Rejected-Finance NOT L1 BIDDER | |
| 3 | L3₹7.6 L+₹26,375.73 (3.61%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L3 | Rejected-Finance NOT L1 BIDDER |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
2 Sept 2024, 4:00 pmClosed
Executive Engineer,Asansol Mechanica Division
Office of the Executive Engineer,Asansol Mechanical Divisio,Public Health Engineering Directorate,PASCHIM BARDHAMAN 713 305
Repairing and Overhauling of 1250 KVA Indoor type transformer at Kalajharia Head Works Site under RCFA Part-II Water Supply Scheme.
2024_PHED_731550_5
WBPHED/EE/AMD/NIeT-16 of 2024-2025
Open Tender
Miscellaneous Works
Item Wise
20 days
KALAJHARIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,000
22 Nov 2024
9 Aug 2024
4 Sept 2024
9 Aug 2024
2 Sept 2024
9 Aug 2024
Amount
Disconnection of the 1250 KVA transformer from H.T. & L.T. side from HT sides with proper protection by engaging skilled Electrician.(1250 KVA Transformer)
Drain out the old transformer oil from the transfomer up to the bottom level keep the same in an empty drum including supply of empty drum as per direction.(1460 Ltrs approx.) (1250 KVA Transformer)
Supply of Transformer oil as per IS:335(1993) specification in a sealed drum.(Make-Servo/Transol/approved make)
Atfirst loosening of cover bolts then removing of Top cover to cleaning the insides like Cores, Windings etc with removal of sludge from the tank as per direction.(1250 KVA Transformer)
Supply and delivery of Gasket for HV & LV Bushings, Radiator, Oil Line, Top Cover also Conical Rubber Washer's etc for whole Transformer body as per direction.(3 Nos-1250 KVA)
Supply & Delivery of Silica gel, breathers, LT Bushings Etc for the 1250 KVA Transformer.
Fitting, fixing cork/gasket,inner and outer portion of the porcelin bushing and at HV and LV side including tank top cover/inspection cover after taking out the damaged gaskets, Whole Complete As per direction.(1250 KVA Transformer-3 Nos)
Placing the top cover and inspection cover in proper position and also tightening of nuts and bolts after cleaning of the surface sludge of core and coil assembly with hot oil through filter machine for 1250 KVA as per direction of EIC.(1250 KVA Transformer)
Filling the transformer oil through filter machine by old oil and new supply oil after filtration to the 1250 KVA Transformer+with its OLTC Portion engaging skilled and unskilled personnel for increasing IR value as per direction including hire charges of oil filter machine and oil testing equipment and 5 KVA DG set and carraige the same from and back as per direction of EIC.(1250 KVA Transformer)
Making necessary connection of Transformer at HT and LT sides after cleaning,washing tightened up the cable end with cable termination Kit and wrapping with new adhesive and insulation tapes,including testing and commissioning all complete as per direction of EIC.(Both L.V. & H.V. Sides of 1250 KVA Transformer)
Break Down Voltage testing of transformer oil and submitted to office as per direction.
Add. GST@18%
Add. Cess@1%
M/s. SOMA ENTERPRISE (BID ID -5465307)
EASTERN INDIA SALES AND SERVICE (BID ID -5466309)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .